MahaRERA Application

General Information

Other Than Individual

Organization

LAKHANI REALTY LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

1801
SATRA PLAZA
PALM BEACH ROAD
SECT 19D VASHI
PALM BEACH GALLERIA
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400705

Organization Contact Details

02227833000
www.lakhanibuilders.in

Past Experience Details

Member Information

Member Name Designation Photo
SUNNY LAKHANI Partner View Photo
NARENDER LAKHANI Authorized Signatory View Photo

Project

EMPIRE TOWERS
On-Going Project
31/07/2023
31/07/2023
No
Others
No
208/4 214/6
9M WIDE ROAD
SERVICE ROAD EASTER EXPRESS HIGHWAY
VANDANA C BUILDING VACANT PLOT
POLICE CHOWKI OLD L B S ROAD
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400602
6985.43
6
3
3
809.41

FSI Details

9083.91
7927.62
17011.53

Bank Details

HDFC BANK LTD
HDFC0001575

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 344 4 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 WILL BE DONE PRIOR TO OC
Water Conservation, Rain water Harvesting : YES 0 WILL BE DONE PRIOR TO OC
Energy management : YES 0 WILL BE DONE PRIOR TO OC
Fire Protection And Fire Safety Requirements : YES 0 WILL BE DONE PRIOR TO OC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 WILL BE DONE PRIOR TO OC
Aggregate area of recreational Open Space : YES 0 WILL BE DONE PRIOR TO OC
Open Parking : NO 0 NA
Water Supply : YES 0 WILL BE DONE PRIOR TO OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 WILL BE DONE PRIOR TO OC
Storm Water Drains : YES 0 WILL BE DONE PRIOR TO OC
Landscaping & Tree Planting : YES 0 WILL BE DONE PRIOR TO OC
Street Lighting : YES 0 WILL BE DONE PRIOR TO OC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 WILL BE DONE PRIOR TO OC
Solid Waste Management And Disposal : YES 0 WILL BE DONE PRIOR TO OC

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 EMPIRE TOWERS LEGEND 31/07/2023 2 1 2 21 1 0 162
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5 BHK 71.50 01 0
2 3BHK 90.52 01 01
3 2BHK 63.15 16 04
4 2BHK 64.64 01 0
5 3BHK 90.27 13 01
6 3BHK 90.28 09 01
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 60
2 X number of Basement(s) and Plinth 50
3 X number of Podiums 40
4 Stilt Floor 40
5 X number of Slabs of Super Structure 4
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 19.4
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 EMPIRE TOWERS LEGACY 31/07/2023 2 1 2 23 1 0 162
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 55.28 01 0
2 2 BHK 55.82 06 01
3 2.5 BHK 71.27 01 0
4 2.5 BHK 73.52 01 01
5 2.5 BHK 74.11 01 01
6 3 BHK 90.27 09 01
7 3 BHK 90.28 04 01
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 60
2 X number of Basement(s) and Plinth 50
3 X number of Podiums 40
4 Stilt Floor 40
5 X number of Slabs of Super Structure 2
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 19.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 EMPIRE TOWERS COMMERCIAL 31/07/2023 2 1 0 1 0 0 20
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 41.74 1 0
2 SHOP 53.75 1 1
3 SHOP 54.55 1 1
4 SHOP 54.56 1 1
5 SHOP 56.45 1 0
6 SHOP 56.60 1 0
7 SHOP 72.60 1 0
8 SHOP 72.61 1 0
9 SHOP 28.22 1 0
10 SHOP 28.27 1 0
11 SHOP 35.19 1 1
12 SHOP 35.21 3 2
13 SHOP 41.52 1 1
14 SHOP 41.54 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 EMPIRE TOWERS COMMERCIAL 31/07/2023 2 1 0 1 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 29.02 1 0
2 SHOP 29.04 1 0
3 SHOP 33.82 1 0
4 SHOP 37.47 1 0
5 SHOP 57.79 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 EMPIRE TOWERS LEGACY PROPOSED 31/07/2023 0 0 0 18 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 55.82 07 0
2 3 BHK 90.27 08 0
3 3 BHK 90.28 07 0
4 4 BHK 198.73 01 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 EMPIRE TOWERS LEGEND PROPOSED 31/07/2023 0 0 0 25 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 63.15 04 0
2 2BHK 64.64 02 0
3 2 BHK 64.65 01 0
4 2.5 BHK 74.11 02 0
5 3 BHK 90.27 03 0
6 3 BHK 90.28 04 0
7 4 BHK 198.73 01 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
IO FOLDS ARCHITECTS & CONSULTANTS NA Architect
MAHIMTURA CONSULTANTS PVT LTD NA Structural Engineer
ENGENERRING CREATIONS PUBLIC HEALTH CONSULTANCY PVT LTD NA

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other