MahaRERA Application

General Information

Other Than Individual

Organization

Neelkamal Realtors Suburban Private Limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

Nil
DB House
Gen A K Vaidya Marg
Goregoan East
Opp Dindoshi Bus Depot
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400063

Organization Contact Details

02240778638
www.dbrealty.co.in

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1DB Ozone MBMCResidentialNA38400.6Village Mahajanwadi Near Dahisar ChecknakaCTS No 4509 to 4513 4517 4547 4548 4572 to 4575 4604 4609 to 4611 4652 4691 4692 4702 4710 to 4721 2533962015-12-312017-12-31

Member Information

Member Name Designation Photo
Rajiv Aggarwal Authorized Signatory View Photo
Asif Balwa Authorized Signatory View Photo

Project

DB Ozone Mumbai
On-Going Project
31/12/2015
31/12/2022
Yes
Residential
No
CTS No 3113D
CTS No 3117
National Highway No 8
Boundary of MBMC
CTS No 3113A
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400068
673.28
1
1
0
0

FSI Details

13394.66
0
13394.66

Bank Details

YES BANK
YESB0000001

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 240 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Minimum 6m Road width
Water Conservation, Rain water Harvesting : YES 0 Rain water harvesting tanks
Energy management : YES 0 Power Supply through Utility Provider
Fire Protection And Fire Safety Requirements : YES 0 Per CFO & NBFC Norms
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Meter room & Substation as per requirment
Club House with Swimming pool : YES 0 On completion of all phases
Aggregate area of recreational Open Space : YES 0 Landscaped
Open Parking : NO 0 NA
Water Supply : YES 0 fresh water supply from MCGM
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Disposed of through STP and balance into drains
Storm Water Drains : YES 0 Rain water harvesting tanks & recharge pits
Landscaping & Tree Planting : YES 0 Proposed on ground floor and podium top
Street Lighting : YES 0 lighting as per local authority regulations
Community Buildings : YES 0 Municipal Office
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Treatment in STP and balance in drains
Solid Waste Management And Disposal : YES 0 Waste segregation & disposal per waste mgmt rules

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 DB Ozone Mumbai Building No A 3 1 0 44 1 0 240
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 A X01 2BHK 56.79 82 0
2 A X02 2BHK 49.76 82 0
3 A X03 1BHK 37.21 72 0
4 A X04 2BHK 50.54 2 0
5 A X05 2BHK 57.49 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Pradeep Harachkar NA Architect

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
DB Ozone Mumbai Consumer Dispute Redressal Commission Maharashtra State CC/464/2014 Civil No Suit 2014 Matter Pending
NA
DB Ozone Mumbai Consumer Disputes Redressal Commission 16/1018 Civil No Suit 2016 Matter Pending
NA
DB Ozone Mumbai State Commission Consumer Complaint No 229 of 2018 Civil No Other 2018 Matter pending
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other