MahaRERA Application

General Information

Other Than Individual

Organization

M/S PILLARS INDIA CONSTRUCTIONS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

PLOT 11
SAIBHAKTI
ROAD 7
PANVEL
SECTOR 19
MAHARASHTRA
Konkan
Raigarh
Panvel
New Panvel
410206

Organization Contact Details

02232289022

Past Experience Details

Member Information

Member Name Designation Photo
KOMAL SAIPRASAD MADHAVI Authorized Signatory View Photo

Project

SAI AARADHYA
On-Going Project
24/10/2017
28/02/2018
No
Residential
No
75A/ SECTOR 5/ ULWE
PLOT 74
24 MTR WIDE ROAD
PLOT 76
PLOT 75 AND TEMPLE
MAHARASHTRA
Konkan
Raigarh
Panvel
Ulawe
410206
249.91
1
1
0
0

FSI Details

0
373.69
373.69

Bank Details

GP PARSIK BANK
PJSB0000047

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 1 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 NA
Aggregate area of recreational Open Space : NO 0 ELECTRICAL METER ROOM WILL BE PROVIDED
Open Parking : YES 100 NA
Water Supply : YES 0 PROVIDE UPTO SITE BY CIDCO
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 30 CHAMBERS
Storm Water Drains : NO 0 LINES IS PROVIDED
Landscaping & Tree Planting : YES 0 NA
Street Lighting : NO 0 3 NO OF TREES
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SAI AARADHYA 1 0 1 0 5 1 4 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 329.51 15 15
2 COMMERCIAL 44.18 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 72
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

65
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 6
11 Overall Percentage of Completion of the work done For the entire Building /Wing 54.3

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
ATUL PATEL ARCHITECTS NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other