MahaRERA Application

General Information

Other Than Individual

Organization

KOSMOS & APPLE REALTY
Partnership
NA
Do you have any Past Experience ?
No

Address Details

C 511
JASWANTIALLIEDBUSINESS CENTRE
KANCHPADA
RAMCHANDRA LANE EXTN
PARAS INDUSTRIAL ESTATE
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400064

Organization Contact Details

02228852269

Past Experience Details

Member Information

Member Name Designation Photo
MUKUND POPATBHAI PARMAR Partner View Photo
BRAHMDEV DUDHNATH SHUKLA Partner View Photo
PREETI RAKESH SINGH Partner View Photo
RAKESH VIRENDRAKUMAR SINGH Authorized Signatory View Photo

Project

OM HEIGHTS
On-Going Project
31/12/2020
30/06/2021
30/12/2022
No
Others
No
17, 17/1 TO 21 - 18
HAJI PABU ROAD
ARIHANT ASHISH CHSL
EXISTING DP ROAD
TOWER 28
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
HAJI BAPU ROAD
MALAD
400097
1400.03
1
1
0
0

FSI Details

1396.82
4122.98
5519.80

Bank Details

AU Small Finance Bank Limited
AUBL0002341

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 74 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 Rain Water Harvesting Completed on site
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 90 Fire Fighting system installation work is being
Electrical Meter Room, Sub-Station, Receiving Station : YES 70 work of meter room completed.installation of elect
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 will be applied after OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 Drainage work completed
Storm Water Drains : YES 100 connection to BMC pending
Landscaping & Tree Planting : YES 0 Ground development work balance on site
Street Lighting : YES 100 Will be completed as per DCPR 2034 for OCC
Community Buildings : NO 0 Existing street light poles available at plot
Treatment And Disposal Of Sewage And Sullage Water : YES 0 NA
Solid Waste Management And Disposal : NO 0 Treatment plant not proposed. drainage line work

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 OM HEIGHTS OM HEIGHTS 30/06/2022 0 1 0 24 1 0 74
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 26.78 1 1
2 1BHK 21.83 1 1
3 1BHK 26.78 10 10
4 1BHK 26.89 2 2
5 1BHK 28.02 1 1
6 1BHK 28.71 1 1
7 1BHK 33.73 6 5
8 1BHK 34.05 9 9
9 1BHK 38.75 2 2
10 Shop 14.25 1 1
11 Shop 10.69 1 1
12 Shop 24.37 1 1
13 Shop 23.24 1 1
14 Shop 19.85 1 0
15 Shop 21.12 1 0
16 1BHK 39.67 1 0
17 1BHK 39.68 18 17
18 2BHK 48.09 1 1
19 2BHK 50.59 1 1
20 2BHK 52.89 1 1
21 2BHK 56.31 1 1
22 2BHK 57.65 16 12
23 HALL1 425 1 0
24 HALL2 425 1 0
25 Shop 67.92 1 1
26 Shop 18.34 1 1
27 Shop 22.27 1 1
28 1BHK 39.59 20 17
29 1BHK 41.17 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 77

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
MAHENDRAKUMAR UMEDMAL JAIN A51800002877 Real Estate Agent
BIRJU GIRDHARBHAI NAGAR A51800002241 Real Estate Agent
IND + Architect NA Architect
HIRAL SOMAIYA AND ASSOCIATES NA Architect
Ascent Structural Engineering PvtLtd NA Engineer
HARSHADMAANOHAARMORE NA Other Professional

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
4 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
7 Other
8 Other
9 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to model copy of Agreement
1 Deviation Report with respect to Allotment letter