MahaRERA Application

General Information

Other Than Individual

Organization

JAGDALE INFRASTRUCTURE PVT. LTD.
Company
NA
Do you have any Past Experience ?
No

Address Details

GR. FLR.
TAMANNA CHS
YASHODHAN NAGAR
LOKMANYA NAGAR
YASHODHAN NAGAR BUS STOP
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400606

Organization Contact Details

02225886353
www.jagdalegroup.com

Past Experience Details

Member Information

Member Name Designation Photo
RAHUL JAGDALE Authorized Signatory View Photo
ROHIT JAGDALE Authorized Signatory View Photo

Project

AMIZRA
On-Going Project
31/12/2018
31/12/2018
30/06/2022
No
Others
No
170/1
DOSTI VIHAR
20 M WIDE DP ROAD
DOSTI VIHAR
NALLA
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
Kores road
Vartak Nagar
400606
6894
2
2
0
912.08

FSI Details

5095
7729.19
12824.19

Bank Details

SYNDICATE BANK
SYNB0005006

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 210 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 Completed
Energy management : YES 100 SOLAR WATER HEATERS BEFORE OC
Fire Protection And Fire Safety Requirements : YES 100 Completed
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 individual metres pending
Fitness Center : YES 90 civil completed
SWIMMING POOL : YES 90 Civil Completed
Aggregate area of recreational Open Space : YES 100 Civil Completed
Open Parking : YES 0 Completed
Water Supply : YES 100 WORK TO BE COMMENCED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 WATER CONNECTION WILL BE PROVIDED BY TMC AFTER OC
Storm Water Drains : YES 100 Completed
Landscaping & Tree Planting : YES 80 Completed
Street Lighting : NO 0 Podium landscape to be completed before full OC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 NA
Solid Waste Management And Disposal : YES 100 STP WATER FOR FLUSHING&GARDENING BEFORE OC

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 AMIZRA AMIZRA B 0 1 3 29 1 34 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1.5 BHK 49.94 56 32
2 2 BHK 54.76 56 35
3 3 BHK 82.93 51 20
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 AMIZRA AMIZRA A 0 1 0 6 1 24 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1.5 BHK 45.86 20 0
2 SHOP 1 92.62 1 0
3 SHOP 2 146.4 1 0
4 OFFICE 1 43.62 1 0
5 OFFICE 2 34.84 1 0
6 OFFICE 3 46.82 1 0
7 BANK 4 114.03 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 70
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 5
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 37.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
L D PATEL AND SONS NA Contractor
SAAKAAR ARCHITECTS NA Architect
EPICONS CONSULTANTS PVT LTD NA Engineer
ENGINEERING CREATIONS PUBLIC HEALTH CONSULTANCY PVT LTD NA Other Professional
HDFC DEVELOPERS LIMITED A51900000930 Real Estate Agent
Salunkhe Jayawant & Phadke Chartered Accountants NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Architect’s Certificate on Completion of Project (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other