Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
1 |
TEN BKC
|
Wing 1
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
55 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W1 X01 4BHK T1 |
152 |
2 |
0 |
2 |
W1 X02 6BHK DUP T1 |
328.47 |
1 |
0 |
3 |
W1 X02 4BHK T4 |
208.04 |
7 |
3 |
4 |
W1 X01 3BHK T3 |
132.76 |
1 |
0 |
5 |
W1 X01 3BHK T2 |
132.61 |
4 |
0 |
6 |
W1 X01 3BHK T1 |
132.42 |
6 |
0 |
7 |
W1 X02 4BHK T3 |
207.98 |
1 |
1 |
8 |
W1 X02 4BHK T2 |
207.91 |
10 |
3 |
9 |
W1 X02 4BHK T5 |
340.97 |
1 |
0 |
10 |
W1 X01 3BHK T5 |
132.82 |
4 |
0 |
11 |
W1 X01 3 BHK T4 |
132.77 |
5 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
65
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
45
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
53.8
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
2 |
TEN BKC
|
WING 2
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
50 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W2 X02 3BHK T1 |
111.78 |
12 |
0 |
2 |
W2 X02 5BHK DUP T1 |
192.39 |
1 |
0 |
3 |
W2 X02 3BHK T2 |
111.87 |
4 |
3 |
4 |
W2 X01 3 BHK DUP T1 |
435.58 |
1 |
1 |
5 |
W2 X01 3BHK T7 |
112.2 |
2 |
1 |
6 |
W2 X01 3BHK T6 |
112.14 |
5 |
2 |
7 |
W2 X01 3BHK T5 |
112.08 |
6 |
0 |
8 |
W2 X01 3BHK T3 |
111.93 |
5 |
0 |
9 |
W2 X02 3BHK T4 |
111.97 |
2 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
58
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
45
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
53.1
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
3 |
TEN BKC
|
WING 3
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
79 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W3 X01 3BHK T3 |
109.19 |
4 |
3 |
2 |
W3 X03 3BHK T6 |
133.05 |
3 |
0 |
3 |
W3 X03 3BHK T7 |
133.07 |
1 |
0 |
4 |
W3 X03 3BHK T4 |
132.95 |
5 |
0 |
5 |
W3 X03 3BHK T5 |
132.99 |
10 |
4 |
6 |
W3 X02 5BHK DUP T1 |
342.67 |
4 |
3 |
7 |
W3 X03 4 BHK DUP T1 |
173.77 |
1 |
1 |
8 |
W3 X01 3BHK T2 |
109.11 |
6 |
4 |
9 |
W3 X01 3BHK T1 |
109.03 |
12 |
2 |
10 |
W3 X02 4BHK T2 |
194.46 |
1 |
1 |
11 |
W3 X02 4BHK T3 |
215.2 |
1 |
1 |
12 |
W3 X02 4BHK T1 |
193.25 |
12 |
7 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
43
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
38
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
50.9
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
4 |
TEN BKC
|
WING 4
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
55 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W4 X02 3BHK T5 |
134.14 |
5 |
0 |
2 |
W4 X02 3BHK T7 |
139.41 |
1 |
0 |
3 |
W4 X02 3BHK T4 |
134.02 |
11 |
5 |
4 |
W4 X02 4BHK T1 |
164.09 |
1 |
1 |
5 |
W4 X01 3BHK T3 |
131.58 |
4 |
1 |
6 |
W4 X01 3BHK T2 |
131.53 |
5 |
0 |
7 |
W4 X01 3BHK T1 |
131.47 |
11 |
6 |
8 |
W4 X02 3BHK T6 |
134.25 |
4 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
56
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
38
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
52.2
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
5 |
TEN BKC
|
WING 5
|
05/06/2024
|
5
|
1
|
0
|
29
|
0 |
0 |
30 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W5 X01 2BHK T2 |
83.27 |
15 |
15 |
2 |
W5 X01 4BHK DUP T1 |
368.78 |
1 |
1 |
3 |
W5 X01 4 BHK T2 |
213.71 |
1 |
1 |
4 |
W5 X01 4 BHK T1 |
208.25 |
1 |
1 |
5 |
W5 X01 TRIPLEX 5 BHK |
563.73 |
1 |
1 |
6 |
W5 X01 2BHK T3 |
83.46 |
1 |
1 |
7 |
W5 X01 2 BHK T1 |
76.6 |
3 |
3 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
95
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
50
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
94
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
81
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
72
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
6 |
TEN BKC
|
WING 6
|
05/06/2024
|
5
|
1
|
0
|
29
|
0 |
0 |
30 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W6 X02 4BHK T3 |
155.02 |
6 |
6 |
2 |
W6 X02 3BHK T4 |
121.34 |
1 |
0 |
3 |
W6 X02 4BHK T2 |
154.82 |
7 |
7 |
4 |
W6 X02 3BHK T2 |
108.42 |
1 |
1 |
5 |
W6 X02 3BHK T1 |
108.33 |
1 |
1 |
6 |
W6 X02 3BHK T3 |
108.51 |
1 |
1 |
7 |
W6 X02 4BHK T1 |
154.66 |
5 |
4 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
95
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
40
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
88
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
81
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
70.4
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
7 |
TEN BKC
|
WING 7
|
05/06/2024
|
5
|
1
|
0
|
29
|
0 |
0 |
76 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W7 X03 3BHK T12 |
136.49 |
2 |
2 |
2 |
W7 X03 3BHK T2 |
124.69 |
8 |
6 |
3 |
W7 X03 3BHK T11 |
136.21 |
1 |
1 |
4 |
W7 X02 4BHK T5 |
196.51 |
3 |
3 |
5 |
W7 X02 4BHK T4 |
196.35 |
1 |
1 |
6 |
W7 X02 4BHK T3 |
196.26 |
5 |
5 |
7 |
W7 X02 4BHK T2 |
196.16 |
4 |
3 |
8 |
W7 X03 3BHK T5 |
129.04 |
1 |
0 |
9 |
W7 X03 4 BHK T6 |
196.55 |
3 |
3 |
10 |
W7 X02 4BHK T1 |
191.19 |
1 |
1 |
11 |
W7 X03 3BHK T1 |
124.5 |
4 |
3 |
12 |
W7 X04 3BHK T9 |
134.05 |
1 |
1 |
13 |
W7 X04 3BHK T10 |
134.09 |
1 |
1 |
14 |
W7 X04 3BHK T8 |
134.01 |
2 |
2 |
15 |
W7X04 3 BHK T7 |
133.79 |
6 |
6 |
16 |
W7 X04 3BHK T6 |
133.64 |
4 |
4 |
17 |
W7 X03 2 BHK T1 |
85.42 |
1 |
0 |
18 |
W7 X03 3 BHK T4 |
124.91 |
5 |
5 |
19 |
W7 X03 3BHK T3 |
124.83 |
7 |
7 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
94
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
27
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
79
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
89
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
68.9
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
8 |
TEN BKC
|
WING 8
|
05/06/2024
|
5
|
1
|
0
|
29
|
0 |
0 |
82 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W8 X02 2BHK T2 |
89.18 |
1 |
0 |
2 |
W8 X02 3BHK T6 |
123.31 |
14 |
8 |
3 |
W8 X03 3BHK DUP T7 |
115.03 |
2 |
2 |
4 |
W8 X03 3BHK DUP T6 |
115.01 |
1 |
1 |
5 |
W8 X02 3BHK T4 |
123.21 |
3 |
2 |
6 |
W8 X02 3BHK T5 |
123.23 |
2 |
2 |
7 |
W8 X01 3BHK T1 |
113.56 |
2 |
2 |
8 |
W8 X02 3BHK T7 |
123.35 |
6 |
6 |
9 |
W8 X03 3BHK DUP T5 |
115 |
3 |
3 |
10 |
W8 X03 3BHK DUP T1 |
112.96 |
1 |
1 |
11 |
W8 X03 1BHK T1 |
57.53 |
1 |
0 |
12 |
W8 X03 3BHK DUP T4 |
114.89 |
3 |
3 |
13 |
W8 X03 3BHK DUP T8 |
119.77 |
1 |
1 |
14 |
W8 X03 3BHK T3 |
114.74 |
1 |
1 |
15 |
W8 X03 3 BHK DUP T2 |
114.6 |
2 |
1 |
16 |
W8 X04 3BHK T4 |
114.62 |
7 |
5 |
17 |
W8 X04 3BHK T3 |
114.53 |
4 |
4 |
18 |
W8 X04 3BHK T2 |
114.52 |
9 |
8 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
98
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
23
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
75
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
89
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
68.5
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
9 |
TEN BKC
|
WING 9
|
05/06/2024
|
5
|
1
|
0
|
29
|
0 |
0 |
121 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W9 X01 2BHK T1 |
68.76 |
12 |
11 |
2 |
W9 X01 2BHK T3 |
68.78 |
3 |
3 |
3 |
W9 X01 2BHK T5 |
68.93 |
7 |
7 |
4 |
W9 X01 2BHK T4 |
68.79 |
1 |
1 |
5 |
W9 X02 3BHK T2 |
102.05 |
10 |
10 |
6 |
W9 X02 3BHK T1 |
101.99 |
2 |
2 |
7 |
W9 X03 2BHK T6 |
75.01 |
27 |
22 |
8 |
W9 X03 1BHK T1 |
56.19 |
1 |
0 |
9 |
W9 X02 3BHK T3 |
102.13 |
13 |
10 |
10 |
W9 X04 3BHK T10 |
124.09 |
1 |
1 |
11 |
W9 X04 3BHK T8 |
123.31 |
2 |
1 |
12 |
W9 X04 5BHK DUP T1 |
238.39 |
1 |
1 |
13 |
W9 X04 5BHK DUP T2 |
260.68 |
1 |
0 |
14 |
W9 X04 3BHK T12 |
130.39 |
1 |
0 |
15 |
W9 X04 3BHK T9 |
123.34 |
1 |
1 |
16 |
W9 X04 3BHK T7 |
103.44 |
5 |
4 |
17 |
W9 X04 3BHK T13 |
134.87 |
1 |
1 |
18 |
W9 X04 3BHK T6 |
103.4 |
7 |
3 |
19 |
W9 X04 3BHK T11 |
127.2 |
1 |
1 |
20 |
W9 X04 3BHK T5 |
103.16 |
4 |
2 |
21 |
W9 X04 3BHK T4 |
103.12 |
1 |
0 |
22 |
W9 X01 2BHK T2 |
68.77 |
5 |
5 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
71
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
63
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
56.2
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
10 |
TEN BKC
|
WING 10
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
37 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W10 X01 2BHK T1 |
68.89 |
12 |
11 |
2 |
W10 X02 3BHK T1 |
90.72 |
22 |
14 |
3 |
W10 X01 2BHK T2 |
68.94 |
5 |
5 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
76
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
58
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
56.2
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
11 |
TEN BKC
|
WING 11
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
80 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W11 X02 3BHK T6 |
121.79 |
1 |
1 |
2 |
W11 X02 3BHK T5 |
118.93 |
1 |
1 |
3 |
W11 XO3 3BHK T3 |
109.12 |
5 |
4 |
4 |
W11 X03 3BHK T4 |
109.22 |
15 |
10 |
5 |
W11 X01 3BHK T2 |
99.83 |
22 |
13 |
6 |
W11 X02 3BHK T1 |
91.54 |
20 |
8 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
63
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
65
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
55.6
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
12 |
TEN BKC
|
WING 12
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
55 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W12 X01 3BHK T2 |
102.14 |
20 |
9 |
2 |
W12 X02 3BHK T1 |
102.09 |
20 |
9 |
3 |
W12 X01 3BHK T3 |
109.92 |
1 |
0 |
4 |
W12 X01 3BHK T4 |
132.53 |
1 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
72
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
65
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
56.5
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
13 |
TEN BKC
|
WING 13
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
55 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W13 X01 3BHK T1 |
100.56 |
3 |
1 |
2 |
W13 X02 3BHK T5 |
116.85 |
7 |
7 |
3 |
W13 X02 3BHK T6 |
120.54 |
1 |
1 |
4 |
W13 X02 3BHK T4 |
116.86 |
14 |
13 |
5 |
W13 X01 3BHK D |
100.97 |
4 |
2 |
6 |
W13 X01 3BHK T3 |
100.98 |
13 |
10 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
99
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
29
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
93
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
72
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
69.3
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
14 |
TEN BKC
|
WING 14
|
05/06/2024
|
5
|
1
|
0
|
22
|
0 |
0 |
55 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W14 X01 3BHK T4 |
112.24 |
1 |
1 |
2 |
W14 X01 3BHK T7 |
112.67 |
8 |
8 |
3 |
W14 X01 3BHK T5 |
112.58 |
1 |
1 |
4 |
W14 X01 3BHK T6 |
112.64 |
10 |
8 |
5 |
W14 X01 3BHK T8 |
112.81 |
1 |
1 |
6 |
W14 X02 5BHK DUP T1 |
112.63 |
2 |
2 |
7 |
W14 X01 5BHK DUP T1 |
112.63 |
1 |
1 |
8 |
W14 X02 3BHK T3 |
111.98 |
6 |
6 |
9 |
W14 X02 4BHK DUP T2 |
175.24 |
1 |
1 |
10 |
W14 X02 3BHK T1 |
111.87 |
9 |
7 |
11 |
W14 X02 4BHK DUP T1 |
174.45 |
1 |
1 |
12 |
W14 X02 3BHK T2 |
111.89 |
1 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
69
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
50
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
54.7
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
15 |
TEN BKC
|
WING 15
|
06/06/2022
|
5
|
1
|
0
|
22
|
0 |
0 |
55 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
W15 X01 3BHK T3 |
110 |
4 |
4 |
2 |
W15 X01 3BHK T3 |
109.86 |
5 |
4 |
3 |
W15 X01 3BHK T1 |
109.74 |
11 |
8 |
4 |
W15 X02 3BHK T7 |
134.99 |
4 |
3 |
5 |
W15 X02 3BHK T6 |
134.83 |
5 |
4 |
6 |
W15 X02 3BHK T4 |
134.69 |
1 |
1 |
7 |
W15 X02 3BHK T5 |
134.74 |
11 |
9 |
8 |
W15 X02 4 BHK T1 |
165.08 |
1 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
59
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
50
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
28
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
53.7
|
|