MahaRERA Application

General Information

Other Than Individual

Organization

ELITE CORPORATION
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SHOP NO. 1, BUILDING NO. 67
DAYA SAGAR CHS LTD
TILAK NAGAR
CHEMBUR
OPP. MUNISIPAL GROUND
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400089

Organization Contact Details

02225272226

Past Experience Details

Member Information

Member Name Designation Photo
PAWAN ASHOK THARWANI Authorized Signatory View Photo
KAPIL KISHOR MADNANI Partner View Photo
LALIT HASSANAND SAMTANI Partner View Photo
SATISH HASSANAND SAMTANI Partner View Photo

Project

SAT SWARUP APARTMENT
On-Going Project
20/12/2020
20/12/2020
No
Residential
No
PIOT NO 45/ CTS NO 34
BLDG NO 44 ADJOINING
45 MT WIDE SANTACRUZ CHEMBUR LINK CHEMBUR
BLDG NO 46
BLDG NO 44 ADJOINING
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400089
1501.75
1
1
0
249.52

FSI Details

1100
6436.49
7536.49

Bank Details

HDFC
HDFC0001235

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) NO NO 0
Covered Parking ( In Numbers) 53 37 30

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 The same will be completed on site.
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 The CFO NOC from the said department.
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Electric sub-station not required.
Aggregate area of recreational Open Space : YES 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 NA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 NA
Storm Water Drains : YES 0 SWD remarks are obtained at the time of starting.
Landscaping & Tree Planting : YES 0 S.G NOC is obtained at the time of starting.
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 100 NOC from the said department is already obtained

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SAT SWARUP APARTMENT SAT SWARUP 0 1 0 16 1 0 53
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK SALE 54.8 1 1
2 2BHK SALE 69.67 23 19
3 2BHK SALE 65.03 13 12
4 2BHK 63.2 1 0
5 2BHK 69.91 1 0
6 2BHK 69.09 1 0
7 2BHK 69.39 1 0
8 2BHK 69.66 1 0
9 1BHK REHAB 31.5 1 1
10 2BHK SALE 64.10 12 12
11 2BHK REHAB 53.40 1 1
12 2BHK SALE 53.40 1 1
13 1BHK REHAB 34.80 1 1
14 1BHK REHAB 42.5 1 1
15 1.5BHK REHAB 44.5 4 4
16 2BHK REHAB 50.60 4 4
17 2BHK REHAB 52.5 2 2
18 2BHK SALE 52.95 1 0
19 1RK SALE 29.76 1 0
20 2BHK REHAB 64.1 1 1
21 2BHK REHAB 64.1 1 1
22 2BHK REHAB 65.03 1 1
23 1BHK REHAB 41.8 44 42
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 67
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

50
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 43.2

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
RAJENDRA S KARNIK NA Architect
MOHAN KANJUR NA Contractor
VIKAS GHOKALE NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other