MahaRERA Application

General Information

Other Than Individual

Organization

EKTA PARKSVILLE HOMES PVT. LTD.
Company
NA
Do you have any Past Experience ?
No

Address Details

401
HALLMARK BUSINESS PLAZA
SANT DYANESHWAR MARG
KALANAGAR, BANDRA EAST
OPP. GURUNANAK HOSPITAL
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400051

Organization Contact Details

02261152424
WWW.EKTAWORLD.COM

Past Experience Details

Member Information

Member Name Designation Photo
CHANDRA PRAKASH GOYAL Authorized Signatory View Photo
VIKRAM HEMANT PHATARPEKAR Managing Director View Photo

Project

EKTA PARKSVILLE PHASE I
On-Going Project
31/12/2019
31/12/2019
30/12/2020
Yes
Residential
No
96/178, 7A PT/7B PT, 93/177/1/2 PT, 94/182 7A PT / 7B PT, 93/177, 96/178 PT
12 METER WIDE ROAD
SUREY NO 93-178 PT 94-178 PT 96-178 PT
20 METER WIDE DP ROAD
SURVEY NO 91-176 PT 93-177 PT
MAHARASHTRA
Konkan
Palghar
Vasai
Vasai-Virar City (M Corp)
Near Yazoo Park
Virar
401303
2842.89
9
9
0
1043.21

FSI Details

0
26078.7
26078.70

Bank Details

HDFC BANK LTD
HDFC0000835

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 655 175 90

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 95 WORK IN PROGRESS
Energy management : YES 100 SOLAR LIGHTS PROVIDED ONLY ON LANDSCAPE AREA
Fire Protection And Fire Safety Requirements : YES 90 Work In Progress
Electrical Meter Room, Sub-Station, Receiving Station : YES 50 WORK IN PROGRESS
Children Play Area : YES 100 To Be Handed Over to Apex Body
Gazebo : YES 100 To Be Handed Over to Apex Body
Jogging Track : YES 100 To Be Handed Over to Apex Body
Shrub Beds : YES 100 To Be Handed Over to Apex Body
Aggregate area of recreational Open Space : YES 100 COMPLETED
Open Parking : NO 0 NA
Water Supply : YES 88 WORK IN PROGRESS
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 COMPLETED.
Storm Water Drains : YES 100 COMPLETED.
Landscaping & Tree Planting : YES 100 COMPLETED
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 WORK IN PROGRESS
Solid Waste Management And Disposal : YES 100 OWN MACHINE INSTALLED

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 EKTA PARKSVILLE PHASE I CENTRAL PARK A WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 28 28
2 1BHK 34.60 28 28
3 SHOP42A 21.94 1 1
4 SHOP42B 18.55 1 1
5 SHOP42C 23.06 1 1
6 SHOP42D 23.68 1 1
7 SHOP42E 19.99 1 1
8 SHOP42F 24.80 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 53
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 95.3
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 EKTA PARKSVILLE PHASE I CENTRAL PARK B WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP41 21.38 1 1
2 SHOP36 20.55 1 1
3 SHOP38 19.85 1 1
4 1BHK 34.60 28 28
5 SHOP37 17.05 1 1
6 SHOP39 20.37 1 1
7 SHOP40 17.18 1 1
8 1 BHK 31.43 28 27
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 52
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 95.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 EKTA PARKSVILLE PHASE I CENTRAL PARK C WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP34 15.34 1 1
2 SHOP35 20.03 1 1
3 SHOP25 13.19 1 1
4 SHOP26 17.42 1 1
5 SHOP27 16.28 1 1
6 SHOP30 16.39 1 1
7 SHOP31 14.88 1 1
8 SHOP22 13.16 1 1
9 SHOP23 12.29 1 1
10 SHOP24 14.35 1 1
11 SHOP33 19.84 1 1
12 SHOP32 16.83 1 1
13 SHOP28 13.61 1 1
14 2BHK 45.00 15 15
15 3BHK 74.28 15 15
16 SHOP29 7.49 1 1
17 1 BHK 34.60 56 56
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 72
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 97.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 EKTA PARKSVILLE PHASE I CENTRAL PARK D WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP18 15.26 1 1
2 SHOP19 15.69 1 1
3 1BHK 34.60 28 28
4 SHOP20 13.24 1 1
5 SHOP21 16.47 1 1
6 1BHK 31.43 28 27
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 70
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 97
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 EKTA PARKSVILLE PHASE I CENTRAL PARK E WING 31/12/2019 0 1 0 16 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP9 14.77 1 1
2 SHOP10 11.79 1 1
3 SHOP16 14.44 1 1
4 SHOP17 14.86 1 1
5 SHOP11 10.21 1 1
6 SHOP12 13.93 1 1
7 SHOP13 12.67 1 1
8 SHOP14 15.13 1 1
9 SHOP15 11.79 1 1
10 2 BHK 50.70 56 54
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 70
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 97
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 EKTA PARKSVILLE PHASE I CENTRAL PARK F WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 56 56
2 2BHK 50.70 28 28
3 SHOP2 11.09 1 1
4 SHOP3 19.14 1 1
5 SHOP3 19.14 1 1
6 SHOP4 11.08 1 1
7 SHOP5 8.94 1 1
8 2BHK 45.00 15 15
9 SHOP6 19.04 1 1
10 SHOP1 14.46 1 1
11 SHOP7 12.36 1 1
12 SHOP8 16.92 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 68
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.8
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 EKTA PARKSVILLE PHASE I CENTRAL PARK G WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 54 54
2 2BHK 45.00 14 14
3 3 BHK 74.28 14 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 66
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.6
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 EKTA PARKSVILLE PHASE I CENTRAL PARK H WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 50.70 12 12
2 2 BHK 47.30 14 14
3 2 BHK 47.98 28 28
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 64
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.4
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
9 EKTA PARKSVILLE PHASE I CENTRAL PARK K WING 31/12/2019 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 48.47 14 5
2 2 BHK 43.63 14 13
3 2BHK 43.45 12 6
4 2BHK 43.52 14 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 19
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 56.9

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
AJAY WADE & ASSOCIATES NA Architect
JM Financial Products Limited A51900000277 Real Estate Agent
SANDEEP SURYANATH DUBEY A99000010980 Real Estate Agent
VAIBHAV RAMESH KULKARNI A51700003316 Real Estate Agent
RAJNIKANT M SHETH A51800002278 Real Estate Agent
SHIVSHAKTI KAMLESH SINGH A51800002793 Real Estate Agent
RAKESH SHARMA A51800006030 Real Estate Agent
MINERVA PROPERTIES A51800010405 Real Estate Agent
DINESH JANGID A51800010411 Real Estate Agent
RANJEET NAIPAL YADAV A51800011251 Real Estate Agent
KEY MANSIONS PRIVATE LIMITED A51900001761 Real Estate Agent
Vipul Harinder singh A51900006416 Real Estate Agent
Manish Manohar Lanjewar A51900014561 Real Estate Agent
VINAY SINGH A51900015465 Real Estate Agent
MOSES THOMAS NADAR A99000000329 Real Estate Agent
SUNIL NAMDEO MOTWANI A99000007740 Real Estate Agent
RAHEJA ESTATE AGENCY A51800003110 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
EKTA PARKSVILLE PHASE I BOMBAY CITY CIVIL COURT 887 Civil Yes Suit 2016 withdrawal
EKTA PARKSVILLE PHASE I BOMBAY CITY CIVIL COURT 889 Civil Yes Suit 2016 withdrawal
EKTA PARKSVILLE PHASE I BOMBAY CITY CIVIL COURT 890 Civil Yes Suit 2016 withdrawal
EKTA PARKSVILLE PHASE I STATE COMMISSION MAHARASHTRA 398 Others No Suit 2014 PENDING
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Details of encumbrances
Details of encumbrances
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other
Other
Other
Other
Other
Other