MahaRERA Application

General Information

Other Than Individual

Organization

SQUAREFEET INFRASTRUCTURE LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

A1/104
GRAND SQUARE
GHODBUNDER ROAD
THANE
BEHIND BHAKTI PARK COMPLEX
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400607

Organization Contact Details

02225452903
WWW.SQUAREFEETGROUP.IN

Past Experience Details

Member Information

Member Name Designation Photo
MANISH SAJJANRAJ JAIN Partner View Photo
NAVIN PANCHALAL SAVLA Partner View Photo
DEEPAK PARASMAL JAIN Partner View Photo
MANSUKH VELJI SHAH Partner View Photo
RAMESH VELJI SHAH Partner View Photo
VIVEK MAHESHCHANDRA MANGLA Partner View Photo
RAJNI KANYALAL DHIRMALANI Partner View Photo
RAJEEV MANILAL SAVLA Partner View Photo
KAMLESH BHAGWANDAS BATHIJA Partner View Photo
SACHIN CHANDRU MIRANI Authorized Signatory View Photo
SACHIN CHANDRU MIRANI Partner View Photo

Project

REGAL SQUARE PHASE II BUILDING NO 4 AND 5
On-Going Project
31/12/2018
30/12/2021
Yes
Residential
No
5/2p,5/2p,5/1p/1
SURVEY NO 5 HISSA NO 1 PT
STADIUM
SURVEY NO 5 HISSA NO 1 PT
EXISTING ROAD
MAHARASHTRA
Konkan
Thane
Bhiwandi
Bhiwandi (M Corp.)
Sonale Bhadwad Road
Bhadwad Temghar Pada
421308
482.32
2
2
0
0

FSI Details

4160.64
0
4160.64

Bank Details

KOTAK MAHINDRA BANK
KKBK0000655

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 23 23 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 RECHARGE PITS SHALL BE DONE PRIOR TO OC
Energy management : YES 100 SOLAR WATER HEATING SYSTEM AS PER BNCMC
Fire Protection And Fire Safety Requirements : YES 100 AS PER CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 AS PER TORRENT
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 100 BY BNCMC municipal cor supply
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 SEPTIC TANK READY
Storm Water Drains : YES 100 SURFACE DRAIN SYSTEM DONE
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 REGAL SQUARE PHASE II BUILDING NO 4 AND 5 4 31/12/2020 0 1 0 13 0 0 12
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.88 23 23
2 2BHK 45.66 24 24
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 REGAL SQUARE PHASE II BUILDING NO 4 AND 5 5 31/12/2020 0 1 0 13 11 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.88 23 23
2 2BHK 45.66 24 23
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SHRADDHA A PARANJPE NA Architect
MB CONSTRUCTION NA Contractor
AJAY MAHALE & ASSOCIATES NA Engineer
ATULKUMAR ISHWARLAL THAKKAR A51800003599 Real Estate Agent
Bhupinder Singh Saini A51700001823 Real Estate Agent
Jiten Hansraj Shah A51700008864 Real Estate Agent
RAYYAN ANWAR TUNGEKAR A52000003477 Real Estate Agent
VARSHA SANJIV PANDHARE A51700017106 Real Estate Agent
NEHA AMIT BIYANI NA Chartered Accountant

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
REGAL SQUARE PHASE II BUILDING NO 4 AND 5 IN THE HIGH COURT OF JUDICATURE AT BOMBAY 836 Civil No Suit NA 2014 PENDING
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
1 CERSAI details
2 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement