MahaRERA Application

General Information

Other Than Individual

Organization

Kohinoor Dreams Associates
Others
AOP
Do you have any Past Experience ?
Yes

Address Details

1-13 14 15
Poornima Towers
Shankarsheth Road
Swargate
Near Seven Loves Chowk
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411042

Organization Contact Details

18002331800

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Dreams Ayana P4 P5 P6 Q2 R1 R2 CH2ResidentialNA34300Gat No 13 Village Sate Taluka Mawal Dist Pune1371052015-10-312017-04-06

Other Organization Type Member Information

Name Member Type
Subhash Devichand Agarwal ( Bansal) Individual
Dreams Construction (Pune) Pvt. Ltd. Company
Kohinoor Development Corporation Partnership

Project

Dreams Ayana P1 P2 P3 Q1 wings
On-Going Project
06/05/2016
31/07/2019
Yes
Residential
No
13
Proposed ph 2
G No 682
Wing P 4 Open Space 02
G No 682
MAHARASHTRA
Pune
Pune
Mawal
Sate
PUNE
MAWAL
412106
3568
4
4
0
3386.39

FSI Details

3339.28
0
3339.28

Bank Details

Axis Bank Ltd
UTIB0000037

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 50 11 97

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 40 Internal roads/driveway provided foothpath not pro
Water Conservation, Rain water Harvesting : YES 33 Common Recharge well Provided
Energy management : YES 33 Solar Hot water system provided
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 10 Common transformers to be provided.
Aggregate area of recreational Open Space : YES 100 Provided common with other wings
Open Parking : YES 33 Provided in side margin
Water Supply : YES 33 Grampanachyat + Well+tankers
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 33 Grampanchayat drain NOT available. ComSTP provided
Storm Water Drains : YES 33 Provided common with other wings
Landscaping & Tree Planting : YES 50 Common provided
Street Lighting : YES 33 Common provided
Community Buildings : YES 100 Common Club House provided
Treatment And Disposal Of Sewage And Sullage Water : YES 60 Provided common with other wings
Solid Waste Management And Disposal : YES 33 Common Vermiculture Pits provided

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Dreams Ayana P1 P2 P3 Q1 wings P1 31/07/2019 0 1 0 5 1 0 11
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 36.51 8 0
2 1 BHK 36.98 4 0
3 2 BHK compact 44.59 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Dreams Ayana P1 P2 P3 Q1 wings P2 31/07/2019 0 1 0 5 1 6 11
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 36.51 8 0
2 1 BHK 36.98 4 0
3 2 BHK Compact 44.59 4 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Dreams Ayana P1 P2 P3 Q1 wings P3 31/07/2019 0 1 0 5 1 6 11
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK compact 44.59 4 3
2 1 BHK 36.98 4 3
3 1 BHK 36.51 8 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Dreams Ayana P1 P2 P3 Q1 wings Q1 31/07/2019 0 1 0 5 1 10 17
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 36.98 24 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
HDFC Realty Limited A51900000107 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
Makaan Hunt Pvt Ltd A52100000430 Real Estate Agent
Yogita Sharma A52100001719 Real Estate Agent
Property Pointer Private Limited A52100000787 Real Estate Agent
Subhash Developers NA Contractor
Ar Shripad Padhye NA Architect
Cicom Consultants NA Engineer
MEP System Solutions Pvt Ltd NA Other Professional
AMOL GIRI A52100003882 Real Estate Agent
JOB DANIEL JADHAV a52100000883 Real Estate Agent
DHANAJI UTTAM PAWAR A52100008657 Real Estate Agent
PRASHANT ANKUSH INDREKAR A52100005143 Real Estate Agent
pavitra hitendra wasnik A50500005029 Real Estate Agent
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
Pooja Saxena A52100003130 Real Estate Agent
SHRAVAN JAGANATH NAIDU A52100001164 Real Estate Agent
PRANOO REALTY A52100000324 Real Estate Agent
SUGGESTED PROPERTY PRIVATE LIMITED A52100000184 Real Estate Agent
Romil Sihare A52100003420 Real Estate Agent
WISTERIA REAL VISION PVT LTD A52100003089 Real Estate Agent
VASANT HARJI DAMA A52100000350 Real Estate Agent
subodh shukla A52100006838 Real Estate Agent
Rakshak Infrastructure(I) Pvt Ltd A52100006714 Real Estate Agent
Abhijeet Laxman Pardeshi A52100005879 Real Estate Agent
Shrradhaa Daven Kakkad A52100000830 Real Estate Agent
RAHUL PRAKASH JADHAV A52100005376 Real Estate Agent
PROPHOUSE CONSULTING SERVICES PVT.LTD. A52100008652 Real Estate Agent
Aarti Bhuwan Sharma A51700001509 Real Estate Agent
Deepak Vishan Sundrani A52100002438 Real Estate Agent
Urban Link Consulting Private Limited A52100001054 Real Estate Agent
VEDIC REALTORS A52100003893 Real Estate Agent
NATASHA NITIN MAHINDRAKAR A52100002582 Real Estate Agent
NITIN SURENDRA MAHINDRAKAR A52100001925 Real Estate Agent
ROCK REALTY A52100001828 Real Estate Agent
SHIVDAS BHASKAR MORE A52100002059 Real Estate Agent
vinod inderlal jessani A52100002287 Real Estate Agent
MANISHA ASHOK KURHADE A52100004533 Real Estate Agent
SANTOSH VASANT PATIL A52100008409 Real Estate Agent
Nesting Dreams Private Limited A52100012998 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Dreams Ayana P1 P2 P3 Q1 wings Civil judge Jr Div Vadgaon Maval 565 Civil Yes Suit NA 2012 Say on Exhibit

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement