MahaRERA Application

General Information

Individual

Individual

Dr Chandrashekhar
Raghunath
Dound
Raghunath Shripati Dound
No

Address For Official Communication

4th floor
CRD SAMARTH
S V ROAD
KHAR WEST
OPP HP PETROL PUMP
MAHARASHTRA
Konkan
Mumbai Suburban
Mumbai
Greater Mumbai (M Corp.) (Part) (802794)
400052

Contact Details

02226045757
www.crdgroup.in

Past Experience Details

Project

CRD Gardenia Apartments 6
On-Going Project
31/12/2018
31/12/2019
30/06/2021
No
Residential
No
48/1A/1B
Gat No 48 - 2 Surya canal
Manor Velgaon road
Gat No 48 - 1A - 1
Gat No 47 Boundary of Village Jamkhind
MAHARASHTRA
Konkan
Palghar
Palghar
Velgaon
Manor Velgaon Road
Palghar
401404
1705.89
2
2
0
0

FSI Details

0
2133.49
2133.49

Bank Details

Bank of Maharashtra
MAHB0000484

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 10 Common to P1 to P7
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 As per sanction plan
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Common to P1 to P7
Aggregate area of recreational Open Space : YES 0 Common to P1 to P7
Open Parking : YES 0 Common to P1 to P7
Water Supply : YES 10 Common to P1 to P7
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP Common to P1 to P7
Storm Water Drains : YES 0 Common to P1 to P7
Landscaping & Tree Planting : YES 10 Common to P1 to P7
Street Lighting : YES 10 Common to P1 to P7
Community Buildings : YES 0 Club house & swimming pool to be handed over at P7
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Common to P1 to P7
Solid Waste Management And Disposal : YES 0 Common to P1 to P7

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 CRD Gardenia Apartments 6 Wing A 31/12/2020 0 1 0 5 0 4 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHKTerrace 56.21 2 2
2 1BHK 40.52 2 1
3 1BHK 42.29 2 0
4 1BHK 44.94 1 0
5 1BHKTerrace 35.88 4 0
6 1BHKTerrace 40.52 2 1
7 2BHK 55.80 1 0
8 2BHK 56.21 2 0
9 1BHK 35.44 3 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 CRD Gardenia Apartments 6 Wing B 31/12/2020 0 1 0 5 0 4 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 40.52 2 1
2 1BHK 44.94 1 0
3 1BHKTerrace 40.52 2 0
4 2BHK 55.80 1 0
5 2BHK 56.21 2 0
6 2BHKTerrace 56.21 2 1
7 1BHK 35.44 3 0
8 1BHKTerrace 35.88 4 1
9 1BHK 42.29 2 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Vidyadhar Joshi NA Engineer
Trupti Jadhav NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other