MahaRERA Application

General Information

Other Than Individual

Organization

KARDA CONSTRUCTIONS LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2ND FLOOR
GULMOHAR STATUS
DR MUNJE ROAD
SAMARTH NAGAR
ABOVE BUSINESS BANK
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik
422005

Organization Contact Details

02532465436
www.kardaconstrutcion.com

Past Experience Details

Member Information

Member Name Designation Photo
Naresh Jagumal Karda Partner View Photo
NARESH JAGUMAL KARDA Authorized Signatory View Photo

Project

HARI VASANT
On-Going Project
31/12/2020
31/12/2020
No
Residential
Yes
S No 4/2A,4/1B AND 4/2B/2
S No 4 Part and S No 4-2B Part
S No 6 Part
24 Mtrs wide DP Road
S No 4-1A Part
MAHARASHTRA
Nashik
Nashik
Nashik
Aanandwali
AASARAM BABU ASHRAM
GANGAPUR ROAD
422005
8375
2
2
0
837.50

FSI Details

6065.64
11934.36
18000.00

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement Office Number Other Details
HARI VASANT MANOJ VASANTRAO ADAYPRABHU Individual Area Share NA Address : SHIVANJALI ,4446 ,MHASOBA MAHARAJ PATANGAN ,PANCHAVATI ,SARDAR CHOWK ,Division :Nashik ,District :Nashik ,Taluka :Nashik ,Village :Nashik ,422003 ,27

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 144 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Tremix road (partly) and paver blocks (Partly)
Water Supply : YES 0 To be obtained from Nashik Municipal Corporation
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Septic Tank with soak pit
Storm Water Drains : YES 0 As per approved building plan
Landscaping & Tree Planting : YES 0 As per approved building plan
Street Lighting : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : YES 0 As per approved building plan
Open Parking : YES 0 As per approved building plan
Community Buildings : YES 0 Club House and Gym
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Recharge pit with borewell
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 As per provisional NOC

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 HARI VASANT Building A 31/12/2020 0 1 0 17 1 47 111
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 61.4 8 3
2 2BHK 61.52 16 0
3 2BHK 63.3 8 0
4 2BHK 65.87 8 0
5 2BHK 66.35 8 0
6 2BHK 66.73 8 0
7 3BHK 93.33 8 2
8 3BHK 93.52 8 0
9 4BHK 125.52 8 0
10 2BHK 61.42 7 3
11 4BHK 125.26 8 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 50
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 15
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 HARI VASANT Building B 31/12/2020 0 1 0 17 2 175 33
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 60.89 1 0
2 2BHK 61.42 8 1
3 2BHK 61.52 9 0
4 2BHK 63.32 8 0
5 2BHK 63.35 1 0
6 2BHK 65.8 7 0
7 2BHK 65.86 1 0
8 2BHK 66.32 7 0
9 2BHK 66.4 8 0
10 2BHK 66.63 7 1
11 2BHK 67.17 7 0
12 3BHK 93.52 9 1
13 3BHK 100.46 7 0
14 4BHK 121.55 1 0
15 4BHK 121.72 8 4
16 4BHK 127.92 7 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Prashant Themaskar NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Commencement Certificates
Proforma of the allotment letter and agreement for sale
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Declaration in FORM B
Status of Conveyance
Certificates of Architect (Form 4)
Other
Certificates of CA (Form 5)
Status of Formation of Legal Entity (Society/Co Op etc.)