MahaRERA Application

General Information

Other Than Individual

Organization

GOLDSTAR SANKALP CONSTRUCTION
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

101
MONALISA SOCIETY
KASTURBA ROAD
NEAR STATION
ABOVE BHARAT BANK
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400064

Organization Contact Details

02228449393
www.goldstargroup.in

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1CELESTE KINCHIN CHS LTDResidentialNA61014TH ROAD KHAR WEST MUMBAIF 104 F P NO 470 PS III VILLAGE BANDRA1212016-03-312016-06-20

Member Information

Member Name Designation Photo
ATUL SHAH Partner View Photo
ATUL SHAH Authorized Signatory View Photo
PRAGNESH SHAH Authorized Signatory View Photo
PRAGNESH SHAH Partner View Photo

Project

GOLDSTAR DECENT HOMES
On-Going Project
31/12/2018
31/12/2018
31/12/2019
Yes
Residential
No
S NO 104 VILLAGE GHODBUNDER TALUKA AND DIST THANE NEAR MIRAROAD EAST
D P ROAD
S NO 88
S NO 103
S NO 100
MAHARASHTRA
Konkan
Thane
Thane
Mira-Bhayandar (M Corp.)
401107
6246.33
1
1
0
484.74

FSI Details

3152.26
0
3152.26

Bank Details

ICICI BANK LTD
ICIC0000158

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 6 5 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 DONE
Water Conservation, Rain water Harvesting : YES 100 DONE
Energy management : YES 100 DONE
Fire Protection And Fire Safety Requirements : YES 100 DONE
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 DONE
Automatic Power Backup Generator : YES 100 Done
Borewell for Toilet flushing water : YES 100 DONE
Building Intercom System : YES 100 Done
CCTV Surveillance system : YES 100 Done
Compound Lights Automation system : YES 100 Done
Drip Irrigation system for Trees and Plants : YES 100 Done
Entrance Lobby Bio-metric access system : YES 100 Done
Entrance Lobby Lights Automation System : YES 100 Done
Mahanagar Gas pipelines and connections : YES 100 Done
MIRA BHAYANDER MUNICIPAL RECREATION GARDEN : YES 100 DONE AND OPENED FOR PUBLIC TO USE
Night Watchman Alert Systems : YES 100 Done
Open Bike Parking : YES 100 DONE
Play area : YES 100 DONE
Refuge Area : YES 100 DONE
Ring well for Flushing and car washing water supply : YES 100 DONE
Seating area : YES 100 DONE
Security Cabin and Main security Gate : YES 100 DONE
Solar water heating system : YES 100 DONE
Staircase Lights Automation System : YES 100 Done
Toilets for watchman Drivers and Servants : YES 100 DONE
Aggregate area of recreational Open Space : YES 100 DONE
Open Parking : YES 100 DONE
Water Supply : YES 100 MUNICIPAL WATER CONNECTION& BORE & RING WELL DONE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 DONE
Storm Water Drains : YES 100 DONE
Landscaping & Tree Planting : YES 100 DONE
Street Lighting : YES 100 DONE
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 100 NA
Solid Waste Management And Disposal : YES 100 DONE

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 GOLDSTAR DECENT HOMES GOLDSTAR DECENT HOMES 31/12/2018 0 1 0 12 1 25 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 MULTIPURPOSEROOM 17.74 2 2
2 MULTIPURPOSEROOM 20.25 2 2
3 SHOP 17.74 2 2
4 SHOP 22.01 4 3
5 SHOP 20.25 2 2
6 SHOP 21.55 1 1
7 2bhkTerrace 47.28 2 0
8 1BHKterrace 34.75 2 0
9 MUTIPURPOSEROOM 21.55 1 1
10 2bhk 47.28 26 13
11 1 BHK 34.75 29 18
12 3BHKANDVERANDAH 57.32 1 0
13 1RK 22.01 4 4
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 12
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 81.2

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Bhaveshkumar s Sheth & company CA NA Other Professional
Anil R Deora A51800000069 Real Estate Agent
Jagdish B Shah STRUCTURAL CONSULTANTS NA Engineer
SANJAY RAUT CIVIL CONTRACTOR NA Contractor
MOHD ABDUL HAMID KHAN WATER PROOFING CONTRACTOR NA Contractor
RAMESH JOSHI PLUMBING CONTRACTOR NA Contractor
RADHEYSHYAM VISHWAKARMA CARPENTER NA Contractor
NAZIM AHMED SHAIKH FABRICATOR NA Contractor
DATTA GAIKWAD painting contractor NA Contractor
MANGESH M MAYEKAR NA Other Professional
Devram C Patel Electrical Contractor NA Contractor
UMAKANT CHIKLE SOLAR WATER HEATER SYSTEM CONTRACTOR NA Contractor
P G JACOB PILING CONTRACTOR NA Contractor
ABHISEK S MISHRA NA Other Professional
SANTOSH P LAD DIRECTOR THYSSEN KRUPP ELEVATORS INDIA PVT LTD LIFTS SUPPLIERS AND INSTALLERS NA Contractor
SURAJ PATIL NIRMEEK ASSOCIATES NA Architect
HDFC RED HDFC DEVELOPERS LIMITED A51900000930 Real Estate Agent
MALLIKARJUN ENTERPRISE MR LINGANA TILING CONTRACTOR NA Contractor
Kamal Kishor Khetan A51700000922 Real Estate Agent
MalikMakaan A51800001064 Real Estate Agent
ABHIDI REALTY ADVISORS PVT.LTD. A51900002423 Real Estate Agent
ABHIDI RETAIL ADVISORS LLP A51900002874 Real Estate Agent
ASHOK MANOHARLAL SHARMA A51700009971 Real Estate Agent
SHAILENDRA KUMAR SHARMA A51700001348 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
GOLDSTAR DECENT HOMES High court mumbai 491 Civil Yes Appeal NA 2016 order passed in favour of Sankalp construction

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
6 Commencement Certificates / NA Order for plotted development
7 Commencement Certificates / NA Order for plotted development
8 Commencement Certificates / NA Order for plotted development
9 Commencement Certificates / NA Order for plotted development
10 Commencement Certificates / NA Order for plotted development
11 Commencement Certificates / NA Order for plotted development
12 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Certificates of Architect (Form 4)
1 Status of Formation of Legal Entity
2 Status of Formation of Legal Entity
3 Status of Formation of Legal Entity
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
7 Other
8 Other
9 Other
10 Other
11 Other
12 Other
13 Other
14 Other
15 Other
16 Other
17 Other
18 Other
19 Other
20 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement