MahaRERA Application

General Information

Other Than Individual

Organization

MANGAL BUILDHOME PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

A-1701 & 1702
LOTUS CORPORATE PARK
RAM MANDIR ROAD
GOREGAON EAST
NEAR JAY COACH
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400063

Organization Contact Details

02242461300
www.mangalbuildhome.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1MANGAL VILLASResidentialNA1876.277 78 79 80 84 TUNGARLI LONAVALA DISTRICT PUNEPLOT NO 77 78 79 80 84 CITY SURVEY NO 28/220 AND 28/221 OF FINAL PLOT NO 220562015-12-312015-09-15

Member Information

Member Name Designation Photo
MEGHRAJ SOHANLAL JAIN Authorized Signatory View Photo
AJIT SOHANLAL JAIN Managing Director View Photo

Project

SHREE MANGAL
On-Going Project
30/11/2017
31/12/2017
No
Residential
No
CTS NO 1118, 1118/1 TO 11
THE PROPERTY BEARING CTS NO 1117
THE PROPERTY BEARING CTS NO 1119
THE ROAD
THE PROPERTY BEARING CTS NO 1120
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400056
250.50
1
1
0
0

FSI Details

0
676.32
676.32

Bank Details

BHARAT CO-OPERATIVE BANK MUMBAI LIMITED
BCBM0000013

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 3 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 PIPE AND CHAMBER WORK COMPLETED
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 CFO NOC OBTAINED
Electrical Meter Room, Sub-Station, Receiving Station : YES 80 METER INSTALLATION WORK IN PROGRESS AS PER NOC
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 50 FOUNDATION WORK COMPLETED
Water Supply : YES 75 PUMP INSTALLATION COMPLETED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 SEWERAGE CHAMBER WORK COMPLETED
Storm Water Drains : YES 95 GRATING INSTALLATION WORK COMPLETED
Landscaping & Tree Planting : YES 100 TREE NOC OBTAINED
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 100 VERMICULTURE BIN NOC OBTAINED

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SHREE MANGAL SHREE MANGAL 0 1 0 8 1 3 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 STUDIO 15.45 3 3
2 STUDIO 15.44 3 3
3 STUDIO 11.83 3 3
4 STUDIO 14.59 3 3
5 STUDIO 9.54 3 3
6 STUDIO 13.55 3 3
7 1BHK 35.54 3 0
8 2BHK 54.95 3 0
9 1RK 16.71 1 1
10 1RK 27.78 1 1
11 1RK 31.05 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 25
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
11 Overall Percentage of Completion of the work done For the entire Building /Wing 73.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
BIJAL CONSTRUCTION NA Contractor
PARAS GADA NA Architect
DWIJEN J BHATT NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other