MahaRERA Application

General Information

Individual

Individual

MURJI
BHANJI
GAMI
BHANJI GAMI
No

Address For Official Communication

OFF 101
REAL TECH PARK
PLOT NO 39/2
SECTOR 30A-VASHI
NR. INORBIT MALL
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400703

Contact Details

02227815537
www.gamigroup.in

Past Experience Details

Project

GAMI TRIXIE
On-Going Project
31/12/2018
31/12/2018
Yes
Others
No
PLOT NO 187
PROPOSED 30 MTR ROAD
PLOT 91 AND 90
PLOT 186 AND PROPOSED 30MTR ROAD
PLOT 188
MAHARASHTRA
Konkan
Raigarh
Panvel
Ulawe
410206
4199.98
3
3
0
879

FSI Details

0
6299
6299.00

Bank Details

BANK OF BARODA
BARB0VASHIX

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 135 60 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 GROUND AND ALL FLOOR TRIMIX DONE
Water Conservation, Rain water Harvesting : YES 100 WORK COMPLETE
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 WORK COMPLETE
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 CONNECTION OBTAINED
Aggregate area of recreational Open Space : YES 100 WORK COMPLETE
Open Parking : YES 100 WORK COMPLETE
Water Supply : YES 100 CONNECTION OBTAINED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 WORK COMPLETE
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 100 WORK COMPLETE
Street Lighting : YES 100 WORK COMPLETE
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 GAMI TRIXIE COMMERCIAL 0 1 0 1 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP13 34.405 1 0
2 SHOP14 27.630 1 0
3 SHOP15 68.842 1 0
4 SHOP16 143.803 1 0
5 SHOP17 95.960 1 0
6 SHOP1 61.384 1 1
7 SHOP2 58.639 1 1
8 SHOP3 32.551 1 0
9 SHOP4 35.361 1 0
10 SHOP5 41.039 1 0
11 SHOP6 42.836 1 0
12 SHOP7 40.199 1 1
13 SHOP8 40.528 1 1
14 SHOP9 26.811 1 0
15 SHOP10 38.854 1 1
16 SHOP11 37.181 1 1
17 SHOP12 37.955 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 GAMI TRIXIE A-WING 31/12/2018 0 1 1 14 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 35.969 1 1
2 2BHK 34.071 12 9
3 2BHK 37.840 1 1
4 2BHK 35.106 22 18
5 2BHK 38.120 24 19
6 2BHK 36.841 12 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 GAMI TRIXIE B-WING 31/12/2018 0 1 2 14 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 23.996 2 2
2 1BHK 17.068 18 16
3 1BHK 26.965 20 19
4 1BHK 18.096 2 2
5 1BHK 21.426 2 2
6 1BHK 28.042 1 1
7 1.5BHK 27.787 2 2
8 1.5BHK 26.346 18 16
9 1.5BHK 32.787 10 10
10 1.5BHK 32.957 9 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
TRIARCH DESIGN STUDIO NA Architect
A G GOKHALE AND ASSOCIATES NA Structural Engineer

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
GAMI TRIXIE PANVEL COURT 166 Civil No Suit 2017 PENDING
NA
GAMI TRIXIE MUMBAI HC 1437 Civil No Suit 2017 FIRST APPEAL PENDING
NA
GAMI TRIXIE PANVEL COURT 278 Civil No Suit 2017 PENDING
NA
GAMI TRIXIE PANVEL COURT 465 Civil No Suit 2017 PENDING
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other