MahaRERA Application

General Information

Other Than Individual

Organization

SUMER CORPORATION
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

Office No -203 A Wing
Peninsula Corporate Park
Ganpatrao Kadam Marg
Lower Parel
Mumbai
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
400013

Organization Contact Details

02240684068

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Sumer LifeOthersResidential and Commercial12015CTS NO 11A pt11 191to402 11D pt 16 16 1to92 19 19 1to28 20pt 25pt 25 1to32 50pt ChandivaliCTS NO 11A pt11 191to402 11D pt 16 16 1to92 19 19 1to28 20pt 25pt 25 1to32 50pt33272024-06-302024-06-30

Member Information

Member Name Designation Photo
Rahul Ramesh Shah Authorized Signatory View Photo
Rahul Ramesh Shah Partner View Photo
Ramesh Sumermal Shah Partner View Photo

Project

SUMER LIFE
New Project
30/12/2024
Yes
Others
No
CTS No - 11A pt., 11A/ 191 to 402, 11D pt., 16, 16/ 1 to 92, 19, 19/1 to 28, 20 pt., 25 pt., 25/ 1 to 32, 50 pt.
By CTS No 11 -A Part of Village Chandivali
By 18 Mtrs Wide D P Road
CTS No -11 A Part of Village Chandivali
CTS No 11 A Part of Village Chandivali
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
Chandivali
Chandivali
400072
12015
3
3
0
1802.25

FSI Details

17213.86
0
17213.86

Bank Details

HDFC Bank LTD
HDFC0000060

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 335 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 As per MCGM Norms
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 As per MCGM Norms
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 As per Approved Plan
Aggregate area of recreational Open Space : YES 0 As per Approved Plan
Open Parking : NO 0 NA
Water Supply : YES 0 As per MCGM Norms
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 As per MCGM Norms
Storm Water Drains : YES 0 As per MCGM Norms
Landscaping & Tree Planting : YES 0 As per MCGM Norms
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SUMER LIFE WING -A 30/06/2023 2 1 2 19 1 0 118
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 21.29 1 0
2 Shop 21.42 1 0
3 Shop 21.44 1 0
4 Shop 19.22 1 0
5 Shop 19.36 1 0
6 Shop 19.47 2 2
7 Shop 17.22 1 0
8 Shop 17.32 5 2
9 Shop 18.04 2 1
10 Shop 18.23 1 1
11 Shop 18.42 1 1
12 Shop 18.48 1 0
13 Shop 18.52 1 0
14 Shop 18.63 1 1
15 Shop 18.74 1 0
16 Shop 18.75 1 1
17 Shop 18.88 2 1
18 Shop 18.91 1 0
19 Shop 19.03 1 1
20 Shop 19.04 1 0
21 Shop 19.06 1 1
22 Shop 19.08 1 1
23 Shop 19.19 1 1
24 Shop 15.39 1 0
25 Shop 15.45 1 0
26 Shop 15.49 1 0
27 Shop 15.52 1 0
28 Shop 15.85 1 0
29 Shop 15.95 1 0
30 Shop 16.06 1 0
31 Shop 21.46 1 0
32 Shop 21.51 1 0
33 Shop 21.57 1 0
34 Shop 21.73 1 0
35 Shop 16.27 1 0
36 Shop 16.60 1 0
37 Shop 16.90 1 0
38 Shop 19.49 1 0
39 Shop 19.51 1 1
40 Shop 17.06 2 0
41 Shop 17.08 2 0
42 Shop 17.21 2 0
43 Shop 19.63 1 0
44 Shop 19.66 1 0
45 Shop 21.75 1 0
46 Shop 21.89 1 0
47 Shop 22.19 1 0
48 Shop 22.20 1 0
49 Shop 22.35 1 0
50 Shop 22.45 1 0
51 Shop 22.53 1 0
52 Shop 22.63 1 0
53 Shop 23.07 1 0
54 Shop 23.68 1 0
55 Shop 24.16 1 1
56 Shop 24.88 1 0
57 Shop 25.37 1 0
58 Shop 26.88 1 1
59 Shop 30.01 1 0
60 Shop 20.35 1 0
61 Shop 20.59 1 0
62 Shop 20.93 2 2
63 Shop 20.97 1 1
64 Shop 21.09 1 0
65 Shop 32.42 1 1
66 Shop 48.71 1 0
67 Shop 56.86 1 0
68 Shop 61.37 1 0
69 Shop 177.60 1 0
70 Shop 12.69 1 0
71 Shop 13.77 1 0
72 Shop 14.21 1 0
73 Shop 14.84 1 0
74 2BHK 55.74 29 26
75 Banquet Hall 523.91 1 0
76 Food Court 732.09 1 0
77 Play Area 318.71 1 0
78 Shop 9.23 1 1
79 Shop 10.67 1 0
80 Shop 11.27 1 1
81 Shop 11.92 1 1
82 Shop 11.96 1 1
83 Shop 20.01 1 0
84 Shop 20.30 2 0
85 Shop 15.04 2 0
86 Shop 15.30 1 0
87 Shop 19.68 1 1
88 Shop 19.84 2 1
89 Shop 19.91 1 0
90 Shop 17.86 1 0
91 Shop 17.89 2 0
92 Shop 17.91 2 0
93 Shop 24.48 1 1
94 1BHK 42.27 28 26
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 14
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 22
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 6
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 45.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 SUMER LIFE WING -B 30/06/2023 2 1 2 19 1 0 99
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 55.74 86 73
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 14
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 22
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 6
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 45.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 SUMER LIFE WING - C 30/06/2023 2 1 2 19 1 1 118
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 42.27 42 37
2 2BHK 55.74 16 10
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 14
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 22
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 6
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 45.2

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
S S Associates NA Architect
Rafique Abdulla Abbas Sayyed A51800010036 Real Estate Agent
SRIDHAR RAO JAITU A51800002765 Real Estate Agent
BHARAT VASANJI DEDHIA A51900001313 Real Estate Agent
ROYALMAX REALTORS AND PROPERTY MANAGEMENT A51900001428 Real Estate Agent
Sushanth Chandrakant Joijode A51900001783 Real Estate Agent
Fairdeal Realtors Pvt Ltd A51800000177 Real Estate Agent
Mumbai Skylines A51900004283 Real Estate Agent
A1Estate india A51900002802 Real Estate Agent
SHAM SADARANGANI A51900002051 Real Estate Agent
Jeffrey Caitano Vaz A51800004823 Real Estate Agent
B KANDHARI PROPERTIES LLP A51800003272 Real Estate Agent
Vipin Agarawal A51900008226 Real Estate Agent
LALITA NILESH JAIN A51900009577 Real Estate Agent
MANORAATH INFRASTRUCTURE LLP A51900009185 Real Estate Agent
PRAVEEN KUMAR S JAIN A51900009188 Real Estate Agent
KAMLA SUMERMAL JAIN A51900009503 Real Estate Agent
REKHA PRAVIN JAIN A51900009324 Real Estate Agent
Sahai Estates A51900001512 Real Estate Agent
RAMESH MOTILAL KANOJIYA A51700001660 Real Estate Agent
Govind Ramshiromani Gupta A51700001714 Real Estate Agent
CA Rupesh Gupta NA Chartered Accountant
JW Consultants LLP NA Engineer
Sumer Corporation NA Contractor

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
SUMER LIFE Bombay High Court 975 Civil No Writ Petition NA 2010 Pending
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement