MahaRERA Application

General Information

Other Than Individual

Organization

EKTA PARKSVILLE HOMES PVT. LTD.
Company
NA
Do you have any Past Experience ?
No

Address Details

401
HALLMARK BUSINESS PLAZA
SANT DYANESHWAR MARG
KALANAGAR, BANDRA EAST
OPP. GURUNANAK HOSPITAL
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400051

Organization Contact Details

02261152424
WWW.EKTAWORLD.COM

Past Experience Details

Member Information

Member Name Designation Photo
CHANDRA PRAKASH GOYAL Authorized Signatory View Photo
VIKRAM HEMANT PHATARPEKAR Managing Director View Photo

Project

EKTA PARKSVILLE PHASE II
On-Going Project
30/11/2019
31/12/2020
Yes
Residential
No
90/183 7/4 7/5PT, 91/176 1PT, 2PT, 93/177 2 PT 90/183 4PT 7PT
12 METER WIDE ROAD
CS NO 91-176PT 94-182PT
CS NO 93-177PT
12 METER WIDE INTERNAL ROAD
MAHARASHTRA
Konkan
Palghar
Vasai
Vasai-Virar City (M Corp)
401103
2321.34
8
8
0
990.74

FSI Details

0
23198.1
23198.10

Bank Details

HDFC BANK LIMITED
HDFC0000835

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 603 164 80

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 90 WORK IN PROGRESS
Energy management : YES 100 SOLAR LIGHTS PROVIDED IN PODIUM AREA
Fire Protection And Fire Safety Requirements : YES 80 WORK IN PROGRESS
Electrical Meter Room, Sub-Station, Receiving Station : YES 75 WORK IN PROGRESS
GAZEBO : YES 100 COMPLETED
Jogging Track : YES 100 TO BE HANDED OVER TO THE APEX BODY
MULTI PURPOSE COURT : YES 100 TO BE HANDED OVER TO THE APEX BODY
OPEN GYMNASIUM : YES 100 TO BE HANDED OVER TO THE APEX BODY
OPEN LAWN : YES 100 TO BE HANDED OVER TO THE APEX BODY
OUTDOOR CHESS BOARD : YES 100 TO BE HANDED OVER TO THE APEX BODY
OUTDOOR PLAYING AREA WITH PLAY EQUIPMENTS : YES 100 TO BE HANDED OVER TO THE APEX BODY
SHRUB BED : YES 100 TO BE HANDED OVER TO THE APEX BODY
Aggregate area of recreational Open Space : YES 0 WORK IN PROGRESS
Open Parking : NO 0 NA
Water Supply : YES 88 WORK IN PROGRESS
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 95 WORK IN PROGRESS
Storm Water Drains : YES 90 WORK IN PROGRESS
Landscaping & Tree Planting : YES 100 WORK IN PROGRESS
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 95 OWC MACHINE RECEIVED
Solid Waste Management And Disposal : YES 95 OWC MACHINE in Operation

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 EKTA PARKSVILLE PHASE II LINCOLN PARK A WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 51.00 14 13
2 2BHK 47.45 12 12
3 2 BHK 46.52 28 27
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 65
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 EKTA PARKSVILLE PHASE II LINCOLN PARK B WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 54 54
2 2BHK 40.80 14 14
3 3BHK 74.28 14 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 93
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 EKTA PARKSVILLE PHASE II LINCOLN PARK C WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 56 50
2 2 BHK 50.70 14 3
3 SHOP168 18.09 1 0
4 SHOP169 19.25 1 1
5 SHOP170 14.33 1 1
6 SHOP171 10.17 1 1
7 SHOP172 19.59 1 1
8 SHOP173 16.47 1 1
9 SHOP174 13.61 1 1
10 SHOP175 18.37 1 1
11 2BHK 45.00 15 10
12 2 BHK 53.85 14 12
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 30
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 EKTA PARKSVILLE PHASE II LINCOLN PARK D WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP165 13.95 1 1
2 SHOP166 11.77 1 1
3 SHOP167 15.26 1 1
4 SHOP159 14.50 1 1
5 SHOP160 11.23 1 1
6 SHOP161 13.61 1 1
7 SHOP162 17.39 1 1
8 SHOP163 10.20 1 1
9 SHOP164 17.65 1 1
10 2BHK 50.70 56 53
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 78
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

95
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 76.3
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 EKTA PARKSVILLE PHASE II LINCOLN PARK E WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP157 12.14 1 1
2 SHOP158 15.40 1 1
3 1BHK 31.43 28 28
4 1BHK 34.60 28 28
5 SHOP153 17.36 1 1
6 SHOP154 10.06 1 1
7 SHOP155 12.27 1 1
8 SHOP156 12.33 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 52
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 95.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 EKTA PARKSVILLE PHASE II LINCOLN PARK F WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP140 16.38 1 1
2 SHOP141 12.86 1 1
3 SHOP142 17.13 1 1
4 SHOP143 14.66 1 1
5 SHOP144 11.40 1 1
6 SHOP145 14.67 1 1
7 SHOP146 15.68 1 1
8 SHOP147 11.11 1 1
9 SHOP148 10.92 1 1
10 SHOP149 15.26 1 1
11 SHOP150 16.92 1 1
12 SHOP151 12.07 1 1
13 SHOP152 16.12 1 1
14 2BHK 45.00 15 14
15 1BHK 34.60 56 55
16 3BHK 74.28 15 12
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 95
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 EKTA PARKSVILLE PHASE II LINCOLN PARK G WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP138 12.87 1 1
2 SHOP139 16.29 1 1
3 1BHK 31.43 28 28
4 1BHK 34.60 28 28
5 SHOP134 17.40 1 1
6 SHOP135 10.76 1 1
7 SHOP136 13.12 1 1
8 SHOP137 13.20 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 52
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 95.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 EKTA PARKSVILLE PHASE II LINCOLN PARK H WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 28 28
2 1BHK 34.60 28 28
3 SHOP130 16.86 1 1
4 SHOP131 10.36 1 1
5 SHOP132 12.62 1 1
6 SHOP133 12.71 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 95

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
AJAY WADE AND ASSOCIATES NA Architect
J W CONSULTANTS NA Structural Engineer
JM Financial Products Limited A51900000277 Real Estate Agent
VAIBHAV RAMESH KULKARNI A51700003316 Real Estate Agent
RAJNIKANT M SHETH A51800002278 Real Estate Agent
SHIVSHAKTI KAMLESH SINGH A51800002793 Real Estate Agent
RAKESH SHARMA A51800006030 Real Estate Agent
MINERVA PROPERTIES A51800010405 Real Estate Agent
DINESH JANGID A51800010411 Real Estate Agent
RANJEET NAIPAL YADAV A51800011251 Real Estate Agent
KEY MANSIONS PRIVATE LIMITED A51900001761 Real Estate Agent
Vipul Harinder singh A51900006416 Real Estate Agent
Manish Manohar Lanjewar A51900014561 Real Estate Agent
VINAY SINGH A51900015465 Real Estate Agent
MOSES THOMAS NADAR A99000000329 Real Estate Agent
SUNIL NAMDEO MOTWANI A99000007740 Real Estate Agent
SANDEEP SURYANATH DUBEY A99000010980 Real Estate Agent
RAHEJA ESTATE AGENCY A51800003110 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
EKTA PARKSVILLE PHASE II BOMBAY CITY CIVIL COURT 887 Civil Yes Suit 2016 Withdrawal
EKTA PARKSVILLE PHASE II BOMBAY CITY CIVIL COURT 889 Civil Yes Suit 2016 WITHDRAWAL
EKTA PARKSVILLE PHASE II BOMBAY CITY CIVIL COURT 890 Civil Yes Suit 2016 Withdrawal

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Details of encumbrances
Details of encumbrances
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other
Other
Other
Other