MahaRERA Application

General Information

Other Than Individual

Organization

NAKSHATRA BUILDERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

504
ASHA TOWER
NEAR DURGADI
OPP TANISHQ
KALYAN
MAHARASHTRA
Konkan
Thane
Kalyan
Kalyan
421301

Organization Contact Details

09323129000

Past Experience Details

Member Information

Member Name Designation Photo
MANOHAR HARIRAM MANCHANDYA Authorized Signatory View Photo
MAHESH AVCHAR GALA Authorized Signatory View Photo
VIKAS GABAJI DABHADE Partner View Photo

Project

METRO MAJESTIC
New Project
30/11/2024
No
Residential
No
SURVEY NO206 H NO.1 PT,4PT,6PT
12 MW LAYOUT ROAD
BUILDING 33
PROPOSED 44 MW DP ROAD
12 MW LAYOUT ROAD
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
Pokhran Road No 1 Near Datta Temple, Shavali Society, Shatri Nagar, Vartak Nagar,
Thane
400606
2250.68
1
1
0
0

FSI Details

5522.39
5995.59
11517.98

Bank Details

GP PARSIK SAHAKARI BANK LTD
PJSB0000007

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 140 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 RAIN WATER HARVESTING
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 AS PER CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 -
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 BY TMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP AND SEPTIC TANKS NOT REQUIRED
Storm Water Drains : YES 0 AS PER TMC NOC
Landscaping & Tree Planting : YES 0 -
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 METRO MAJESTIC BUILDING 1 30/11/2024 0 1 0 16 1 0 140
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 35.50 64 0
2 2BHK 50.57 29 0
3 2BHK 50.45 32 0
4 1BHK 35.64 32 0
5 Office space 181.79 1 0
6 Office space 165.50 1 0
7 Office space 50.10 1 0
8 Office space 39.72 1 0
9 Office space 50.47 1 0
10 Office space 47.12 1 0
11 Office space 42.38 1 0
12 Office space 36 2 0
13 Shop 11.18 1 0
14 Shop 13.32 4 0
15 Shop 15.05 1 0
16 Shop 15.97 1 0
17 Shop 16.72 1 0
18 Shop 17.01 5 0
19 Shop 17.51 1 0
20 Shop 17.76 1 0
21 Shop 18.09 1 0
22 Shop 19.45 1 0
23 Shop 19.74 1 0
24 Shop 21.95 1 0
25 Shop 46.59 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 80
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 40
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
DESIGN CONSORTIUM NA Architect
PENTACON STRUCTURALCONSULATANTS PVT LTD NA Engineer
YJ PADHYE & CO NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 CERSAI details
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Disclosure of sold/ booked inventory
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of the allotment letter and agreement for sale
2 Proforma of the allotment letter and agreement for sale
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other