MahaRERA Application

General Information

Other Than Individual

Organization

ANANT SQUARE
Others
AOP
Do you have any Past Experience ?
No

Address Details

Centre Plot
Green Square
Ghodbunder Rd
Village Kavesar
Suraj Water Park
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400607

Organization Contact Details

02225452903
www.squarefeetgroup.in

Past Experience Details

Other Organization Type Member Information

Name Member Type
Squarefeet Land Developers LLP Partnership
Anant Estates Partnership

Project

ACE SQUARE PHASE 1
On-Going Project
31/12/2017
31/12/2017
No
Others
No
Survey 2-28, 2-19, 2-33
Survey No 2-34
20 mt DP road
Survey No 2-29
Survey No 4-2
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400615
5607
2
2
0
841.19

FSI Details

0
5903.9
5903.90

Bank Details

COSMOS CO OP BANK LTD
COSB0000040

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 88 54 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 Work completed. Final RWH NOC received.
Energy management : YES 100 Solar WaterHeating completion certificate received
Fire Protection And Fire Safety Requirements : YES 100 Work Completed. Final CFO NOC received.
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Work completed.
Aggregate area of recreational Open Space : YES 100 Work completed.
Open Parking : NO 0 NA
Water Supply : YES 90 Will be supplied by Tmc after OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 Work Completed. Final Drainage NOC received
Storm Water Drains : YES 100 Work Completed. Final SWD NOC received
Landscaping & Tree Planting : YES 100 Work Completed. Final Garden NOC received.
Street Lighting : NO 0 NA
Community Buildings : YES 100 Club House common for all phases
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP common for all phases
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 ACE SQUARE PHASE 1 BUILDING A 0 1 1 19 1 0 53
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 31.27 17 17
2 3 10.99 1 0
3 4 17.98 2 0
4 5 15.98 2 0
5 6 19.97 2 2
6 7 13.98 1 1
7 1 48.54 50 34
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 ACE SQUARE PHASE 1 BUILDING B 0 1 1 19 1 0 35
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 31.27 67 65
2 2 48.56 2 1
3 3 58.93 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SV Corporation NA Contractor
Ten Folds NA Architect
Ajay Mahale NA Structural Engineer
Enviro-con-CMS NA

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other