MahaRERA Application

General Information

Other Than Individual

Organization

G.E.CONSTRUCTIONS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

B/102
Oasis Arcade
Mumbai Pune Road
Opp kaka Nagar
Mumbra
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400612

Organization Contact Details

02264646433

Past Experience Details

Member Information

Member Name Designation Photo
Rukhsana Khatoon Gayasuddin Khan Partner View Photo
Mohammed Humayun Shaikh Partner View Photo
Mohammed Farooque Mohammed Vakil Chaudhary Partner View Photo
Ehtesham Firoz Khan Authorized Signatory View Photo

Project

The Universe II
On-Going Project
31/12/2022
31/12/2022
No
Residential
Yes
S No 112 H no 2
Lat 19 9 28 N long 73 1 39 E
Lat 19 9 27N Long 73 1 35 E
Lat 19 9 30 N long 73 1 37
Lat 19 9 26 N long 73 1 38 E
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400612
5393.33
4
4
0
1045.80

FSI Details

8914.71
7159.01
16073.72

Bank Details

DCB Bank Limited
DCBL0000029

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
The Universe II Zubair Ibrahim Rawal Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 72 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 to be completed before OC
Water Conservation, Rain water Harvesting : YES 0 only rain water harvesting will be provided at OC
Energy management : YES 0 solar water heater and DG set will be given b4 OC
Fire Protection And Fire Safety Requirements : YES 0 to be completed before OC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 only electric meter room before OC
Aggregate area of recreational Open Space : YES 0 to be completed before OC
Open Parking : YES 0 to be completed before OC
Water Supply : YES 0 to be completed before OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 to be completed before OC
Storm Water Drains : YES 0 to be completed before OC
Landscaping & Tree Planting : YES 0 to be completed before OC
Street Lighting : YES 0 to be completed before OC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 to be completed before OC
Solid Waste Management And Disposal : YES 0 before oc

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 The Universe II Jupiter A WING 31/12/2022 0 1 0 15 0 15 15
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 19.52 2 1
2 SHOP 32.96 1 0
3 SHOP 18.12 1 0
4 SHOP 16.32 1 0
5 SHOP 28.76 1 0
6 2 BHK 52.39 1 1
7 2 BHK 53.04 1 1
8 2 BHK 53.53 14 1
9 2 BHK 52.15 24 7
10 2BHK 45.51 14 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 50
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 15
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 The Universe II Jupiter B WING 31/12/2022 0 1 0 15 0 15 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 33.65 1 0
2 SHOP 28.76 1 0
3 SHOP 16.32 1 0
4 SHOP 19.52 2 0
5 SHOP 18.12 1 0
6 SHOP 32.96 1 0
7 2BHK 52.39 1 0
8 2BHK 53.04 1 1
9 2BHK 53.53 14 2
10 2BHK 52.15 24 12
11 2BHK 45.51 14 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 50
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 15
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 The Universe II MARS A WING 31/12/2022 0 1 0 8 0 32 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 34.79 7 0
2 1 BHK 34.63 7 0
3 1 BHK 34.59 7 0
4 1 BHK 33.73 7 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 50
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 15
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 The Universe II MARS B WING 31/12/2022 0 1 0 8 0 32 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 34.64 7 2
2 1 BHK 34.49 14 1
3 1 BHK 34.44 14 5
4 1 BHK 33.41 7 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 50
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 15

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SUVARNA GHOSH NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other
Other