Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
1 |
Godrej Prana
|
TOWER A
|
30/03/2020
|
0
|
1
|
2
|
12
|
0 |
0 |
134 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1BHK |
39.28 |
11 |
11 |
2 |
1BHK |
39.29 |
11 |
11 |
3 |
1BHK |
39.3 |
11 |
11 |
4 |
1BHK |
41.95 |
1 |
1 |
5 |
2BHK |
59.43 |
1 |
1 |
6 |
1 BHK |
38.49 |
11 |
11 |
7 |
1BHK |
38.75 |
11 |
11 |
8 |
1BHK |
42.02 |
1 |
1 |
9 |
2BHK |
55.8 |
11 |
11 |
10 |
2BHK |
58.96 |
1 |
1 |
11 |
2BHK |
59.07 |
1 |
1 |
12 |
1BHK |
39.27 |
44 |
44 |
13 |
2BHK |
55.92 |
11 |
11 |
14 |
1BHK |
44.62 |
1 |
1 |
15 |
1BHK |
42.22 |
1 |
1 |
16 |
2BHK |
56.46 |
11 |
11 |
17 |
2BHK |
56.75 |
10 |
10 |
18 |
2BHK |
56.47 |
10 |
10 |
19 |
2BHK |
59.08 |
1 |
1 |
20 |
1BHK |
41.17 |
11 |
11 |
21 |
1BHK |
41.99 |
2 |
2 |
22 |
1BHK |
42 |
3 |
3 |
23 |
1BHK |
42.01 |
1 |
1 |
24 |
2BHK |
59.59 |
11 |
11 |
25 |
2BHK |
61.20 |
1 |
1 |
26 |
2BHK |
59.17 |
1 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
2 |
Godrej Prana
|
TOWER B
|
30/03/2020
|
0
|
1
|
2
|
14
|
0 |
0 |
96 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
3 BHK |
76.08 |
7 |
7 |
2 |
3 BHK |
95.61 |
5 |
5 |
3 |
3 BHK |
95.72 |
8 |
7 |
4 |
2 BHK |
68.9 |
1 |
1 |
5 |
2.5 BHK |
89.49 |
1 |
1 |
6 |
3 BHK |
108.12 |
1 |
1 |
7 |
2 BHK |
65.99 |
5 |
5 |
8 |
2 BHK |
65.65 |
7 |
7 |
9 |
3 BHK |
86.26 |
2 |
2 |
10 |
3 BHK |
72.86 |
7 |
7 |
11 |
3 BHK |
72.76 |
7 |
7 |
12 |
3 BHK |
73.05 |
12 |
12 |
13 |
2.5 BHK |
89.17 |
1 |
1 |
14 |
3BHK |
95.50 |
1 |
1 |
15 |
2 BHK |
68.72 |
1 |
1 |
16 |
2 BHK |
68.73 |
1 |
1 |
17 |
3 BHK |
75.76 |
5 |
5 |
18 |
2 BHK |
65.81 |
16 |
16 |
19 |
2BHK |
65.33 |
1 |
1 |
20 |
2 BHK |
66.30 |
6 |
6 |
21 |
2 BHK |
67.53 |
1 |
1 |
22 |
2.5 BHK |
75.69 |
1 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
3 |
Godrej Prana
|
TOWER C
|
30/03/2020
|
0
|
1
|
2
|
14
|
0 |
0 |
97 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK |
68.72 |
1 |
1 |
2 |
2 BHK |
65.99 |
5 |
5 |
3 |
3 BHK |
86.26 |
2 |
2 |
4 |
3 BHK |
108.12 |
1 |
1 |
5 |
3 BHK |
73.05 |
12 |
12 |
6 |
3 BHK |
95.72 |
7 |
7 |
7 |
3 BHK |
95.61 |
5 |
5 |
8 |
2 BHK |
65.81 |
16 |
16 |
9 |
2BHK |
65.33 |
1 |
1 |
10 |
2.5 BHK |
67.53 |
1 |
1 |
11 |
2.5 BHK |
75.69 |
1 |
1 |
12 |
2.5 BHK |
89.17 |
1 |
1 |
13 |
3BHK |
95.50 |
1 |
1 |
14 |
3 BHK |
72.86 |
7 |
7 |
15 |
2 BHK |
66.65 |
7 |
7 |
16 |
3 BHK |
76.08 |
7 |
7 |
17 |
2 BHK |
68.73 |
1 |
1 |
18 |
2 BHK |
68.9 |
1 |
1 |
19 |
2.5 BHK |
89.49 |
1 |
1 |
20 |
2 BHK |
66.30 |
6 |
6 |
21 |
3 BHK |
72.76 |
7 |
6 |
22 |
3 BHK |
75.46 |
5 |
5 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
4 |
Godrej Prana
|
TOWER D
|
30/03/2020
|
0
|
1
|
2
|
14
|
0 |
0 |
43 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK |
67.55 |
5 |
5 |
2 |
2.5 BHK |
91.56 |
1 |
1 |
3 |
3 BHK |
100.27 |
1 |
1 |
4 |
3 BHK |
102.88 |
1 |
1 |
5 |
2 BHK |
70.53 |
1 |
1 |
6 |
2 BHK |
72.33 |
1 |
1 |
7 |
2 BHK |
65.55 |
6 |
6 |
8 |
2 BHK |
67.88 |
6 |
6 |
9 |
2 BHK |
65.87 |
7 |
7 |
10 |
2.5 BHK |
90.92 |
1 |
1 |
11 |
3 BHK |
87.00 |
6 |
6 |
12 |
3 BHK |
87.34 |
7 |
7 |
13 |
3 BHK |
89.61 |
6 |
6 |
14 |
3 BHK |
89.96 |
7 |
7 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
5 |
Godrej Prana
|
TOWER E
|
30/03/2020
|
0
|
1
|
2
|
14
|
0 |
0 |
43 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK |
65.87 |
7 |
7 |
2 |
2 BHK |
67.88 |
6 |
6 |
3 |
3 BHK |
87.00 |
6 |
6 |
4 |
3 BHK |
87.34 |
7 |
7 |
5 |
3 BHK |
89.61 |
6 |
6 |
6 |
3 BHK |
89.96 |
7 |
7 |
7 |
2 BHK |
67.55 |
5 |
5 |
8 |
2 BHK |
70.53 |
1 |
1 |
9 |
2 BHK |
72.33 |
1 |
1 |
10 |
3 BHK |
100.3 |
1 |
1 |
11 |
3 BHK |
102.88 |
1 |
1 |
12 |
2 BHK |
65.55 |
6 |
6 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
6 |
Godrej Prana
|
TOWER F
|
30/03/2020
|
0
|
1
|
2
|
14
|
0 |
0 |
43 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK |
68.31 |
7 |
7 |
2 |
2 BHK |
69.45 |
7 |
7 |
3 |
3 BHK |
87.30 |
7 |
7 |
4 |
3 BHK |
87.68 |
1 |
1 |
5 |
3 BHK |
89.54 |
6 |
6 |
6 |
2 BHK |
70.9 |
1 |
1 |
7 |
2 BHK |
72.04 |
1 |
1 |
8 |
3 BHK |
100.78 |
1 |
1 |
9 |
3 BHK |
103.09 |
1 |
1 |
10 |
3 BHK |
88.03 |
1 |
1 |
11 |
2 BHK |
69.13 |
6 |
6 |
12 |
2 BHK |
67.99 |
6 |
6 |
13 |
3 BHK |
89.55 |
5 |
5 |
14 |
3 BHK |
89.59 |
6 |
5 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
7 |
Godrej Prana
|
TOWER G
|
30/03/2020
|
0
|
1
|
2
|
12
|
0 |
0 |
88 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK |
56.52 |
22 |
22 |
2 |
2 BHK |
56.54 |
11 |
11 |
3 |
2 BHK |
58.77 |
1 |
1 |
4 |
2 BHK |
58.95 |
1 |
1 |
5 |
2 BHK |
58.99 |
1 |
1 |
6 |
2 BHK |
59.01 |
1 |
1 |
7 |
2 BHK |
58.89 |
2 |
2 |
8 |
1BHK |
42 |
12 |
12 |
9 |
2 BHK |
54.46 |
10 |
10 |
10 |
2 BHK |
54.38 |
11 |
11 |
11 |
1 BHK |
39.36 |
11 |
11 |
12 |
2 BHK |
56.21 |
5 |
5 |
13 |
2 BHK |
58.43 |
22 |
22 |
14 |
2 BHK |
60.96 |
2 |
2 |
15 |
2 BHK |
56.23 |
5 |
5 |
16 |
2BHK |
56.20 |
1 |
1 |
17 |
1 BHK |
42.08 |
1 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|