MahaRERA Application

General Information

Other Than Individual

Organization

Sheth Creators and Sunvision Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

NIL
SHEELA NIWAS
RAMABAI CHEMBURKAR MARG
VILE PARLE EAST
NEAR SUN CITY CINEMA
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400057

Organization Contact Details

02242005300

Past Experience Details

Member Information

Member Name Designation Photo
VALLABH NATWARLAL SHETH Authorized Signatory View Photo
JITENDRA NATWARLAL SHETH Authorized Signatory View Photo
SURESH MENGHRAJ SHROFF Authorized Signatory View Photo
SURAJ SURESH SHROFF Authorized Signatory View Photo

Project

IRENE WING A PHASE 1
New Project
31/12/2024
Yes
Residential
No
230,231,232
REHAB BUILDING
R G NO 2
JAGAMAGIA CENTRE
IRENE WING B
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
NEAR MITTAL COLLEGE
MALAD WEST
400064
503.50
1
1
0
0

FSI Details

4173.94
9845.08
14019.02

Bank Details

YES BANK
YESB0000268

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 285 108 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Proposed - Rain Water Harvesting.
Energy management : YES 0 As per MOEF Requirement.
Fire Protection And Fire Safety Requirements : YES 0 Proposed as per CFO requirements.
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Proposed - Electric Meter Room
Alfresco Deck : YES 0 Proposed
Amphitheatre : YES 0 Proposed
BBQ Deck : YES 0 Proposed
Entrance Lobby : YES 0 Proposed
Gymnasium : YES 0 Proposed
Kids Play Area : YES 0 Proposed
Landscape Area : YES 0 Proposed
Multi Purpose Court : YES 0 Proposed
Old Falks Corner : YES 0 Proposed
Outdoor Seating : YES 0 Proposed
Party Lawn : YES 0 Proposed
Reading Zone : YES 0 Proposed
Reflexology Area : YES 0 Proposed
T V Lounge : YES 0 Proposed
Tot Lot Area : YES 0 Proposed
Walk Way : YES 0 Proposed
Yoga Deck : YES 0 Proposed
Aggregate area of recreational Open Space : NO 0 Proposed- Substat
Open Parking : NO 0 NA
Water Supply : YES 0 Proposed - BMC Water connection.
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Proposed - STP. To be handed over to Apex body. Pa
Storm Water Drains : YES 0 Proposed - SWD.
Landscaping & Tree Planting : YES 0 Proposed - Landscape & Tree Planting.
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Proposed.
Solid Waste Management And Disposal : YES 0 Proposed - OWC and disposal through Vendor.

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 IRENE WING A PHASE 1 IRENE WING A PHASE 1 31/12/2024 1 1 9 52 1 0 285
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 59.70 10 1
2 1BHK 43.35 10 7
3 1BHK 40.35 16 7
4 2BHK 61.50 10 6
5 2BHK 58.86 10 7
6 2BHK 61.75 30 18
7 2BHK 59.00 30 17
8 2BHK 61.00 30 9
9 1BHK 43.50 30 11
10 1BHK 40.40 52 26
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 40
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 5
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 24.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
ARUN GURAV NA Architect

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
IRENE WING A PHASE 1 Additional Chief Metropolitan Magistrates twentyfourth Court 80 Criminal No Other 2010 PENDING
NA
IRENE WING A PHASE 1 Additional Chief Metropolitan Magistrates Twentyfourth Court SS/2400513 Criminal No Suit 2010 PENDING
NA
IRENE WING A PHASE 1 BOMBAY CITY CIVIL COURT 331 Civil No Suit 2018 PENDING
NA
IRENE WING A PHASE 1 MUMBAI HIGH COURT 7190 Civil No Writ Petition 2016 PENDING
NA
IRENE WING A PHASE 1 BOMBAY CITY CIVIL COURT 1162 Civil No Suit 2016 PENDING
NA
IRENE WING A PHASE 1 MUMBAI HIGH COURT 1016 Civil No Writ Petition 2012 PENDING
NA
IRENE WING A PHASE 1 Honerable Court of Sessions for Borivali Division Goregaon Bombay 200274 Criminal No Other 2016 PENDING
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other