MahaRERA Application

General Information

Other Than Individual

Organization

MAHALAXMI BUILDTECH LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

503
Neptunes Uptown
N S Road
Opp Post Office
Mulund
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
400080

Organization Contact Details

09820046279
www.mahalaxmihousing.com

Past Experience Details

Member Information

Member Name Designation Photo
Vinay Mohan Gosar Authorized Signatory View Photo
Nimesh Gulabchand Chheda Partner View Photo
Arvind Malshi Gala Partner View Photo
Abhishek Bhaskar Vichare Partner View Photo

Project

Mahalaxmi Nivara
On-Going Project
31/12/2020
31/12/2020
No
Residential
No
Survey No 74, Hissa No 1C
Surve Chawl
Property of Pitambar Mehta Narayan Bute and munde
Property of Smt Devchand More and Wadhwal
Property of Bomble and Jagad
MAHARASHTRA
Konkan
Raigarh
Mangaon
Utekhol
402104
9000.00
6
6
0
900.00

FSI Details

0
9720.76
9720.76

Bank Details

HDFC Bank
HDFC0001576

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 .
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 .
Aggregate area of recreational Open Space : YES 0 .
Open Parking : NO 0 NA
Water Supply : YES 50 .
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 .
Storm Water Drains : YES 0 .
Landscaping & Tree Planting : YES 0 .
Street Lighting : YES 0 .
Community Buildings : YES 0 .
Treatment And Disposal Of Sewage And Sullage Water : YES 0 .
Solid Waste Management And Disposal : YES 0 .

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Mahalaxmi Nivara Building No 1 31/12/2020 0 1 0 5 0 84 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 24.34 10 6
2 1RK 24.66 1 0
3 1RK 24.92 1 0
4 1RK 24.93 1 0
5 1RK 27.68 9 4
6 1RK 33.99 9 4
7 1RK 36.23 1 0
8 1RK 40.38 1 1
9 1RK 24.45 4 2
10 1RK 24.46 4 4
11 1RK 24.49 10 6
12 1RK 25.16 16 13
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Mahalaxmi Nivara Building No 2 31/12/2020 0 1 0 5 0 84 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 36.23 1 0
2 1RK 24.93 1 0
3 1RK 24.34 10 7
4 1RK 24.45 4 1
5 1RK 24.46 4 1
6 1RK 24.49 10 4
7 1RK 24.66 1 1
8 1RK 24.92 1 1
9 1RK 25.16 16 4
10 1RK 27.68 9 2
11 1RK 33.99 9 5
12 1RK 40.38 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 30
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 Mahalaxmi Nivara Building No 3 31/12/2020 0 1 0 5 0 65 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 28.80 1 0
2 1RK 34.14 4 2
3 1RK 34.24 4 3
4 1RK 35 22 15
5 1RK 36.31 4 4
6 1RK 36.41 4 0
7 1RK 37.54 4 4
8 1RK 37.71 2 2
9 1RK 35.09 2 2
10 1RK 37.36 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 20
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 22
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 Mahalaxmi Nivara Building No 4 31/12/2020 0 1 0 5 0 65 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 36.31 4 3
2 1RK 28.80 1 0
3 1RK 35.09 2 1
4 1RK 36.41 4 0
5 1RK 37.36 2 2
6 1RK 37.54 4 4
7 1RK 37.71 2 1
8 1RK 34.14 4 1
9 1RK 34.24 4 2
10 1RK 35.00 22 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 15
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 Mahalaxmi Nivara Building No 5 31/12/2020 0 1 0 5 1 40 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 24.26 4 0
2 1RK 25.14 4 0
3 1RK 33.42 2 0
4 1RK 33.49 2 0
5 1RK 33.50 4 0
6 1RK 33.53 2 0
7 1RK 33.55 6 0
8 1RK 33.56 4 0
9 1RK 33.61 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 Mahalaxmi Nivara Building No 6 31/12/2020 0 1 0 5 1 52 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 25.33 4 0
2 1RK 33.50 2 0
3 1RK 33.55 4 0
4 1RK 33.56 6 0
5 1RK 33.61 4 0
6 1RK 34.24 6 0
7 1RK 34.42 2 0
8 1RK 35.01 2 0
9 1RK 35.02 2 0
10 1RK 36.32 2 0
11 1RK 36.41 2 0
12 1RK 40.46 2 0
13 1RK 40.63 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SAI ENTERPRISES Prop RAM BABU GANESH YADAV NA Contractor
V.S ENTERPRISE Prop VIKRAMADITYA G CHAURASIYA NA Contractor
Structilis Consultants Pvt Ltd NA Architect
SAMARTH AGARWAL NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other