MahaRERA Application

General Information

Other Than Individual

Organization

Nanded City Development & Construction Co. Ltd.
Company
NA
Do you have any Past Experience ?
Yes

Address Details

5
Aditi Garden
Magarpatta City
Hadapsar
Next to Deccan Harvest Restaurant
MAHARASHTRA
Pune
Pune
Haveli
Hadapsar
411013

Organization Contact Details

02026342797
www.nandedcitypune.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Lalit at Nanded CityResidentialNA31600Nanded City Sinhagad Road Pune 411068S No 13 p 14 p67922015-04-302014-12-15
2Mangal Bhairav at Nanded CityResidentialNA54295Nanded City Sinhagad Road Pune 411068S No 12 p 13 p3816722015-12-312015-10-28
3Sarang at Nanded CityResidentialNA44310Nanded City Sinhagad Road Pune 411068S No 3 p 4 p1311442015-11-302015-10-07
4Madhuvanti at Nanded CityResidentialNA39960Nanded City Sinhagad Road Pune 411068S No 3 p 4 p2310122016-08-312016-03-03
5Asawari at Nanded CityResidentialNA61872Nanded City Sinhagad Road Pune 411068S No 2 p 3 p 4 p 5 p1119362015-10-312015-08-21
6Shubhkalyan at Nanded CityResidentialNA29800Nanded City Sinhagad Road Pune 411068S no 2 p45282015-09-302015-03-26
7Destination Center I at Nanded CityCommercialNA18568Nanded City Sinhagad Road Pune 411068S No 7 p12722015-04-302015-03-30
8Sargam at Nanded CityResidentialNA51262Nanded City Sinhagad Road Pune 411068S No 13 pt 14 pt 15 pt 16 pt 17 pt717362019-03-312018-07-23
9Pancham Phase I at Nanded CityResidentialNA20162.55Nanded City Sinhagad Road Pune 411068S No 10 pt 11 pt 12 pt 79 pt24962019-10-312019-04-30
10Pancham Phase II at Nanded CityResidentialNA10847.45Nanded City Sinhagad Road Pune 411068S No 10 pt 11 pt 12 pt 79 pt24962021-04-302021-01-28
11Janaranjani 5A at Nanded CityResidentialNA16157.14Nanded City Sinhagad Road Pune 411068S No 11 pt 12 pt 79 pt95402019-08-312019-08-29
12Janaranjani 5B at Nanded CityResidentialNA16603.84Nanded City Sinhagad Road Pune 411068S No 10 pt 11 pt 79 pt95402020-11-302020-06-10

Member Information

Member Name Designation Photo
Satish Dattatray Magar Managing Director View Photo
Umesh Dattatray Magar Authorized Signatory View Photo
Ishaan Umesh Magar Authorized Signatory View Photo

Project

Sur at Nanded City
New Project
31/08/2025
No
Residential
No
S No 18 1 2 3 4 10A 10B 11 12 19 1 19 2 21 2A 1
NRD 25
Nala
U 16 U10
30 M Road
MAHARASHTRA
Pune
Pune
Haveli
Nanded
Sinhagad Road
Nanded Phata
411068
36575
7
7
0
3660

FSI Details

62405.17
0
62405.17

Bank Details

Tamilnad Mercantile Bank Ltd
TMBL0000151

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 1002 0 6

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 -
Water Conservation, Rain water Harvesting : YES 0 -
Energy management : YES 0 -
Fire Protection And Fire Safety Requirements : YES 0 -
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 -
Fitness Center : YES 0 -
Tot Lot : YES 0 -
Town Level 24x7 Centralized Security System with CCTV Coverage : YES 100 -
Town Level Community Healthcare Facility : YES 0 Proposed 100 bed multi-specialty hospital
Town Level Community Market : YES 100 Operational with Restaurants
Town Level Exclusive Fire Fighting Station : YES 100 Fire Station Operational
Town Level Gardens and Parks : YES 100 -
Town Level playgrounds excluding school playgrounds : YES 0 -
Town Level Primary and High Schools ICSE and CBSE Board : YES 100 -
Town Level Public Assembly facilities like Amphitheatre : YES 100 -
Town Level restricted Facilities like swimming pool tennis courts Gymnasium Skating rink Badminton C : YES 100 -
Town level Roads Jogging Cycling Tracks Footpaths as per Proposed Land Use Plan : YES 86 -
Aggregate area of recreational Open Space : YES 0 -
Open Parking : YES 0 -
Water Supply : YES 100 -
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 50 -
Storm Water Drains : YES 50 -
Landscaping & Tree Planting : YES 10 -
Street Lighting : YES 0 -
Community Buildings : YES 0 -
Treatment And Disposal Of Sewage And Sullage Water : YES 0 -
Solid Waste Management And Disposal : YES 0 -

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Sur at Nanded City A 31/08/2025 0 1 2 21 1 0 152
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 103.56 76 76
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 64.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Sur at Nanded City B 31/08/2025 0 1 2 21 1 0 152
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 103.56 76 76
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 64.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Sur at Nanded City C 31/08/2025 0 1 2 21 1 0 152
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 70.32 152 152
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 63
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Sur at Nanded City D 31/08/2025 0 1 2 21 1 0 76
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 77.03 76 76
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

20
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 62.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 Sur at Nanded City E 31/08/2025 0 1 2 21 1 0 152
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 85.27 76 76
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

30
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 65
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 Sur at Nanded City F 31/08/2025 0 1 2 21 1 0 152
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 85.27 76 76
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 63.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 Sur at Nanded City G 31/08/2025 0 1 2 21 1 0 152
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 85.27 76 76
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 63.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Arch Prakash Deshmukh NA Architect
Arch Malay Deshmukh NA Architect
Mr Achyut Watve NA Engineer
Mr Ravi Gavandi NA Other Professional
Mrs Varsha Gavandi NA Other Professional
Mr Ketan Dantale NA Other Professional
SDB & Company NA Chartered Accountant
D R Barve & Company NA Chartered Accountant
UDAY JAYSINGRAO CHAVAN A52100014340 Real Estate Agent
MAYUR PRABHAKAR PATIL A52100029371 Real Estate Agent
Pankaj Parmanand Sarnaik A52100034701 Real Estate Agent
ANIRUDDH HANMANT KADAM A52100016401 Real Estate Agent
YOOPROP CONSULTING PRIVATE LIMITED A52100033033 Real Estate Agent
Madhukar Bhagwanrao Mangnale A52100012205 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
SANJAY HARIDAS KHANDARE A52100024307 Real Estate Agent
SHIVAJI BALWANT SHINDE A52100016572 Real Estate Agent
UMESH SAMBHAJI BHOSALE A52100007248 Real Estate Agent
Vikram Jayantilal Bhanushali A52100024625 Real Estate Agent
Virendrasingh Ravindra Deshmukh A52100019154 Real Estate Agent
Praful Ankush Dhaygave A52100015090 Real Estate Agent
Rohan Shivaji Shinde A52100036407 Real Estate Agent
SHAHAJI APPARAO SARWADE A52100033496 Real Estate Agent
Bhimashankar Ravindra Kanade A52100024018 Real Estate Agent
JYOTI SUJIT KARLE A52100037486 Real Estate Agent
SUJAY SARJERAO PATOLE A52100028811 Real Estate Agent
PANDURANG NAGNATH GHODAKE A52100036411 Real Estate Agent
Lalitkumar Chhaganlal Jain A52100001922 Real Estate Agent
Jyoti Suresh Gaikwad A52100032892 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
9 Building Plan Approval / NA Order for plotted development
10 Building Plan Approval / NA Order for plotted development
11 Building Plan Approval / NA Order for plotted development
12 Building Plan Approval / NA Order for plotted development
13 Building Plan Approval / NA Order for plotted development
14 Building Plan Approval / NA Order for plotted development
15 Building Plan Approval / NA Order for plotted development
16 Building Plan Approval / NA Order for plotted development
17 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement