MahaRERA Application

General Information

Other Than Individual

Organization

SUMATINATH ENTERPRISES
Partnership
NA
Do you have any Past Experience ?
No

Address Details

13
MRUD KISHOR
DUTTAPADA SUBWAY
BORIVALI WEST
S V ROAD
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400096

Organization Contact Details

02228625677

Past Experience Details

Member Information

Member Name Designation Photo
NARESHKUMAR SUNDERLAL JAIN Authorized Signatory View Photo
SEEMA NARESHKUMAR JAIN Partner View Photo

Project

GOPI KISAN PATIL COMPLEX
On-Going Project
31/07/2020
27/07/2023
No
Residential
Yes
SN-358 NSN-85 H-2 AND SN-358 NSN-85 H-3
NALL
S NO 85 H-1
S NO 86
GROUND
MAHARASHTRA
Konkan
Palghar
Vasai
Chandrapada
401208
7080
2
1
1
809.85

FSI Details

2900
3962.07
6862.07

Bank Details

BASSEIN CATHOLIC CO OP BANK LTD
BACB0000035

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
GOPI KISAN PATIL COMPLEX GOPIKISAN PATIL COMPLEX Partnership Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 30 0
Water Conservation, Rain water Harvesting : YES 0 0
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 50 0
Aggregate area of recreational Open Space : YES 15 0
Open Parking : YES 2 0
Water Supply : YES 0 Given by munciple
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 50 0
Storm Water Drains : YES 0 0
Landscaping & Tree Planting : YES 50 0
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 0 0

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 GOPI KISAN PATIL COMPLEX GOPI KISAN PATIL COMPLEX A AND B WING 0 2 0 8 44 2 44
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B WING 54.30 7 4
2 A WING 37.32 3 2
3 A WING 37.59 3 3
4 A WING 37.67 8 3
5 A WING 52.54 7 5
6 A WING 52.87 7 2
7 A WING 52.89 7 3
8 A WING 54.27 7 5
9 B WING 52.72 7 6
10 B WING 52.88 14 13
11 B WING 52.91 14 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 25
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 73.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 GOPI KISAN PATIL COMPLEX GOPI KISAN PATIL COMPLEX PROPOSED 0 0 0 0 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 0 0 0 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
MAHEK ENTERPRISES NA Contractor
AJAY WADE AND ASSOCIATES NA Architect
MUKESH PRABHAKAR NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other