MahaRERA Application

General Information

Other Than Individual

Organization

KUKREJA CONSTRUCTION CO
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

PLOT NO. 219
LAALASIS
11TH ROAD
CHEMBUR
CHEMBUR
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400071

Organization Contact Details

02266128888
kukrejaconstructions.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1KUKREJA RESIDDENCYResidentialNA7504.90WAMAN TUKARAM PATIL MARG OPP DUKES COMPANY DEONAR CHEMBUR MUMBAI 400071434 A 434 B11622007-10-262007-10-26
2GOLFSCAPPEResidentialNA8736.10BEHINDCELEBRATION HOTEL SION TROMBAY ROAD CHEMBUR MUMBAI 4000711633B11932010-08-272010-08-27

Member Information

Member Name Designation Photo
SUNIL TOLARAM KUKREJA Authorized Signatory View Photo
MOHAN TOLARAM KUKREJA Authorized Signatory View Photo
SUNIL TOLARAM KUKREJA Partner View Photo
MOHAN TOLARAM KUKREJA Partner View Photo

Project

HARI KUNJ III
On-Going Project
31/12/2014
31/03/2020
No
Residential
No
CTS NO.128/B/12A
CTS NO178 CHARAI TALAO
18 POINT 30 M W D P ROAD
HARI KUNJ BUILDING 2
CTS NO 177 PT
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400071
8473.40
2
1
1
1695.28

FSI Details

2916.54
5003.80
7920.34

Bank Details

FEDERAL BANK LTD
FDRL0001399

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 112 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 COMPLETED FOR WING B YET TO START FOR WING A
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 COMPLETED FOR WING B YET TO START FOR WING A
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 COMPLETED FOR WING B
Aggregate area of recreational Open Space : YES 100 COMPLETED FOR WING B YET TO START FOR WING A
Open Parking : YES 100 16 NOS WILL BE PROVIDED IN OPEN SPACE OF BLDG
Water Supply : YES 100 COMPLETED FOR WING B YET TO START FOR WING A
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 COMPLETED FOR WING B YET TO START FOR WING A
Storm Water Drains : YES 100 COMPLETED FOR WING B YET TO START FOR WING A
Landscaping & Tree Planting : YES 100 COMPLETED FOR WING B YET TO START FOR WING A
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 100 COMPLETED FOR WING B YET TO START FOR WING A

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 HARI KUNJ III HARI KUNJ III WING B 31/12/2017 0 1 0 15 1 16 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK FLAT NO 1 46.26 14 4
2 2BHK FLAT NO 2 60.89 14 2
3 1 BHK FLAT NO 4 46.52 14 10
4 2BHK FLAT NO 3 60.91 14 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 HARI KUNJ III HARI KUNJ III WING A 0 1 0 16 1 0 112
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK FLAT NO 1 68.58 15 0
2 2 BHK FLAT NO 2 68.58 15 0
3 2 BHK FLAT NO 3 64.82 15 0
4 2 BHK FLAT NO 4 64.82 15 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PRAMOD RAVJI DOSHI NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other