MahaRERA Application

General Information

Other Than Individual

Organization

S.S.Builders and Developers
Partnership
NA
Do you have any Past Experience ?
No

Address Details

R.S.No.1/1
Sapphire Park
Plot No.1A
Jadhavwadi
Near Mukta Sainik Vasahat
MAHARASHTRA
Pune
Kolhapur
Karvir
Kolhapur (M Corp.)
416005

Organization Contact Details

09011068996
www.sankpalbuilders.com

Past Experience Details

Member Information

Member Name Designation Photo
Shivaji Vishnu Sankpal Authorized Signatory View Photo
Jyoti Shivaji Sankpal Partner View Photo

Project

Sapphire Park
On-Going Project
25/05/2019
25/09/2019
No
Residential
No
R.S.No.1/1 Plot No.1
Jadhavwadi gaothan
Karveer shiv and mukta sainik vasahat
12 meters wide road
RSNo 1-2
MAHARASHTRA
Pune
Kolhapur
Karvir
Kolhapur (M Corp.)
416005
5721.57
4
4
0
736.0

FSI Details

0
11304.73
11304.73

Bank Details

RBL Bank Limited
RATN0000010

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 116 81 80

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 As per working drawing of Architect
Water Conservation, Rain water Harvesting : YES 0 As per KMC norms
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 As per KMC norms
Electrical Meter Room, Sub-Station, Receiving Station : YES 20 As per Architect drawing
Aggregate area of recreational Open Space : YES 0 Yet to be done
Open Parking : NO 0 NA
Water Supply : YES 0 Yet provided by KMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 20 As per KMC norms
Storm Water Drains : YES 20 As per Drawing
Landscaping & Tree Planting : YES 0 Yet to be done
Street Lighting : YES 0 Yet to be done
Community Buildings : YES 8 As per drawing
Treatment And Disposal Of Sewage And Sullage Water : YES 20 As per KMC norms
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Sapphire Park Wing A 1 1 0 11 1 0 21
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 86.37 6 6
2 3BHK 86.38 5 5
3 2BHK 54.90 6 5
4 2BHK 63.27 9 6
5 2BHK 55.94 5 5
6 2BHK 50.49 1 1
7 2BHK 49.91 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 80
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 90
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Sapphire Park B Wing 1 1 0 11 1 0 34
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.86 5 5
2 2BHK 65.81 6 6
3 2BHK 59.34 6 6
4 2BHK 55.15 6 3
5 2BHK 62.87 5 5
6 2BHK 65.97 5 5
7 2BHK 62.59 5 5
8 2BHK 58.41 4 4
9 2BHK 50.71 1 1
10 2BHK 51.52 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 80
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 90
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 Sapphire Park C Wing 1 1 0 11 1 0 32
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 63.57 1 0
2 2BHK 67.75 1 1
3 2BHK 67.65 1 0
4 2BHK 63.46 1 0
5 2BHK 63.18 2 0
6 2BHK 67.37 2 0
7 2BHK 52.42 1 0
8 2BHK 56.96 5 0
9 2BHK 61.14 5 2
10 2BHK 61.21 5 2
11 2BHK 60.03 4 0
12 2BHK 60.42 4 1
13 2BHK 64.60 4 3
14 2BHK 64.49 4 1
15 2BHK 57.24 4 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 80
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 90
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 Sapphire Park D Wing 1 1 0 11 1 0 29
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 63.46 1 0
2 3BHK 103.51 4 2
3 3BHK 99.11 4 1
4 3BHK 107.01 3 3
5 2BHK 57.00 4 0
6 2BHK 61.21 4 1
7 2BHK 60.34 4 3
8 2BHK 64.49 4 4
9 2BHK 55.84 1 0
10 2BHK 67.36 3 1
11 2BHK 63.18 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 80
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 90
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Pralhad Balkrishn Joshi NA Contractor
Pandurang Jaysing Mohite NA Contractor
Pravin Appasaheb Patil NA Architect
Pranav Ashok Kulkarni NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Commencement Certificates
Copy of the legal title report
Building Plan Approval (IOD)
Declaration in FORM B
Details of encumbrances
Proforma of the allotment letter and agreement for sale
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Status of Conveyance
Certificates of Architect (Form 4)
Other
Status of Formation of Legal Entity (Society/Co Op etc.)