MahaRERA Application

General Information

Other Than Individual

Organization

Neelkanth Mansions and Infrastructure Pvt. Ltd.
Company
NA
Do you have any Past Experience ?
Yes

Address Details

5th Floor
Fine House
Anandji Lane off MG Road
Ghatkopar(E)
Next to Bhaveshwar Market
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400077

Organization Contact Details

02221021080
www.neelkanthgroup.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Dhavalgiri- Neelkanth ViharResidentialNA12680.20Shahid Bhagat Kanwar Ram Marg Vidyavihar Mumbai 400077R-1/3, 503 E11642013-03-312015-01-14
2Neelkanth RoyaleResidentialNA5659.96Joshi Lane Ghatkopar E Mumbai 4000775412 to 54551432014-03-312015-01-30
3D2 Neelkanth GreensResidentialNA1621.58Neelkanth Greens Majiwada Thane318/1D PT11042013-09-302014-09-04

Member Information

Member Name Designation Photo
Mukesh Mohanbhai Patel Managing Director View Photo
Nilesh Kishor Desai Authorized Signatory View Photo

Project

D4 IRIS
On-Going Project
30/06/2017
30/09/2020
Yes
Residential
No
318/1D PT
S No 318-PT 312-PT Shree Satya Relators
S No 312 Neelkanth Woods after approved layout
S No 318-1D-2 Amenity Open Space
S No 312-1B 319-1B-2-40 Mtr DP Road after layout
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
Majiwada
Thane West
400610
1751.85
1
1
0
1281.82

FSI Details

8445.88
0
8445.88

Bank Details

HDFC BANK LTD
HDFC0000118

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 158 109 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Completed
Water Conservation, Rain water Harvesting : YES 100 Completed
Energy management : YES 100 Solar Water Heating system is provided
Fire Protection And Fire Safety Requirements : YES 100 Completed
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Completed
Aggregate area of recreational Open Space : YES 100 Completed
Open Parking : YES 100 Completed
Water Supply : YES 100 Completed
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 STP work is completed.
Storm Water Drains : YES 100 SWD work is completed.
Landscaping & Tree Planting : YES 100 Completed
Street Lighting : YES 100 Completed
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 Completed
Solid Waste Management And Disposal : YES 100 Completed

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 D4 IRIS IRIS 31/03/2020 0 1 2 30 1 22 158
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 64.58 50 43
2 3 BHK 91.96 54 33
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Man Infra Construction Ltd NA Contractor
Saakaar Architects NA Architect
Mahimtura Consultants Pvt ltd NA Engineer
SBR Consultant NA Other Professional
Engineering Creations Public Health Consultancy Pvt Ltd NA Other Professional
JONES LANG LASALLE RESIDENTIAL PRIVATE LIMITED A51900000108 Real Estate Agent
MAHAMAYA SPACES PVT LTD A51900002064 Real Estate Agent
Realtyezee Advisors LLP A51800008532 Real Estate Agent
Sameer Chandrakant Zujam A51700010791 Real Estate Agent
Ossie Luis A51700003918 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
AMIT KUMAR GUPTA A51700000728 Real Estate Agent
Dagadu Namdev Sabale A51700010774 Real Estate Agent
Siddharth Choudhary A51700005118 Real Estate Agent
SSPC A51700003207 Real Estate Agent
BLUE LOTUS A51700003670 Real Estate Agent
Shivam Chaudhary A51700014514 Real Estate Agent
Pyramid Homes A51700004003 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
D4 IRIS Bombay High Court 3201 of 2011 Civil Yes Writ Petition NA 2011 Writ Petition is admitted Interim Relief granted in favour of project Pending for Hearing

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Certificates of Architect (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement