MahaRERA Application

General Information

Other Than Individual

Organization

Galaxy Realty
Partnership
NA
Do you have any Past Experience ?
No

Address Details

6
G-orbit Block
Moledina Road
Camp
Ramkrishna Restaurant
MAHARASHTRA
Pune
Pune
Pune City
Pune (CB)
411001

Organization Contact Details

02026361917
www.g-orbit.net

Past Experience Details

Member Information

Member Name Designation Photo
Mohamedali Aslam Haji Authorized Signatory View Photo
Aslam Abdullah Haji Authorized Signatory View Photo
Indrajeet Vilas Malave Partner View Photo

Project

Heritage
On-Going Project
31/12/2017
30/04/2019
No
Others
No
166/8 , 9
Survey No 166 Hissa No 8 Part
24 m DP Road
18 m DP Road
Survey No 166 Hissa No 6 Part
MAHARASHTRA
Pune
Pune
Mulshi
Wakad
411047
3001.03
1
1
0
267.08

FSI Details

700
3405
4105.00

Bank Details

Ratnakar Bank Ltd
RATN0000157

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 28 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Trimix / Paved road for driveways in side margin.
Water Conservation, Rain water Harvesting : YES 0 ---
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 ---
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Electrical Meter Panel
DG Backup : YES 0 For common areas & lift
Open air Gym : YES 0 ---
Solar Water Heating System : YES 0 For 1 toilet in each apartment
Aggregate area of recreational Open Space : YES 0 Landscaping with children play area
Open Parking : YES 0 ---
Water Supply : YES 0 By PCMC and Borewell.
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Sewage Chambers & Drainage lines
Storm Water Drains : YES 0 ---
Landscaping & Tree Planting : YES 0 ----
Street Lighting : YES 0 For Driveways.
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 0 Garbage Chute with dry & wet waste segregation

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Heritage A 30/06/2018 0 1 0 12 1 11 30
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Office 95.57 1 1
2 Office 66.97 1 0
3 2 BHK 58.10 2 2
4 2 BHK 58.64 7 5
5 2 BHK 59.42 3 2
6 2 BHK 59.59 2 0
7 Shop with Mezzanine 49.52 1 1
8 Shop with Mezzanine 35.20 1 1
9 Shop with Mezzanine 76.28 1 1
10 Shop with Mezzanine 347.48 1 0
11 2 BHK 64.95 4 3
12 2 BHK 64.87 6 4
13 Convenient Shop 19.53 1 0
14 Convenient Shop 19.97 1 0
15 1 BHK 42.62 2 2
16 1 BHK 40.83 2 0
17 2 BHK 60.12 8 6
18 2 BHK 61.31 3 0
19 2 BHK 62.99 1 0
20 2 BHK 63.92 1 1
21 2 BHK 65.40 1 1
22 2 BHK 66.36 2 0
23 2 BHK 66.55 2 1
24 2 BHK 70.94 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 12
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
11 Overall Percentage of Completion of the work done For the entire Building /Wing 46.7

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Ar. Shashank Phadke NA Architect
Suman Balu Adagale NA Contractor
Rajiv Nandakumar Patki NA Contractor
Rafik Abdulsattar Nadaf NA Contractor
Suresh Mehta NA Contractor
Sunil Gambani NA Architect
Mr. G. A. Bhilare NA Structural Engineer
Saroj Chandrika Gupta NA Contractor
Neelesh Khethavat NA Contractor
Ranjan Jena NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other