MAHA-RERA Application

General Information

Other Than Individual

Organization

Incline Realty Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

3rd Floor
Commerz
International Business Park
Goregaon East
Oberoi Garden City
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400063

Organization Contact Details

02266773333
www.oberoirealty.com

Past Experience Details

Member Information

Member Name Designation Photo
Saumil Daru Authorized Signatory View Photo
Rajendra Chandorkar Authorized Signatory View Photo
Rajesh Gaonkar Authorized Signatory View Photo

Project

Sky City Towers A to D
On-Going Project
31/12/2021
31/12/2022
Yes
Residential
No
CTS No 107/E pt of Village Magathane
CTS No 107 E pt of Village Magathane
CTS No 107 E pt of Village Magathane
CTS No 107 E pt of Village Magathane
CTS No 107 E pt of Village Magathane
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400092
3619.32
4
4
0
0

FSI Details

7472
152528.42
160000.42

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) NA NA 0
Covered Parking ( In Numbers) 3329 NA 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Will be provided
Water Supply : YES 0 Will be provided
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Will be provided
Storm Water Drains : YES 0 Will be provided
Landscaping & Tree Planting : YES 0 Will be provided
Street Lighting : YES 0 Will be provided
Open Parking : NO 0 NA
Community Buildings : YES 0 Common Clubhouse for all residential development
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Will be provided
Solid Waste Management And Disposal : YES 0 Will be provided
Water Conservation, Rain water Harvesting : YES 0 Will be provided
Energy management : YES 0 Will be provided
Fire Protection And Fire Safety Requirements : YES 0 Will be provided
Prop Public Parking to be handed over to MCGM at any location in LargerProperty incl under RE Proj : YES 0 Approval in process
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Will be provided as necessary
Aggregate area of recreational Open Space : YES 0 To be provided as per provisions of DCR

Building Details

Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Sky City Towers A to D Tower A 3 1 8 64 2 0 803
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK Luxury Zone 1 99.71 157 127
2 3BHK Luxury Zone 2 101.68 158 40
3 Luxury Duplex Zone 1 161.98 3 0
4 Luxury Duplex Zone 2 163.91 2 0
5 Prime 128.99 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 25
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Sky City Towers A to D Tower B 3 1 8 64 2 0 836
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK Luxury Zone 1 99.71 108 89
2 3BHK Luxury Zone 2 101.68 104 45
3 3BHK Grande Zone 1 100.34 52 45
4 3BHK Grande Zone 2 102.33 56 37
5 Grande Studio 23.45 108 82
6 Prime 124.44 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 2
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 25.2
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 Sky City Towers A to D Tower C 3 1 8 64 2 0 849
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Grande Duplex Zone 2 174.19 2 0
2 Grande Studio 23.45 52 25
3 3BHK Luxury Zone 1 99.71 144 121
4 3BHK Luxury Zone 2 101.68 136 19
5 3BHK Grande Zone 1 100.34 25 17
6 3BHK Grande Zone 2 102.33 22 8
7 Grande Duplex Zone 1 172.26 3 0
8 Prime 157.87 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 1
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 25.1
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 Sky City Towers A to D Tower D 3 1 8 64 2 0 841
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Prime 124.44 1 0
2 3BHK Luxury Zone 1 99.71 110 64
3 3BHK Luxury Zone 2 101.68 104 1
4 3BHK Grande Zone 1 100.34 52 31
5 3BHK Grande Zone 2 102.33 56 4
6 Grande Studio 23.45 108 35
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 25

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Larsen & Toubro Limited (Civil Contractor) NA Contractor
Architect Sunil Arora NA Architect
WME Consultants NA Structural Engineer
Ted Jacob Engineering Group NA Other
The Boundary Layer, Wind Tunnel Laboratory NA Other
Fortune Consultants Ltd NA Other
Geocon International Pte Ltd NA Other
En3 Sustainability Solutions Pvt. Ltd. NA Other
A.A. Nayak Constructions Pvt Ltd NA Other
MEP Contractor and Fire Fighting Contractor (To be appointed) NA Other
Façade Consultant (To be appointed) NA Other
Traffic Consultant (To be appointed) NA Other
Windows Contractor (To be appointed) NA Other
Elevator Contractor (To be appointed) NA Other

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Sky City Towers A to D Bombay City Civil Court Dindoshi Long Cause Suit No 1794 Civil No Suit 2016 Pending and Ad interim relief sought by the other party has been refused
NA
Sky City Towers A to D Small Causes Court Bandra LE Suit Number 84 Civil No Suit 2007 Pending
NA
Sky City Towers A to D Bombay High Court PIL No 48 Civil No Writ Petition 2017 Pending
NA

Uploaded Documents

Document Name Uploaded Document
Declaration in FORM B
Details of encumbrances
Commencement Certificates
Building Plan Approval (IOD)
Copy of the legal title report
Proforma of the allotment letter and agreement for sale
Copy of Layout Approval (in case of layout)
Other
Commencement Certificates
Building Plan Approval (IOD)
Proforma of the allotment letter and agreement for sale
Other
Copy of Layout Approval (in case of layout)