MahaRERA Application

General Information

Other Than Individual

Organization

Rizvi Estates & Hotels Pvt Ltd
Company
NA
Do you have any Past Experience ?
No

Address Details

1st Floor
Rizvi House
Hill Road
Bandra West
Near Bandra Police Station
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400050

Organization Contact Details

02226426767

Past Experience Details

Member Information

Member Name Designation Photo
Akhtar Hasan Rizvi Authorized Signatory View Photo
Meena Akhtar Rizvi Authorized Signatory View Photo

Project

Rizvi Utopia
On-Going Project
31/12/2020
31/12/2020
No
Others
No
6421 to 6423,6424 A to C, 6426, 6427, 6429A,7364,7370, 7374, 7375, 7376A, 7377, 7379A, 7381, 7382
Slum Area
Slum Area
Air India Colony
Kalina Tank
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400055
4614.96
3
3
0
0

FSI Details

2770.84
6907.05
9677.89

Bank Details

Vijaya Bank
VIJB0005002

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 94 9 40

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Road way for internal Vehicular would be Provided
Water Conservation, Rain water Harvesting : YES 0 Provided as per Requirements
Energy management : YES 0 As Per IGBC Requirements
Fire Protection And Fire Safety Requirements : YES 0 As per CFO requirement shall be Provided
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 To be meet as per Requirement
Club House : YES 0 Amenities will be provided as per approval Plans
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 Will be given by BMC after OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP is Proposed
Storm Water Drains : YES 0 Strom Water Drain Lane Provided as per Requirement
Landscaping & Tree Planting : YES 0 Provided as per Landscape Design
Street Lighting : YES 0 will be provided as per Remark
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 STP is Proposed
Solid Waste Management And Disposal : YES 0 Provided as per Requirements

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Rizvi Utopia Wing A 1 1 1 10 0 0 38
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 1 19.24 1 0
2 Shop 2 15.82 1 0
3 Shoop 3 19.36 1 1
4 Shop 4 15.69 1 0
5 Shop 5 9.72 1 0
6 Shop 6 12.09 1 0
7 2 BHK 62.73 9 0
8 2 BHK 66.54 9 0
9 2 BHK 72.58 9 2
10 3 BHK 93.68 9 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 40
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 64
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Rizvi Utopia Wing B 1 1 1 10 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 73.05 9 0
2 2 BHK 74.91 9 1
3 3 BHK 94.33 9 0
4 3 BHK 96.19 9 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 40
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 64
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 Rizvi Utopia Wing C 1 1 1 10 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 67.92 18 0
2 3 BHK 83.82 9 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 40
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

55
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 62.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Rupalwala Mohammed Arif Abdul Latif NA Structural Engineer
M/S Essar Group NA Architect
Irfan Tayyab Behlim NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other