MahaRERA Application

General Information

Other Than Individual

Organization

VIKAASHA HOUSING
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SHOP NO 29
PAYAL COMPLEX
PLOT 15D
SECTOR NO 17
NEW PANVEL
MAHARASHTRA
Konkan
Raigarh
Panvel
New Panvel
410206

Organization Contact Details

02532511686

Past Experience Details

Member Information

Member Name Designation Photo
KALIM NIAZODDIN SHAIKH Authorized Signatory View Photo
SANTOSHKUMAR RAVINATH SHETTY Partner View Photo
BHAVESH RAMESH THAKKAR Partner View Photo
VINAYPRAKASH AKHLESHPRATAP SINGH Partner View Photo
SACHIN LALJI THAKKAR Partner View Photo
NIRAV HASMUKHRAI PANCHMATIA Partner View Photo
MONA SANJAY PABARI Partner View Photo

Project

SPACE WORLD BUILDING NO 1 E WING
On-Going Project
31/12/2023
30/12/2024
No
Residential
No
S NO 17/1 PAR
MARGINAL SPACE
OPEN SPACE 2
BUILDING NO 1 D WING
BUILDING NO 1 F WING
MAHARASHTRA
Konkan
Raigarh
Karjat
Anjap
ANJAP
KARJAT
410101
2181
1
1
0
209

FSI Details

2220
0
2220.00

Bank Details

ORIENTAL BANK OF COMMERCE
ORBC0101202

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 SHALL BE PROVIDED BY PROMOTER
Water Conservation, Rain water Harvesting : YES 0 RAIN WATER HARVESTING NEAR BORWELL
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 SHALL BE PROVIDED BY PROMOTER
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 SHALL BE PROVIDED BY PROMOTER
Aggregate area of recreational Open Space : YES 0 AS PER APPROVED PLAN
Open Parking : YES 0 AS PER APPROVED PLAN
Water Supply : YES 0 PROVIDED BY AUTHORITY
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 SHALL BE PROVIDED BY PROMOTER
Storm Water Drains : YES 0 SHALL BE PROVIDED BY PROMOTER
Landscaping & Tree Planting : YES 0 SHALL BE PROVIDED BY PROMOTER
Street Lighting : YES 0 SHALL BE PROVIDED BY PROMOTER
Community Buildings : YES 0 SHALL BE PROVIDED BY PROMOTER
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AS PER CONSULTANT
Solid Waste Management And Disposal : YES 0 AS PER CONSULTANT

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SPACE WORLD BUILDING NO 1 E WING E WING 31/12/2023 0 1 0 8 1 79 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 28.49 14 1
2 1 BHK 29.31 7 1
3 1 BHK 29.17 21 2
4 1 BHK 29.28 14 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SPACE INDIA BUILDERS & DEVELOPERS A52000003144 Real Estate Agent
SATISH MANOHAR NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement