Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1The Cliff GardenResidentialNA1418.66R2-1 Pune Maan HinjawadiPlot no R2-1 part22242022-12-312019-08-03

Member Information

Member Name Designation Photo
Prasanta Biswal Authorized Signatory View Photo
Dinesh Raste Authorized Signatory View Photo

Project

The Cliff Garden-Phase 2A
New Project
31/12/2025
No
Residential
No
R-2/1 and R-2/2
Remaining portion of plot R2-1
Remaining portion of plot R2-1
Remaining portion of plot R2-1
Remaining portion of plot R2-1
MAHARASHTRA
Pune
Pune
Mulshi
Man
Maan Pirangut Road
Maan, Hinjawadi
411057
2295.73
3
3
0
0

FSI Details

33312.58
0
33312.58

Bank Details

HDFC Bank LTD
HDFC0000060

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 233 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 10 Work in progress
Water Conservation, Rain water Harvesting : YES 0 Not started
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 Not started
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Not started
Underground water tanks and pumps : YES 20 Excavation 100% completed
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 Not started
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 10 Work in progress
Storm Water Drains : YES 10 Work in progress
Landscaping & Tree Planting : NO 0 NA
Street Lighting : YES 0 Not started
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 The Cliff Garden-Phase 2A Wing I 31/12/2025 0 1 0 21 1 94 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.59 80 74
2 2BHK 54.7 80 62
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 85
5 X number of Slabs of Super Structure 62
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 15
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 39.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 The Cliff Garden-Phase 2A Wing J 31/12/2025 0 1 0 21 1 82 118
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.91 120 0
2 2BHK 55.45 40 0
3 2BHK 55.37 40 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 85
5 X number of Slabs of Super Structure 62
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40.7
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 The Cliff Garden-Phase 2A Wing K 31/12/2025 0 1 0 21 1 151 49
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.91 80 80
2 STUDIO 36.91 40 40
3 2BHK 55.45 40 36
4 2BHK 55.37 40 35
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 90
5 X number of Slabs of Super Structure 66
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 41.6

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
V K : a Architecture NA Architect
JW Consultants LLP NA Engineer
UNiCORN M.E.P Consultants Pvt. Ltd. NA Engineer
M/s Dutta & Co NA Chartered Accountant
M/s Bose Consultant NA Engineer
TCG Urban Infrastructure Holdings Pvt. Ltd. A51800012287 Real Estate Agent
CLEAR SPACE REALTY A52100020029 Real Estate Agent
AMIT ARVIND SODANI A52100001140 Real Estate Agent
FULL BASKET PROPERTY SERVICES PRIVATE LIMITED A52100005036 Real Estate Agent
Aniket Ashokrao Mangalkar A50300043599 Real Estate Agent
KULVEER SINGH SETHI A52100040914 Real Estate Agent
AMIT KUMAR PAL A52100026342 Real Estate Agent
ARUN SITARAM KANSE A51700040376 Real Estate Agent
ANAND AJIT GUPTE A52100025185 Real Estate Agent
MAGICSTONE SPACES LLP A52100024317 Real Estate Agent
OMKAR KAILAS AGALE A52100025017 Real Estate Agent
BUY INDIA HOMES DIGITAL PRIVATE LIMITED A52100019166 Real Estate Agent
Kumar Naraindas Mirpuri A52100042702 Real Estate Agent
SHASHANKSHEKHAR RAKESHKUMAR SINGH A52100023802 Real Estate Agent
Nobroker Technologies Solutions Private Limited A51800026821 Real Estate Agent
SHIKHA JAYPRAKASH SINGH A52100028755 Real Estate Agent
PRIME ASSETS REALTY PRIVATE LIMITED A52100024992 Real Estate Agent
Ecoview Properties Private Limited A52100036807 Real Estate Agent
Pin Click Property Management Pvt Ltd. A52100012083 Real Estate Agent
NITISH KUMAR DAS A52100020306 Real Estate Agent
Meetu Kiran A52100021426 Real Estate Agent
RITESH RANJAN A52100043031 Real Estate Agent
Subham Ray A51700040092 Real Estate Agent
NEERAJ SANTOSH GIRI A52100014497 Real Estate Agent
PRASHANT VITTHAL AROTE A52100044050 Real Estate Agent
UMESH RAMESH PAWAR A52100000006 Real Estate Agent
Amar Kumar A52100042348 Real Estate Agent
RATTCON INFRATECH PRIVATE LIMITED A52100021582 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
13 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
12 Engineer’s Certificate on Cost Incurred on Project (Form 2)
13 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
2 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
5 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement