MahaRERA Application

General Information

Other Than Individual

Organization

PRISTINE PROPERTIES
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

PLOT NO 117A
OFFICE NO. 501 / 502, FORTUNE HOUSE
PRABHAT ROAD
ERANDWANE
NEAR INCOME TAX LANE
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411004

Organization Contact Details

02041003100

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1PRISTINE PROLIFE PART I and II OthersRESIDENTIAL + COMMERCIAL48018.3S NO 146 PART 1B S NO 170 PART 3 TO 10 AND 12 OFF MUMBAI BANGALORE HIGHWAY NEAR SAYAJI HOTEL PUNE 411057S NO 146 PART 1B S NO 170 PART 3 TO 10 AND 12167522015-12-312016-04-29
2PRISTINE SQUARECommercialNA1981.74SNO 146 PART 1B S NO 170 PART 3 TO 10 AND 12 OFF MUMBAI BANGALORE HIGHWAY NEAR SAYAJI HOTEL WAKAD PUNE 411057SNO 146 PART 1B S NO 17 PART 3 TO 10 AND 121612017-03-302017-06-15

Member Information

Member Name Designation Photo
PRITAM ISHWARCHAND GOYAL Authorized Signatory View Photo
ISHWARCHAND KISHORILAL GOYAL Partner View Photo
SACHIN ISHWARCHAND GOYAL Partner View Photo

Project

Pristine Greens Phase 1
On-Going Project
31/12/2019
31/12/2019
No
Others
Yes
216/1 P 216/2 P 228/1 P 228/2 P
18MT WIDE ROAD
SWARAJ
PHASE II
24 MT ROAD
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
DEHU MOSHI ROAD
BORHADEWADI
412105
17214.09
4
4
0
2755.24

FSI Details

19990.75
0
19990.75

Bank Details

ICICI Bank Ltd
ICIC0000039

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 ANANDA BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 HIRAMAN BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 MAHADU BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 PANDURANG BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 SITARAM BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 SURESH SADASHIV BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 TUKARAM SADASHIV BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 NAMDEV SAHADU BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 SOPAN SAHADU BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 ATISH BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Pristine Greens Phase 1 AKSHAY BARNE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) NA 0 0
Covered Parking ( In Numbers) NA 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 INTERNAL ROADS ONLY
Water Conservation, Rain water Harvesting : YES 100 AS PER CONSULTANT
Energy management : YES 100 SOLAR WATER HEATING
Fire Protection And Fire Safety Requirements : YES 100 AS PER FIRE NORMS
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 AS PER CONSULTANT
Aggregate area of recreational Open Space : YES 100 AS PER LAYOUT
Open Parking : YES 0 -
Water Supply : YES 100 AS PER AGREEMENT
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 AS PER LAYOUT
Storm Water Drains : YES 100 AS PER CONSULTANT
Landscaping & Tree Planting : YES 100 AS PER CONSULTANT
Street Lighting : YES 100 AS PER CONSULTANT
Community Buildings : YES 100 CLUBHOUSE COMPLETED
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP
Solid Waste Management And Disposal : YES 100 OWC

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Pristine Greens Phase 1 A WING 31/12/2019 0 1 0 15 0 29 25
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 HK 24.43 2 2
2 2BHK 38.99 14 14
3 2BHK 41.22 14 14
4 2BHK 42.65 40 40
5 2BHK 44.89 38 38
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Pristine Greens Phase 1 B WING 31/12/2019 0 1 0 15 0 18 15
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 27.51 2 2
2 1BHK 32.61 5 5
3 1BHK 35.81 56 56
4 1BHK 35.86 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Pristine Greens Phase 1 C WING 31/12/2019 0 1 0 15 0 26 27
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 30.36 7 7
2 1BHK 30.99 28 28
3 1BHK 33.41 14 14
4 1BHK 30.37 5 5
5 1BHK 31.14 21 21
6 1BHK 31.15 19 19
7 1BHK 32.54 12 12
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Pristine Greens Phase 1 D WING 31/12/2019 0 1 0 15 0 39 16
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.06 6 6
2 1BHK 31.07 6 6
3 1BHK 31.97 2 2
4 2BHK 41.12 7 7
5 2BHK 43.31 2 2
6 2BHK 43.33 5 5
7 2BHK 45.79 2 2
8 2BHK 45.81 14 14
9 2BHK 45.89 12 12
10 Shop 29.15 1 1
11 Shop 42.3 1 1
12 Shop 37.54 1 1
13 Shop 30.86 1 1
14 Shop 24.39 1 1
15 Shop 20.03 1 1
16 2BHK 45.97 1 1
17 2BHK 46.46 2 2
18 2BHK 46.5 15 15
19 Shop 38.59 1 1
20 Shop 30.61 1 1
21 Shop 29.15 1 1
22 2BHK 46.63 14 14
23 2BHK 45.96 6 6
24 2BHK 48.98 7 7
25 Shop 32.7 1 1
26 2BHK 49.42 7 7
27 Shop 35.36 1 1
28 Shop 22.35 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SACHIN SUTAR NA Architect
ASPIRE INFRA NA Contractor
DILIP BHAME NA Contractor
DHARIYA NA Contractor
SHANKAR RATHOD NA Contractor
BHAGWAN BHADALE NA Contractor
SHIMBHUDAYAL KUMAVAT NA Contractor
MANOHAR KUMAVAT NA Contractor
RAMESH KUMAVAT NA Contractor
NARAYAN RASKAR NA Contractor
NANDAKISHOR KHADKE NA Contractor
ATYALKAR NA Contractor
KIRAN ENTERPRISES NA Contractor
ROHIL KUMAR NARAYANRAO MULEY A52100000518 Real Estate Agent
ASLAM NA Contractor
SUGGESTED PROPERTY PRIVATE LIMITED A52100000184 Real Estate Agent
ELARA MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
Pearlquest Associates Pvt Ltd A52100001979 Real Estate Agent
SACHIN POWAR A52100002750 Real Estate Agent
GLOBAL REALTORS A52100000018 Real Estate Agent
RK's Marketing A52100000582 Real Estate Agent
Prasad Hanmant Kulkarni A52100000272 Real Estate Agent
ABHIJIT SAHEBRAO SABBARWAR A52100000382 Real Estate Agent
Harleen Realtors A52100000302 Real Estate Agent
PEARL REALTORS A52100000187 Real Estate Agent
Fourth Dimension Business Solutions Private Limited A52100001293 Real Estate Agent
SPACEINDIA NEST LLP A52100002248 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
URBAN CONNECT REALTY A52100003395 Real Estate Agent
SUNIL CHOUDHARY NA Other Professional
RAHUL DHADPHALE NA Other Professional
SHAILENDRA ZOPATE NA Other Professional
DHANASHREE KULKARNI NA Other Professional
Prasad Bhaskar Yede A52100004531 Real Estate Agent
KISHOR DHONDIBA CHOUGULE A52100006700 Real Estate Agent
ANIL DILIP FAKATAKAR A52100008987 Real Estate Agent
WISTERIA REAL VISION PVT LTD A52100003089 Real Estate Agent
Anoop Dashrathrao Sapate A52100005051 Real Estate Agent
EstateMint Pvt Ltd A52100004278 Real Estate Agent
RANJEET SINGH YADAV A52100000402 Real Estate Agent
RANJEET SINGH YADAV A52100000402 Real Estate Agent
MYREALTOR A52100005735 Real Estate Agent
URBAN CONNECT REALTY A52100003395 Real Estate Agent
SARIKA JINESH JAIN A52100011520 Real Estate Agent
VINITA VIPUL OSWAL A52100011595 Real Estate Agent
AKKATAI LAXMAN PATIL A52100010605 Real Estate Agent
SANTOSH BAPU RAUT A52100010607 Real Estate Agent
TARIKA GIRISH PAREKH A52100014240 Real Estate Agent
GIRISH POPATLAL PAREKH A52100014273 Real Estate Agent
GIRISH POPATLAL PAREKH HUF A52100014279 Real Estate Agent
POPATLAL MANIKCHAND PAREKH A52100014337 Real Estate Agent
ARUN RAJMANI VISHWAKARMA A52100011374 Real Estate Agent
PRASAD KRISHNA GHORPADE A52100003639 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
RUPINDER SINGH A52100002004 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Form 2A
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Certificates of Architect (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000043795 1)Sandip D. Gorad , 2)Yogesh Chaudhary, 3) Vijay Jadhav, 4) Umesh Jadhav, 5) Jagganath Lingade other View Orders
2 CC005000000064563 Covered parking size issue View Orders