MahaRERA Application

General Information

Other Than Individual

Organization

NYATI REALTORS LLP
Others
LIMITED LIABILITY PARTNERSHIP
Do you have any Past Experience ?
No

Address Details

CTS 1995(B+C) + 1996B
NYATI UNITREE, EAST WING, 6TH FLOOR
PUNE NAGAR ROAD
YERWADA
NEAR NYATI TIARA
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411060

Organization Contact Details

02066863333

Past Experience Details

Other Organization Type Member Information

Name Member Type
NITIN DWARKADAS NYATI Others
PIYUSH NITIN NYATI Others

Project

NYATI ESTEBAN I
On-Going Project
31/12/2020
30/06/2021
30/03/2022
Yes
Residential
Yes
S No 4 and 21
PLOT BOUNDARY
PLOT BOUNDARY
OPEN SPACE
PLOT BOUNDARY
MAHARASHTRA
Pune
Pune
Haveli
UNDRI
Mohammadwadi
Mohammaswadi
411060
15677
7
7
0
1768.39

FSI Details

28517.9
5289.8
33807.70

Bank Details

ICICI BANK LTD
ICIC0002390

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NYATI ESTEBAN I NYATI REALTORS LLP Partnership Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NYATI ESTEBAN I NITIN D NYATI Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NYATI ESTEBAN I NYATI BUILDERS PVT LTD Company Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 306 45 50

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 75 ONLY INTERNAL ROAD
Internal Roads & Footpaths : YES 20 ONLY INTERNAL ROAD
Internal Roads & Footpaths : NO 0 NA
Internal Roads & Footpaths : YES 20 ONLY INTERNAL ROAD
Internal Roads & Footpaths : YES 60 ONLY INTERNAL ROAD
Water Conservation, Rain water Harvesting : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 RAIN WATER HARVESTING
Water Conservation, Rain water Harvesting : YES 70 RAIN WATER HARVESTING
Energy management : NO 30 NA
Energy management : YES 0 SOLAR FOR HOT WATER
Energy management : YES 65 SOLAR FOR HOT WATER
Fire Protection And Fire Safety Requirements : YES 0 AS PER STATUTORY REQUIREMENTS
Fire Protection And Fire Safety Requirements : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 AS PER STATUTORY REQUIREMENTS
Fire Protection And Fire Safety Requirements : YES 75 AS PER STATUTORY REQUIREMENTS
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AS PER PLANS
Electrical Meter Room, Sub-Station, Receiving Station : YES 65 AS PER PLANS
Aggregate area of recreational Open Space : NO 0 NA
Aggregate area of recreational Open Space : YES 0 -
Aggregate area of recreational Open Space : YES 80 -
Open Parking : NO 0 NA
Water Supply : NO 0 NA
Water Supply : YES 0 WATER NETWORKING IN FORM OF UGWT AND OHWT
Water Supply : YES 65 WATER NETWORKING IN FORM OF UGWT AND OHWT
Sewerage (Chamber, Lines, Septic Tank , STP) : NO 0 NA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 CHAMBER NETWORKING AND STP
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 65 CHAMBER NETWORKING AND STP
Storm Water Drains : NO 0 NA
Storm Water Drains : YES 0 LINES AND STP
Storm Water Drains : YES 70 LINES AND STP
Landscaping & Tree Planting : NO 0 NA
Landscaping & Tree Planting : YES 0 AS PER STATUTORY REQUIREMENTS
Landscaping & Tree Planting : YES 70 AS PER STATUTORY REQUIREMENTS
Street Lighting : NO 0 NA
Street Lighting : YES 0 AS PER DESIGN
Street Lighting : YES 65 AS PER DESIGN
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 TREATED IN STP RECYCLE FOR GARDENING
Solid Waste Management And Disposal : YES 0 AS PER STATUTORY REQUIREMENTS
Solid Waste Management And Disposal : YES 40 AS PER STATUTORY REQUIREMENTS

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 NYATI ESTEBAN I A1 31/12/2020 0 1 0 12 2 0 46
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3RHK 108.17 1 1
2 2RHK 85.72 1 1
3 3RHK 118.08 1 1
4 3RHK 123.07 1 1
5 3RHK 102.73 5 5
6 3RHK 103.52 5 5
7 2RHK 78.52 10 10
8 3RHK 102.48 4 4
9 3RHK 103.67 5 5
10 2RHK 78.89 10 10
11 3RHK 109.04 1 1
12 2RHK 82.61 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 75
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

70
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
11 Overall Percentage of Completion of the work done For the entire Building /Wing 77
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 NYATI ESTEBAN I A2 31/12/2020 0 1 0 12 2 0 46
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3.5 RHK 141.99 4 4
2 3.5 RHK 158.07 2 2
3 3.5 RHK 141.88 5 5
4 3.5 RHK 142.05 5 5
5 2RHK 71.06 5 5
6 2 RHK 71.00 5 5
7 3.5 RHK 141.82 5 5
8 2 RHK 71.38 10 10
9 3.5 RHK 151.82 1 1
10 2.5 RHK 120.89 1 1
11 2 RHK 74.41 2 2
12 3.5 RHK 151.99 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 85
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 45
11 Overall Percentage of Completion of the work done For the entire Building /Wing 63
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 NYATI ESTEBAN I A3 31/12/2020 0 1 0 12 2 0 46
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 RHK 123.07 2 2
2 3 RHK 108.75 10 10
3 2 RHK 72.80 10 10
4 2 RHK 75.87 2 2
5 3 RHK 114.40 2 2
6 3 RHK 108.99 10 10
7 2 RHK 72.43 10 10
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

35
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 55
11 Overall Percentage of Completion of the work done For the entire Building /Wing 69.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 NYATI ESTEBAN I B 31/12/2020 0 1 1 12 2 0 30
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 RHK 121.26 2 2
2 3 RHK 106.80 10 10
3 3 RHK 106.93 8 8
4 3 RHK 115.44 2 2
5 3 RHK 115.32 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 52
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 NYATI ESTEBAN I C1 31/12/2020 0 1 0 12 2 0 46
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 RHK 72.80 10 10
2 3 RHK 108.99 10 10
3 2 RHK 72.43 12 12
4 3 RHK 108.75 12 12
5 3 RHK 123.07 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 NYATI ESTEBAN I C2 31/12/2020 0 1 0 12 2 0 46
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2RHK 71.00 5 5
2 2RHK 71.38 10 10
3 2.5RHK 120.89 1 1
4 3.5 RHK 158.07 2 2
5 3.5RHK 141.88 6 6
6 3.5RHK 142.05 6 6
7 2RHK 71.06 7 7
8 3.5RHK 141.82 5 5
9 3.5RHK 141.99 4 4
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 NYATI ESTEBAN I C3 31/12/2020 0 1 0 12 2 0 46
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3RHK 108.99 10 10
2 2RHK 72.80 10 10
3 3RHK 123.07 2 2
4 3RHK 108.75 12 12
5 2RHK 72.43 12 12
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
RAHUL MALWADKAR NA Architect
NITIN SHANKAR KADDE A52100000577 Real Estate Agent
GLADWIN BAPTIST A52100002660 Real Estate Agent
JANET DORAIRAJ A52100004089 Real Estate Agent
ELARA MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
Addressofchoice Realty Pvt Ltd A52100000116 Real Estate Agent
A K Properties A52100000622 Real Estate Agent
PROPERTY CHEF CONSULTING SERVICES A52100000044 Real Estate Agent
CBRE South Asia Private Limited A51600003050 Real Estate Agent
Paresh Lachman Hardwani A52100000163 Real Estate Agent
JONES LANG LASALLE PROPERTY CONSULTANTS (INDIA) PRIVATE LIMITED A51900000251 Real Estate Agent
Ravi Chaitanya Varma A52100000903 Real Estate Agent
Shalini Ravi Varma A52100000047 Real Estate Agent
JN Realtors and Property Managers A52100004139 Real Estate Agent
Vijay Anand A52100000084 Real Estate Agent
PROPOZONE TECHNOLOGIES PRIVATE LIMITED A52100002247 Real Estate Agent
PROPFINDER INDIA PRIVATE LIMITED A52100004005 Real Estate Agent
HIREN NATVARLAL TRIVEDI A52100001413 Real Estate Agent
Makaan Hunt Pvt Ltd A52100000430 Real Estate Agent
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
Subhash Chandrakant Sonkamble A52100002477 Real Estate Agent
Ashwin Bhishma Vohra A52100002999 Real Estate Agent
NIKHIL JAIN A52100000055 Real Estate Agent
MAHEK KAPADIA A52100003545 Real Estate Agent
DIPEN LOOMBA A52100002949 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
PROPBUYING REALTORS PVT LTD A52100000476 Real Estate Agent
Property Pointer Private Limited A52100000787 Real Estate Agent
HDFC Realty Limited A51900000107 Real Estate Agent
Vivek G Pungaliya A52100000690 Real Estate Agent
Premlata Estate Solutions Pvt. Ltd. A52100000033 Real Estate Agent
Property Pointer Private Limited A52100000787 Real Estate Agent
Pankaj Kumar Chaurasia A52100000283 Real Estate Agent
chanderjeet chaturbhuj bhatia A52100002394 Real Estate Agent
Urvi Anchan A52100004475 Real Estate Agent
LAXMIKANT TANAJI DHANWADE A52100000144 Real Estate Agent
BILLION YARDS INFRATECH A51800003230 Real Estate Agent
Khushnum Nitin Chauhan A52100003503 Real Estate Agent
SOMNATH DNYANESHWAR HINGANE A52100000243 Real Estate Agent
Vikas Das A52100002200 Real Estate Agent
Zodiac Realtors and Developers A51800002891 Real Estate Agent
Vijay Purshottam Manakikar A52100000028 Real Estate Agent
Pramod Pandurang Potpelwar A52100004660 Real Estate Agent
MANJUSHA MAHESH BELLUR A52100000509 Real Estate Agent
Shrradhaa Daven Kakkad A52100000830 Real Estate Agent
Anupam Vinodkumar Gadodia A52100003713 Real Estate Agent
Mahesh Nanikram Lalchandani A52100001856 Real Estate Agent
Ameeth Kothari A52100000092 Real Estate Agent
Padmakshi Mondial Wealth Management Private Limited A51900003916 Real Estate Agent
AARTI AJAY CHAUBE A52100001933 Real Estate Agent
SHARMILA SWAMINATHAN IYER A52100002367 Real Estate Agent
LOVEENA LEONARDO A52100003486 Real Estate Agent
Ravi Chaitanya Varma A52100000903 Real Estate Agent
Shalini Ravi Varma A52100000047 Real Estate Agent
GLOBAL REALTORS A52100000018 Real Estate Agent
Arthur Morris A52100003774 Real Estate Agent
RAJNISH KUMAR JAIN A51800001742 Real Estate Agent
Chirag Saunak Kapadia A52100000054 Real Estate Agent
RAHUL ANAND GAIKWAD A52100000661 Real Estate Agent
Hitendra Panditrao Choudhary A52100001901 Real Estate Agent
PEARL REALTORS A52100000187 Real Estate Agent
KEY2HOME PROPERTY ADVISORS A52100000051 Real Estate Agent
ABHIJIT SAHEBRAO SABBARWAR A52100000382 Real Estate Agent
Atul Ramchandra Mazire A52100000560 Real Estate Agent
WG CDR VERINDAR KUMAR JANDIAL A52100002832 Real Estate Agent
My Home Real Estate A52100000038 Real Estate Agent
Moses Doming Mascarenhas A52100000747 Real Estate Agent
Pearlquest Associates Pvt Ltd A52100001979 Real Estate Agent
SAMSON DANIEL MASSY A52100001246 Real Estate Agent
Khozem Taher Bayadwala A52100005032 Real Estate Agent
Prasad Hanmant Kulkarni A52100000272 Real Estate Agent
Amrut Shantaram Ghorpade A52100000268 Real Estate Agent
Richa Bijlani A52100004019 Real Estate Agent
Rajendra Kumar Rathore A52100000247 Real Estate Agent
YASHODHAR PURUSHOTTAM KARMARKAR A52100001983 Real Estate Agent
PROPENGINE REALTECH LLP A52100000628 Real Estate Agent
Kiran Girish Padiyar A52100007132 Real Estate Agent
ASHISH TANDON A52100008836 Real Estate Agent
S SATYANARAYAN PATRO A52100007317 Real Estate Agent
Parvez Fida Shaikh A52600008677 Real Estate Agent
Yatish Lalwani A52100007824 Real Estate Agent
Adesign studio NA Architect
Design Werkz Engneering Pvt Ltd NA Engineer
Vipin Gujarathi & Associates NA Chartered Accountant
Chirag P Shah & Co NA Chartered Accountant
Zopate Electrical Consultants Pvt.Ltd. NA Other Professional
S N Joshi Consultants Pvt Ltd NA Other Professional
Narayan Bhagwath Patra NA Contractor

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
NYATI ESTEBAN I CIVIL JUDGE SENIOR DIVISION PUNE 403 Civil Yes Suit NA 2012 DISPOSED
NYATI ESTEBAN I CIVIL JUDGE SENIOR DIVISION PUNE 188 Civil No Suit NA 2014 UNREADY HEARING
NA
NYATI ESTEBAN I CIVIL JUDGE SENIOR DIVISION PUNE 2599 Civil No Suit NA 2010 HEARING
NA
NYATI ESTEBAN I ADDITIONAL COLLECTOR PUNE RTS APPEAL 96 Civil Yes Appeal NA 2015 HEARING
NYATI ESTEBAN I Civil Judge Senior Division Pune 1753 Civil No Suit NA 2008 Hearing
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
4 Copy of the legal title report
5 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
25 Building Plan Approval (IOD)
26 Building Plan Approval (IOD)
27 Building Plan Approval (IOD)
28 Building Plan Approval (IOD)
29 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
5 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
6 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5)
2 Annual Audit Report of Statutory CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
5 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
2 Architect’s Certificate on Completion of Project (Form 4)
3 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000000363 Shakunata Zanvar View Orders
2 CC005000000010557 Swapnil and Preeti Mitkari View Orders
3 CC005000000010557 Swapnil and Preeti Mitkari View Orders
4 CC005000000010432 Ajay Kumar Patel View Orders
5 CC005000000010432 Ajay Kumar Patel View Orders
6 CC005000000010758 Muzammil Abdul Majeed Desai View Orders
7 CC005000000011023 ARJUN RAWAT View Orders
8 CC005000000011457 Vikas Deo Shett View Orders
9 CC005000000011457 Neeta Vikas Shett View Orders
10 CC005000000011721 Wincy Dominic Savio Dsouza View Orders
11 CC005000000022260 Kulwant Singh Reen & Gurpreet Kour Reen View Orders
12 CC005000000022868 Nyati Realtors LLP View Orders