MahaRERA Application

General Information

Other Than Individual

Organization

SANKALP SIDDHI DEVELOPERS PVT LTD
Company
NA
Do you have any Past Experience ?
No

Address Details

01
RAJPIPLA
OPPOSITE STANDARD CHARTERED BANK
LINKING ROAD
SANTACRUZ WEST
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400054

Organization Contact Details

02266285000
www.ahujagroup.com

Past Experience Details

Member Information

Member Name Designation Photo
JAGDISH BHAWANDAS AHUJA Managing Director View Photo
GAUTAM JAGDISH AHUJA Managing Director View Photo
JAGDISH BHAWANDAS AHUJA Authorized Signatory View Photo

Project

LAMOR
On-Going Project
31/12/2017
30/06/2021
No
Residential
Yes
CTS 1/C3PT 396 397 397/1-12 398 etc of village oshiwara jogeshwari west
Slum rehab building and nallah
slum
90 ft relief road
rehab building and Verona building
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
OSHIWARA
OSHIWARA
400102
3380.84
1
1
0
268.75

FSI Details

7977.25
18152.81
26130.06

Bank Details

HDFC BANK LTD
HDFC0000079

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
LAMOR Sahyog Homes Limited Company Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 370 0 50

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Driveway between Lamor & Verona buildings
Water Conservation, Rain water Harvesting : YES 0 RWH Tanks
Energy management : YES 0 Solar panels provided
Fire Protection And Fire Safety Requirements : YES 0 Hydrant & sprinkler system
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Reliance energy powersupply
Aggregate area of recreational Open Space : YES 0 268.75 sqm
Open Parking : NO 0 NA
Water Supply : YES 0 BMC water supply provided
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 RCC STP
Storm Water Drains : YES 0 in RCC
Landscaping & Tree Planting : YES 0 Green wall near nalla side tree plantation
Street Lighting : YES 0 along the side of internal road
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 autocentral through STP
Solid Waste Management And Disposal : YES 0 Organic waste composter provided

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 LAMOR LAMOR 31/07/2022 1 1 0 37 1 0 370
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK TYPE 1 93.62 17 5
2 3 BHK TYPE 2 95.46 1 0
3 3 BHK TYPE 6 116.92 16 8
4 2 BHK TYPE 4 84.97 25 22
5 2 BHK TYPE 5 84.99 25 18
6 3 BHK TYPE 5 116.26 36 32
7 3 BHK TYPE 4 109.83 32 16
8 3 BHK TYPE 3 108.83 14 5
9 2 BHK TYPE 1 70.75 19 9
10 2 BHK TYPE 2 72.10 50 42
11 2 BHK TYPE 3 74.07 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 74
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 68
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 63
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SHYAM HEMRAJANI NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other