MahaRERA Application

General Information

Other Than Individual

Organization

NANDIVARDHAN REALTORS LIMITED
Company
NA
Do you have any Past Experience ?
No

Address Details

201
OASIS SILVERSTONE BUILDING
RAM MARUTI ROAD
NAUPADA
NEAR GAJANAN MAHARAJ TEMPLE
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400602

Organization Contact Details

02261398811

Past Experience Details

Member Information

Member Name Designation Photo
ANIL NAGRAJ MUTHA Managing Director View Photo
NAGRAJ TOLAJI MUTHA Managing Director View Photo
YASH RITESH MUTHA Authorized Signatory View Photo

Project

AVISHA
On-Going Project
30/09/2019
30/12/2020
Yes
Others
No
CS NO 332 333
MUGBHAT CROSS LANE
PLOT BEARING CS NO 322
PLOT BEARING CS NO 331
PLOT BEARING CS NO 334
MAHARASHTRA
Konkan
Mumbai City
Ward ABCD
ABCD-400002
MUGBHAT CROSS LANE
GIRGAON
400002
712.38
1
1
0
0

FSI Details

5015.2
6.00
5021.20

Bank Details

KOTAK MAHINDRA BANK
KKBK0000655

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 3 0 00
Covered Parking ( In Numbers) 44 23 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 90 ON GOING
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 75 SPRINKLER WORK COMPLETED UPTO 2 FLOORS
Electrical Meter Room, Sub-Station, Receiving Station : YES 29 METER ROOM CIVIL WORK DONE
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 AFTER COMPLETION OF BUILDING WORK
Water Supply : YES 100 AFTER COMPLETION OF BUILDING WORK
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 ON GOING
Storm Water Drains : YES 30 ON GOING
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 AVISHA AVISHA 30/06/2020 0 1 0 24 0 3 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 I RK 22.92 1 1
2 1 BHK 38.93 4 4
3 2 BHK 58.47 27 26
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 60
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 2
11 Overall Percentage of Completion of the work done For the entire Building /Wing 68.7

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
MS STUDIO CHANGANI NA Architect

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
AVISHA Bombay City Civil Court Bombay Suit no 2669 of 2018 Civil No Suit NA 2018 Service of Summons
NA
AVISHA SMALL CAUSE COURT MUMBAI LEC SUIT NO 262/2013 Civil No Suit NA 2013 PENDING FOR STEPS
NA
AVISHA SMALL CAUSE COURT MUMBAI RAD SUIT NO 1170/2013 Civil No Suit NA 2013 FOR FILING WRITTEN STATEMENT
NA
AVISHA SMALL CAUSE COURT MUMBAI RAD SUIT NO 402/2018 Civil No Suit NA 2018 PENDING FOR STEPS
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
4 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement