MahaRERA Application

General Information

Other Than Individual

Organization

NEPTUNE DEVELOPERS LIMITED
Company
NA
Do you have any Past Experience ?
No

Address Details

4TH FLOOR
EASTERN BUSINESS DISTRICT
LBS ROAD
BAHNDUP WEST
NEAR MANGATRAM PETROL PUMP
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400078

Organization Contact Details

02267770600

Past Experience Details

Member Information

Member Name Designation Photo
NAYAN ASHOK BHEDA Managing Director View Photo
NAYAN THAKARSHI SHAH Authorized Signatory View Photo

Project

NEPTUNE TRIVENI SANGAM
On-Going Project
31/07/2026
31/01/2027
No
Residential
No
S NOS 65/12A 12B 13
S NOS 90
30M WIDE DP ROAD
S NOS 87
S NOS 64 65
MAHARASHTRA
Konkan
Thane
Kalyan
Kalyan-Dombivali (M Corp.)
421102
20200
3
3
0
1294.50

FSI Details

11760.92
9794.08
21555.00

Bank Details

HDFC BANK LTD
HDFC0000015

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 WORK TO BE DONE
Water Conservation, Rain water Harvesting : YES 0 WORK TO BE DONE
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 WORK TO BE DONE
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 WORK TO BE DONE
Aggregate area of recreational Open Space : YES 0 WORK TO BE DONE
Open Parking : NO 0 NA
Water Supply : YES 0 WORK TO BE DONE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 WORK TO BE DONE
Storm Water Drains : YES 0 WORK TO BE DONE
Landscaping & Tree Planting : YES 0 WORK TO BE DONE
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 WORK TO BE DONE
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 NEPTUNE TRIVENI SANGAM NEEM 0 1 0 18 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK S 33.24 15 1
2 1BHKS1 33.28 16 1
3 1BHKB 36.84 16 2
4 1BHKB1 37.23 18 4
5 2BHKS 44 18 0
6 2BHKS1 44.03 16 0
7 2BHKB 51.32 16 0
8 2BHKB1 51.74 18 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 NEPTUNE TRIVENI SANGAM BRAHMI 0 1 0 18 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHKS1 44.03 16 0
2 2BHKB 51.32 16 0
3 2BHKB1 51.74 18 2
4 1 BHKS 33.24 15 0
5 1BHKS1 33.28 16 0
6 1BHKB 36.84 16 4
7 1BHKB1 37.23 18 2
8 2BHKS 44 18 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 NEPTUNE TRIVENI SANGAM TULSI 0 1 0 18 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHKB1 37.23 18 4
2 2BHKS 44 18 1
3 2BHKS1 44.03 16 0
4 2BHKB 51.32 16 1
5 2BHKB1 51.74 18 2
6 1 BHK S 33.24 15 0
7 1BHKS1 33.28 16 1
8 1BHKB 36.84 16 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
ANIL R NIRGUDE NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other