MahaRERA Application

General Information

Other Than Individual

Organization

PARK VIEW DEVELOPERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

OFFICE NO 1
RAPID HOUSE
NARAYAN DHURU STREET
PYDHOWNIE
NEAR JJ FLYOVER
MAHARASHTRA
Konkan
Mumbai City
Ward ABCD
ABCD-400003
400003

Organization Contact Details

02223412542
WWW.RAPIDCONSTRUCTION.IN

Past Experience Details

Member Information

Member Name Designation Photo
MOHAMMED ALI ABBAJUMA Authorized Signatory View Photo
KHORRUM MOHAMMED MOHAMMED ANWAR ABBAJUMA Partner View Photo
MOHAMMED ANWAR ABDUL LATIF ABBAJUMMA Partner View Photo
MOHAMMED ASLAM MOHAMMED ANWAR ABBAJUMMA Partner View Photo
AHMED MOHAMED SHAMIM ABBAJUMA Partner View Photo

Project

RAPID RESIDENCY
On-Going Project
31/07/2019
31/12/2020
No
Residential
No
CS NOS 62/7 63/0 64/1B 64/2
GRAM PANCHAYAT ROAD
KHORADERLS PROPERTY
S NO 64 OTHER PARTS
KHORADELS PROPERTY
MAHARASHTRA
Konkan
Raigarh
Karjat
Neral
410103
17499.66
11
11
0
1483.06

FSI Details

0
17748.88
17748.88

Bank Details

BOMBAY MERCANTILE BANK
UTIB0SBMCB1

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 100
Covered Parking ( In Numbers) 0 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 35 ONLY ROADS NO FOOTPATHS
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 WORK IN PROGRESS
Electrical Meter Room, Sub-Station, Receiving Station : YES 50 SUSBSTATION AND ELECTRICAL METER ROOM
Aggregate area of recreational Open Space : YES 25 TOTAL OF 1483.06 SQ. MTRS
Open Parking : NO 0 NA
Water Supply : YES 20 AS PER APPROVAL
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 50 WORK IN PROGRESS
Storm Water Drains : YES 50 WORK IN PROGRESS
Landscaping & Tree Planting : YES 0 WORK IN PROGRESS
Street Lighting : YES 20 WORK IN PROGRESS
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 RAPID RESIDENCY RAPID RESIDENCY PHASE 3 BLG NO 1 2 AND 3 0 1 0 8 5 0 5
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 28.23 28 6
2 RESIDENTIAL 30.49 84 10
3 COMMERCIAL 6.28 1 0
4 COMMERCIAL 6.46 2 0
5 COMMERCIAL 7.27 1 0
6 COMMERCIAL 11.1 3 0
7 COMMERCIAL 11.75 2 0
8 COMMERCIAL 11.97 2 0
9 COMMERCIAL 13.25 1 0
10 COMMERCIAL 14 1 0
11 COMMERCIAL 22.81 2 0
12 COMMERCIAL 24.63 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 90
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 40
5 X number of Slabs of Super Structure 20
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 35
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 RAPID RESIDENCY RAPID RESIDENCY PHASE 2 BLDG NO 1 2 3 4 5 6 8 10 0 1 0 4 6 0 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 8.89 2 1
2 SHOP 9.42 2 0
3 SHOP 11.07 1 0
4 SHOP 11.27 5 0
5 SHOP 11.86 1 0
6 SHOP 34.7 1 0
7 RESIDENTIAL 18.25 4 4
8 RESIDENTIAL 18.55 24 19
9 RESIDENTIAL 18.81 2 2
10 RESIDENTIAL 19.12 20 18
11 RESIDENTIAL 19.5 12 11
12 RESIDENTIAL 19.59 26 24
13 RESIDENTIAL 20.35 6 3
14 RESIDENTIAL 20.49 12 10
15 RESIDENTIAL 21.02 4 2
16 RESIDENTIAL 21.25 18 15
17 RESIDENTIAL 21.45 4 4
18 RESIDENTIAL 34.96 4 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 95
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 65
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 68.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 RAPID RESIDENCY RAPID RESIDENCY PHASE 2 BLDG NO 7 9 12 15 16 0 1 0 4 9 0 9
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 25.47 24 16
2 RESIDENTIAL 26.79 4 4
3 RESIDENTIAL 27.32 8 8
4 RESIDENTIAL 27.93 12 9
5 RESIDENTIAL 28.27 24 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 95
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 65
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 68.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 RAPID RESIDENCY RAPID RESIDENCY PHASE 2 BLDG NO 11 13 14 0 1 0 4 6 0 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 18.81 6 6
2 RESIDENTIAL 19.77 18 17
3 RESIDENTIAL 19.95 18 14
4 RESIDENTIAL 21.25 9 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 95
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 65
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 68.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 RAPID RESIDENCY RAPID RESIDENCY PHASE 1 BLDG NO 5 6 7 0 1 0 4 5 0 5
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 22.36 4 4
2 RESIDENTIAL 22.55 11 10
3 RESIDENTIAL 22.8 12 8
4 RESIDENTIAL 22.85 3 3
5 RESIDENTIAL 22.96 21 19
6 RESIDENTIAL 23.2 3 1
7 REISDENTIAL 24.21 4 3
8 RESIDENTIAL 34.61 1 1
9 RESIDENTIAL 35.48 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

96
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 RAPID RESIDENCY RAPID RESIDENCY PHASE 1 BLDG NO 8 0 1 0 4 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 22.58 2 1
2 RESIDENTIAL 22.99 6 5
3 RESIDENTIAL 34.22 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

96
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 RAPID RESIDENCY RAPID RESIDENCY PHASE 1 BLDG NO 9 0 1 0 4 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 22.54 2 0
2 RESIDENTIAL 22.95 12 9
3 RESIDENTIAL 22.99 3 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

96
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 RAPID RESIDENCY RAPID RESIDENCY PHASE 1 BLDG NO 10 0 1 0 4 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 22.54 2 2
2 RESIDENTIAL 22.95 12 3
3 RESIDENTIAL 22.99 3 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

96
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
9 RAPID RESIDENCY RAPID RESIDENCY PHASE 1 BLDG NO 11 0 1 0 4 2 0 2
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 22.54 2 2
2 RESIDENTIAL 22.95 12 12
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

96
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
10 RAPID RESIDENCY RAPID RESIDENCY PHASE 1 BLDG NO 12 0 1 0 3 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESDENTIAL 43.93 3 3
2 RESIDENTIAL 48.54 3 3
3 RESIDENTIAL 52.29 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

96
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
11 RAPID RESIDENCY RAPID RESIDENCY PHASE 1 BLDG NO 13 0 1 0 3 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 47.56 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

96
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.2

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
ERY SPPACES NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other