MahaRERA Application

General Information

Other Than Individual

Organization

KOLTE-PATIL DEVELOPERS LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2ND FLOOR
CITY POINT
DHOLE PATIL ROAD
PUNE
17 BOAT CLUB ROAD
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411001

Organization Contact Details

02066226500

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1GlitteratiOthersResidential and Commercial55463Pimple Nilakh Pune - 41101414 Part61872016-04-302016-04-13
2City BayCommercialNA11636.22Dhole-Patil road Pune-411001FP no 1881272014-04-302014-04-30

Member Information

Member Name Designation Photo
VINAYAK JOGDEO Authorized Signatory View Photo
Milind Digambar Kolte Authorized Signatory View Photo

Project

VERVE
New Project
31/07/2025
No
Others
Yes
CTS 1016 of Village Pahadi, Goregaon
37m wide link Road
18m DP Road
9m wide Road
27m Wide DP Road
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Link Road
Bangur Nagar, Village Pahadi, Goregaon (West)
400104
9420.53
8
4
4
1675.58

FSI Details

29416
212
29628.00

Bank Details

Axis Bank Limited
UTIB0000230

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
VERVE Hari Ratan Co-Op Housing Society Limited Societies Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 527 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 60 Internal Roads in Tremix & Paver Blocks tiles
Water Conservation, Rain water Harvesting : YES 75 as per design & drawing of consultant
Energy management : YES 50 as per design & drawing of consultant
Fire Protection And Fire Safety Requirements : YES 80 as per provisional Fire NOC received from Fire Dep
Electrical Meter Room, Sub-Station, Receiving Station : YES 70 as per design & drawing of consultant
Fitness Centre : YES 40 as per design & drawing of consultant
Aggregate area of recreational Open Space : YES 0 as per design & drawing of consultant
Open Parking : YES 0 21 nos
Water Supply : YES 60 preconstruction tanker and post by MCGM
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 as per design & drawing of consultant
Storm Water Drains : YES 90 as per design & drawing of consultant
Landscaping & Tree Planting : YES 15 as per design & drawing of consultant
Street Lighting : YES 10 as per design & drawing of consultant
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 60 as per design & drawing of consultant
Solid Waste Management And Disposal : YES 60 as per design & drawing of consultant

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 VERVE Wing A - Ground to 15th Floor 31/07/2024 0 1 4 20 1 0 86
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Ground Floor Shop 1 111.74 1 1
2 Ground Floor Shop 2 68.62 1 1
3 Ground Floor Shop 3 66.58 1 1
4 2BHK 66.16 14 14
5 2BHK 66.63 14 14
6 2BHK 70.52 15 15
7 3BHK 95.12 15 15
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 84
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 VERVE Wing A -16th Floor 31/07/2024 0 0 0 0 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 70.52 1 1
2 2BHK 66.16 1 1
3 2BHK 66.63 1 1
4 3BHK 95.12 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 49
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 VERVE Wing B - Ground to 14th floor 31/07/2024 0 1 4 19 1 0 96
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Ground Floor Shop 7 111.74 1 1
2 Ground Floor Shop 4 78.65 1 1
3 Ground Floor Shop 5 66.64 1 1
4 Ground Floor Shop 6 68.47 1 1
5 2BHK 70.47 14 14
6 3BHK 95.05 14 14
7 3BHK 95.08 14 14
8 2BHK 70.55 13 13
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 84
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 VERVE Wing B - 15th and 16th Floor 31/07/2024 0 0 0 2 0 2 10
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 95.05 2 2
2 3BHK 95.08 2 2
3 2BHK 70.47 2 2
4 2BHK 70.55 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 49
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 VERVE Wing C - Ground to 23rd Floor 31/01/2025 0 1 4 28 1 0 135
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 95.93 20 19
2 3BHK 95.97 22 22
3 2BHK 70.52 23 19
4 2BHK 70.54 22 22
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 15
11 Overall Percentage of Completion of the work done For the entire Building /Wing 59.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 VERVE Wing C - 24 to 27 Floor 31/01/2025 0 0 0 4 0 8 32
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 70.52 3 1
2 2BHK 70.54 4 3
3 3BHK 95.97 4 3
4 3BHK 95.93 3 3
5 3BHK 111.06 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

20
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 22
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 VERVE Wing D - Ground to 22nd Floor 31/01/2025 0 1 4 27 1 0 129
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 95.97 19 18
2 2BHK 66.20 18 18
3 2BHK 70.54 3 3
4 3BHK 95.96 21 21
5 2BHK 70.47 22 22
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 15
11 Overall Percentage of Completion of the work done For the entire Building /Wing 58.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
8 VERVE Wing D - 23rd to 27th Floor 31/01/2025 0 0 0 5 0 9 36
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 111.06 1 1
2 2BHK 70.47 4 4
3 2BHK 70.54 5 2
4 3BHK 95.96 5 5
5 3BHK 95.97 4 4
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

20
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 22.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Reza Kabul NA Architect
CA Nikita Bajaj NA Chartered Accountant
Umang Shah NA Engineer
JW Consultants LLP NA Other Professional
Anand Kumar Virendra Tiwari A51700001718 Real Estate Agent
KISHOR SADASHIV GOLAM A51800013346 Real Estate Agent
KISHORE JAIPRAKASH VYAS A51700008031 Real Estate Agent
GANGA SANTOSH LADE A51800015759 Real Estate Agent
AKHILESH KUMAR SHIVKUMAR PANDEY A51800007918 Real Estate Agent
KESHAV MARUTI KIRATKAR A51700013354 Real Estate Agent
KHEMRAJ SHANKAR BHOGATE A51900019030 Real Estate Agent
Deepak Mohanlal Nagwani A51900000182 Real Estate Agent
MINERVA PROPERTIES A51800010405 Real Estate Agent
Mohit Rajendra Maheshwari A51700024815 Real Estate Agent
ROSHAN GUPTA A51800000756 Real Estate Agent
PROPERTY PILLER A52000010191 Real Estate Agent
Deepak Arora A51800015755 Real Estate Agent
Mohd Sohail Ansari A51800010711 Real Estate Agent
Sunil Kapoor A51900006701 Real Estate Agent
Vinay Kumar Thakur A51800013239 Real Estate Agent
Shailendar Singh Bailwal A51900007971 Real Estate Agent
Niru Dinesh Tanwar A51700016361 Real Estate Agent
Amit G Pandya A51800014281 Real Estate Agent
MOHIT DEVI PRASAD A51700018536 Real Estate Agent
AVS LIFESTYLES PVT. LTD A51800003363 Real Estate Agent
Bipin Gandhi A51800009933 Real Estate Agent
CBRE South Asia Private Limited A51600003050 Real Estate Agent
VIMLESH MAHENDRA YADAV A51800023092 Real Estate Agent
JM Financial Products Limited A51900000277 Real Estate Agent
Bijendra Ramnarayan Singh A51800002252 Real Estate Agent
Shailesh Shekhar Kotian A51800015393 Real Estate Agent
RAMJAGAN BABUNANDAN MORYA A51800009875 Real Estate Agent
TANMOY BARUA A51800003450 Real Estate Agent
GAURAV GOKHRU A51800018328 Real Estate Agent
Dimple Nilesh Thakkar A51800002748 Real Estate Agent
TOFIK IMDAD BHANGE A51800025559 Real Estate Agent
Simon Tuscano A51800009266 Real Estate Agent
Vijayendra Ramakant Pimpale A51800024982 Real Estate Agent
JATIN HARKISHAN KAWA A51800005836 Real Estate Agent
VINAY VINOD BHATTE A51800005875 Real Estate Agent
SURESH SHAMLAL YADAV A51800014955 Real Estate Agent
AMIT SURENDRA SINGH A51700004191 Real Estate Agent
JIGAR JAYANTILAL SHAH A51800000376 Real Estate Agent
Ravindra Sitaram Dhole A51800009562 Real Estate Agent
Abhijeet Shreedhar Dubey A51700009978 Real Estate Agent
Vivekanand Indradev Kushwaha A51800007213 Real Estate Agent
SYLVESTER MARCEL M MORAS A51800005216 Real Estate Agent
Gyanchand Baid A51800003422 Real Estate Agent
SUNIL HASHUMAL NARWANI A51800010465 Real Estate Agent
Khanna Estate Agency A51800000788 Real Estate Agent
PREETI SHARMA A51700017999 Real Estate Agent
HARESH KHEMRAJ MEHRA A51900000945 Real Estate Agent
Shree Ganesh Estate Consultancy A51800007866 Real Estate Agent
OMKAR RAMAKANT TOMPE A51800000713 Real Estate Agent
Kapil Dewan Harwani A51800015302 Real Estate Agent
Rahul Bramhdev Singh A51800011778 Real Estate Agent
SHAILESH SHANTARAM KAMBLE A51900010025 Real Estate Agent
SCOOT CONSULTANCY A51800023190 Real Estate Agent
PRATIK NAVNIT KANANI A51800025300 Real Estate Agent
Tirupati Estate Consultants A51800005310 Real Estate Agent
Salim Merchant A51800011801 Real Estate Agent
SHRINIVAS VENKATY KUDUDALA A51800004046 Real Estate Agent
Anil Devnarayan Agarwal A51800000513 Real Estate Agent
GRD REALTY PVT LTD A51900002118 Real Estate Agent
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
Jay Jagdish Parmar A51800020422 Real Estate Agent
ZAHIR ANWAR KHAN A99000021988 Real Estate Agent
Rajkumar Ganesh Yadav A51800024220 Real Estate Agent
SUNIL KUMAR NELSON A51700006281 Real Estate Agent
SAURAV VARMA A51800012243 Real Estate Agent
SAYLA ESTATE AGENCY A51800000178 Real Estate Agent
Almas Shaikh A51900024713 Real Estate Agent
Rukhsana Tajuddin Shaikh A51800021497 Real Estate Agent
Talati Property Consultant A51900004618 Real Estate Agent
VAIBHAV PROPERTY HUB A51800012653 Real Estate Agent
Rahul B Tiwari A51800005363 Real Estate Agent
Abrar Abdul Razak Dhanani A51900006731 Real Estate Agent
Blue Haven Estate Agents A51800009684 Real Estate Agent
QUICK HOMES PROPERTY ADVISORY A51800005188 Real Estate Agent
Quikr Realty Limited A51900000107 Real Estate Agent
ASIF HUSSAIN SHAIKH A51800016301 Real Estate Agent
SAMIR DHONDIRAM PAWAR A51800025794 Real Estate Agent
ABHISHEK JAIN A51800020728 Real Estate Agent
MEHUL M SAYANI A51800021311 Real Estate Agent
Fuaad Siddik Godil A51800007355 Real Estate Agent
RAJIV KHARAKCHAND GARODIA A51800000479 Real Estate Agent
HASMUKH DEVASIBHAI KARIA A51900008379 Real Estate Agent
DINESH HARVINDER MALHOTRA A51800006250 Real Estate Agent
Manisha Lifespaces Consulting Pvt. Ltd. A51800008040 Real Estate Agent
Mystic India Realtors LLP A51900006152 Real Estate Agent
NANDKISHORE YADAV A51800024519 Real Estate Agent
PARAMLEELA SOLUTIONS PRIVATE LIMITED A51800012969 Real Estate Agent
Sagar Suresh Pishori A51800000472 Real Estate Agent
Vikas Vinod Todi A51700023777 Real Estate Agent
HARSADRAY MOHANALAL SOLANKI A51800006861 Real Estate Agent
JYOTI SANDEEP SHINDE A51800013823 Real Estate Agent
Dinesh Manraj Mehta A51800023234 Real Estate Agent
Sai Darshan Real Estate Consultant A51800005785 Real Estate Agent
SAINATH ESTATE A51800012047 Real Estate Agent
Rishikesh Rajendraprasad Upadhyay A51800016821 Real Estate Agent
Shivanand Pujari A51800021542 Real Estate Agent
RD BROTHERS PROPERTY CONSULTANT LLP A51800025192 Real Estate Agent
SACHIN DATTA RATHOD A51800023352 Real Estate Agent
DILIP SINGH BHATI A51800018488 Real Estate Agent
Foxmen Retail And Realty LLP A51800003824 Real Estate Agent
SANJAY LALTA YADAV A51900001032 Real Estate Agent
SUNITA SHARMA A51700019755 Real Estate Agent
daulat adnani A51800000347 Real Estate Agent
CHANGOD CONSULTANCY SERVICES A51800006605 Real Estate Agent
Rajesh Laxman Harwani A51800002356 Real Estate Agent
INVEST IN REALITY LLP A51800003095 Real Estate Agent
Levis Antonio Desa A51800005731 Real Estate Agent
RAHUL SANJAY SHARMA A51800024403 Real Estate Agent
MAA REALTY A51800010766 Real Estate Agent
Hitesh Ramesh Chauhan A51800005871 Real Estate Agent
MEHUL ANIL SUCHAK A51800007796 Real Estate Agent
YAMAN CHATWAL A51800003379 Real Estate Agent
Rahul Shahshikant Patel A51900001622 Real Estate Agent
Mukesh Dhansukhlal Shah A51800002809 Real Estate Agent
JONES LANG LASALLE PROPERTY CONSULTANTS (INDIA) PRIVATE LIMITED A51900000251 Real Estate Agent
METRO PROPERTIES A51800000740 Real Estate Agent
Mumbai Property Exchange Pvt Ltd A51900000211 Real Estate Agent
SEJAL CHIRAG DHOLAKIA A51800003154 Real Estate Agent
PRALHAD KUMAR NAGENDRA SHARMA A51800016416 Real Estate Agent
SACHIN DEVRAOJI METANGALE A99000001605 Real Estate Agent
Neeraj Gorwani A51800024795 Real Estate Agent
SUNNY RAMESH PUNJABI A51800000191 Real Estate Agent
Govind Ramshiromani Gupta A51700001714 Real Estate Agent
MOHD TOFIK CHOPDAR A51700021888 Real Estate Agent
ASHISH MADHUKAR RUMDE A51800000821 Real Estate Agent
SOUL SPACES PROPERTY SOLUTION PVT LTD A51800006266 Real Estate Agent
mohd kalam A51900010562 Real Estate Agent
Ameya Suhas Bapat A51800006105 Real Estate Agent
NITA SUNIL KOTHARI A51800009502 Real Estate Agent
AMAR DILIP PATIL A51800017823 Real Estate Agent
Alok Shashikant Anchan A51800005784 Real Estate Agent
UNIQ CONSULTANCY A51800004479 Real Estate Agent
VIJAY NILKANTHRAO BHORKAR A51800001270 Real Estate Agent
BHUMISH CHHEDA A51800002023 Real Estate Agent
RD BROTHERS PROPERTY CONSULTANT LLP A51800025192 Real Estate Agent
Nynex Realty Venture Pvt Ltd A51800027277 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
PROPANCHOR A51800020492 Real Estate Agent
CRAFT FINANCIAL ADVISORS PVT LTD A51900000136 Real Estate Agent
Home Bazaar Services Pvt Ltd A52000000045 Real Estate Agent
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
Property Cloud Reality Specifier Pvt Ltd A51900021978 Real Estate Agent
SMC REAL ESTATE ADVISORS PRIVATE LIMITED A51900000042 Real Estate Agent
Property Junction Realtors Private Limited A51800014505 Real Estate Agent
VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
1 CERSAI details
2 CERSAI details
3 CERSAI details
4 CERSAI details
5 CERSAI details
6 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
5 Proforma of Allotment letter
6 Proforma of Allotment letter
7 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement