MahaRERA Application

General Information

Other Than Individual

Organization

Sai Spacecon India Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

1101
Sai Capital
Senapati Bapar Road
Shivajinagar
Hotel Mariott
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411016

Organization Contact Details

02025667773

Past Experience Details

Member Information

Member Name Designation Photo
Subhash Nelge Managing Director View Photo
Shivkumar Nelge Managing Director View Photo
Chaitanya Nelge Managing Director View Photo
Subhash Nelge Authorized Signatory View Photo

Project

Sai Brooklands Phase 4
On-Going Project
30/06/2020
31/12/2020
No
Residential
No
Gat no 200
12 meter wide layout road
D wing Phase 3
Open space and A wing Phase 2
Gat no 193
MAHARASHTRA
Pune
Pune
Mawal
Takave Kh.
410506
3496.89
2
2
0
1910

FSI Details

381.56
2748.10
3129.66

Bank Details

Bank Of Maharashtra
MAHB0000049

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 28 0 70

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 50 No footpaths
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : YES 0 As Per Norms
Fire Protection And Fire Safety Requirements : YES 0 As Per Norms
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 As Per Norms
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 As Per Norms
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Septic Tank
Storm Water Drains : YES 0 As Per requirement
Landscaping & Tree Planting : YES 0 As per norms
Street Lighting : YES 0 As Per requirement
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Sai Brooklands Phase 4 E 0 1 0 8 1 10 14
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.45 4 1
2 2BHK 45.67 4 0
3 2BHK 46.71 4 0
4 2BHK 71.18 3 0
5 2BHK 42.35 3 0
6 2BHK 43.56 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 19
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 24
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 63
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 53.6
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Sai Brooklands Phase 4 F 0 1 0 8 1 10 14
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.45 4 0
2 2BHK 45.67 4 0
3 2BHK 46.71 4 0
4 2BHK 71.18 3 0
5 2BHK 42.35 3 0
6 2BHK 43.56 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 19
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 24
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 63
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 53.6

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Dilip G Kale NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other