MahaRERA Application

General Information

Other Than Individual

Organization

Proviso Builders and Developers
Others
Consortium
Do you have any Past Experience ?
Yes

Address Details

1201/1301
Bhumiraj Costarica
Palm Beach Road
Sanpada
Near Moraj Residency
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400705

Organization Contact Details

02267676868

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Proviso HeightsOthersResidential Plus Commercial3699.68Plot No. 179 Sector 17 Ulwe Navi Mumbai-41020617931352016-06-302016-05-31
2Galaxy NebulaResidentialNA2650.06Plot no 220 and 221 sector 10 Kharghar Navi mumbai220 and 2212802013-06-302013-07-12
3Galaxy OrionResidentialNA2699.55Plot no.50 A Sector -35D Kharghar50A2932013-12-312013-07-25
4Galaxy CarinaOthersResidential cum Commercial2781.79plot no 10 sector 15 Kharghar Navi mumbaiplot no 101892015-12-312015-05-21
5Proviso CornerOthersResidential cum commercial1749.83plot no 224 sector 23 ulweplot no 2241622016-06-302016-08-22
6Proviso ComplexOthersResidential cum commercial4770.91plot no 5 6 7 sector 35 E kharghar navi mumbaiPlot no 5, 6, 731592014-09-302013-07-18

Other Organization Type Member Information

Name Member Type
M/s proviso builders and developers Partnership
M/s Sai proviso Developers Partnership

Project

Sai Proviso County
On-Going Project
31/12/2019
30/06/2021
31/12/2023
No
Residential
Yes
154/1 New Survey No.399/132 to 399/137, 399/147, 399/148, 399/148 A, 399/170, 399/171, 162/3, 154/3
Gaothan
Survey No 399-146
Survey No 191
Survey No 154-4
MAHARASHTRA
Konkan
Raigarh
Panvel
Shirdhon
Mumbai Goa Highway
Panvel
410221
20600
9
8
1
2204.42

FSI Details

14059.42
6497.71
20557.13

Bank Details

ICICI Bank Ltd
ICIC0000956

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Sai Proviso County SAI PROVISO DEVELOPERS Partnership Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 856 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 NA
Water Conservation, Rain water Harvesting : YES 100 NA
Energy management : YES 100 NA
Fire Protection And Fire Safety Requirements : YES 100 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 80 NA
Aggregate area of recreational Open Space : YES 0 NA
Open Parking : YES 0 NA
Water Supply : YES 80 NA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 NA
Storm Water Drains : YES 100 NA
Landscaping & Tree Planting : YES 100 NA
Street Lighting : YES 100 NA
Community Buildings : YES 100 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 NA
Solid Waste Management And Disposal : YES 100 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Sai Proviso County Carol 31/12/2020 0 1 0 5 1 0 139
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 43.45 3 3
2 1BHK 32.64 3 3
3 2BHK 43.44 3 3
4 2BHK 43.42 3 3
5 1BHK 33.28 3 3
6 1BHK 33.12 3 3
7 1BHK 33.06 3 2
8 1BHK 36.38 1 1
9 1BHK 33.39 3 3
10 1BHK 33.10 3 3
11 2BHK 43.43 3 3
12 1BHK 43.48 1 0
13 2BHK 50.68 2 2
14 2BHK 49.36 2 2
15 1BHK 37.29 1 1
16 1BHK 36.80 1 1
17 1BHK 36.56 1 1
18 1BHK 38.20 1 1
19 1BHK 36.19 1 0
20 1BHK 42.18 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 83.4
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Sai Proviso County Crystal 31/12/2020 0 1 0 5 1 0 162
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 43.00 6 6
2 2BHK 43.19 6 6
3 2BHK 42.95 6 6
4 1BHK 33.23 6 6
5 2BHK 42.96 6 6
6 2BHK 48.03 2 2
7 2BHK 51.46 2 2
8 2BHK 49.78 2 2
9 2BHK 49.38 2 2
10 1BHK 33.24 6 6
11 1BHK 38.76 2 2
12 1BHK 39.03 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 83.4
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Sai Proviso County Daisy 31/12/2020 0 1 0 5 1 0 132
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 39.03 2 0
2 2BHK 43.00 6 6
3 2BHK 48.03 2 2
4 2BHK 51.46 2 2
5 2BHK 49.78 2 2
6 2BHK 49.38 2 2
7 1BHK 33.23 6 6
8 2BHK 42.96 6 6
9 2BHK 42.95 6 6
10 2BHK 43.19 6 6
11 1BHK 38.76 2 0
12 1BHK 33.24 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 83.4
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Sai Proviso County Ebony 31/12/2020 0 1 0 5 1 0 52
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 33.08 3 0
2 1BHK 33.22 3 3
3 1BHK 36.49 1 1
4 1BHK 35.87 1 1
5 2BHK 49.18 2 2
6 1BHK 43.18 1 1
7 1BHK 38.65 1 1
8 1BHK 41.95 1 1
9 2BHK 55.57 1 1
10 1BHK 33.38 3 3
11 1BHK 33.27 3 3
12 1BHK 39.21 2 2
13 1BHK 36.38 1 0
14 2BHK 47.47 2 1
15 1BHK 36.80 1 0
16 1BHK 36.74 1 0
17 1BHK 52.02 1 1
18 2BHK 55.26 1 0
19 2BHK 46.69 3 3
20 2BHK 51.70 1 1
21 2BHK 46.73 3 3
22 1BHK 32.68 3 3
23 2BHK 46.75 3 3
24 2BHK 43.40 9 9
25 2BHK 43.38 3 3
26 1BHK 33.26 3 0
27 1BHK 33.13 1 1
28 1BHK 33.12 1 1
29 2BHK 46.68 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 83.4
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 Sai Proviso County Fern 31/12/2020 0 1 0 5 1 0 42
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 46.68 3 3
2 1BHK 36.49 1 0
3 1BHK 35.87 1 0
4 2BHK 51.70 1 1
5 1BHK 32.68 3 0
6 1BHK 38.65 1 0
7 1BHK 36.80 1 0
8 1BHK 36.38 1 0
9 2BHK 46.73 3 3
10 2BHK 46.75 3 3
11 2BHK 43.40 9 9
12 1BHK 33.38 3 3
13 2BHK 43.38 3 3
14 2BHK 52.02 1 1
15 1BHK 33.22 3 3
16 1BHK 33.08 3 1
17 1BHK 36.74 1 1
18 1BHK 43.18 1 1
19 1BHK 41.95 1 1
20 2BHK 51.97 1 1
21 2BHK 51.65 1 1
22 1BHK 33.27 3 3
23 1BHK 39.21 2 2
24 1BHK 33.12 1 1
25 1BHK 33.14 1 1
26 2BHK 46.69 3 3
27 2BHK 47.47 4 4
28 1BHK 33.26 3 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

97
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 82.9
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 Sai Proviso County Hazel 31/12/2020 0 1 0 5 1 0 145
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 46.77 3 3
2 1BHK 38.76 1 0
3 1BHK 36.73 1 0
4 1BHK 35.38 1 0
5 2BHK 53.40 1 1
6 1BHK 33.35 3 3
7 1BHK 39.03 1 1
8 1BHK 36.69 1 1
9 1BHK 54.51 1 1
10 1BHK 33.34 3 3
11 1BHK 33.13 3 3
12 1BHK 33.28 3 3
13 2BHK 46.71 3 3
14 2BHK 46.78 3 3
15 1BHK 53.08 1 1
16 1BHK 32.72 3 3
17 1BHK 36.83 1 1
18 2BHK 46.73 3 3
19 2BHK 55.60 1 1
20 1BHK 33.14 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 83.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 Sai Proviso County Iris 31/12/2020 0 1 0 5 1 0 78
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 33.68 3 3
2 2BHK 43.41 3 3
3 2BHK 43.46 3 3
4 1BHK 33.16 3 3
5 1BHK 33.06 1 0
6 1BHK 36.40 1 0
7 1BHK 36.38 1 0
8 1BHK 35.83 1 0
9 1BHK 42.80 2 0
10 1BHK 33.75 3 2
11 2BHK 43.43 6 6
12 1BHK 33.23 3 3
13 1BHK 33.54 1 1
14 1BHK 37.48 1 1
15 2BHK 48.89 4 4
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 83.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
8 Sai Proviso County Oceana 31/12/2020 0 1 0 5 1 0 106
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 38.47 1 0
2 2BHK 49.36 1 0
3 1BHK 33.13 3 1
4 2BHK 50.70 1 1
5 2BHK 52.51 1 1
6 2BHK 51.02 1 1
7 2BHK 50.08 1 1
8 2BHK 52.52 1 1
9 2BHK 43.46 3 3
10 2BHK 43.49 6 6
11 2BHK 52.19 1 1
12 2BHK 43.47 3 3
13 1BHK 31.65 3 3
14 2BHK 46.78 3 3
15 1BHK 28.01 1 0
16 1BHK 37.06 1 0
17 1BHK 38.65 1 0
18 2BHK 46.85 3 3
19 2BHK 46.79 3 3
20 2BHK 46.84 3 3
21 1BHK 31.45 3 3
22 1BHK 33.04 3 1
23 1BHK 35.62 1 1
24 2BHK 48.95 1 1
25 1BHK 32.81 3 3
26 1BHK 27.94 1 1
27 1BHK 33.32 3 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 99
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
11 Overall Percentage of Completion of the work done For the entire Building /Wing 83.4
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
9 Sai Proviso County Club Eros 0 1 0 2 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Club Eros 280.86 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Rajesh R C NA Architect
Samarth Agarwal NA Engineer
Gowardhan Enterprises NA Contractor
JONES LANG LASALLE RESIDENTIAL PRIVATE LIMITED A51900000108 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
4 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
7 Copy of Layout Approval (in case of layout)
8 Copy of Layout Approval (in case of layout)
9 Copy of Layout Approval (in case of layout)
10 Copy of Layout Approval (in case of layout)
11 Copy of Layout Approval (in case of layout)
12 Copy of Layout Approval (in case of layout)
13 Copy of Layout Approval (in case of layout)
14 Copy of Layout Approval (in case of layout)
15 Copy of Layout Approval (in case of layout)
16 Copy of Layout Approval (in case of layout)
17 Copy of Layout Approval (in case of layout)
18 Copy of Layout Approval (in case of layout)
19 Copy of Layout Approval (in case of layout)
20 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
3 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
5 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000089648 Ashutosh Sah View Orders