MahaRERA Application

General Information

Other Than Individual

Organization

SHREE HARI DEVELOPER
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SHOP NO 3-6
SHREE TOWER
SECTOR 20
KHARGHAR
PLOT NO 16
MAHARASHTRA
Konkan
Raigarh
Panvel
Kharghar
410210

Organization Contact Details

02225348302

Past Experience Details

Member Information

Member Name Designation Photo
VASANT NANJI PATEL Authorized Signatory View Photo
LALJI HIRJI ARETHIYA Partner View Photo
HITESH RAMJI RAVARIYA Partner View Photo

Project

SHREEJI RESIDENCY
On-Going Project
31/10/2017
31/01/2018
No
Residential
No
PLOT NO 143A
PLOT NO 143B
9 MTS WIDE ROAD
PLOT NO 143
9 MTS WIDE ROAD
MAHARASHTRA
Konkan
Raigarh
Panvel
Kharghar
410210
224.96
1
1
0
0

FSI Details

0
337.44
337.44

Bank Details

CORPORATION BANK
CORP0000572

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 5 3 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 PROVIDED
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 TEMPORARY MUNICIPAL CONNECTION IN PLACE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 TO BE PROVIDED
Storm Water Drains : YES 0 TO BE PROVIDED
Landscaping & Tree Planting : YES 0 TO BE PROVIDED
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SHREEJI RESIDENCY SHREEJI RESIDENCY 0 1 0 5 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 27.22 3 1
2 1BHK 24.23 3 3
3 1BHK 27.86 3 3
4 1RK 18.19 1 1
5 1RK 18.82 1 1
6 1RK 18.59 1 1
7 SHOP1 8.63 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SOYUZ TOFIQUE TALIB NA Architect
ANIL VIRJIBHAI VAGHASIA NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Architect’s Certificate on Completion of Project (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other