MahaRERA Application

General Information

Other Than Individual

Organization

GAGAN LIFESPACE
Partnership
NA
Do you have any Past Experience ?
No

Address Details

2ND FLOOR
WELLESLEY COURT
WELLESLEY ROAD
CAMP
ABOVE BMW SHOWROOM
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411001

Organization Contact Details

02026133111

Past Experience Details

Member Information

Member Name Designation Photo
SUSHIL GHANSYAMDAS AGARWAL Authorized Signatory View Photo
DIMPLE ALNESH SOMJI Authorized Signatory View Photo
UNNATI LIFESPACE LLP THROUGH ITS AUTHORISED PARTNER NIKUNJ ARUN SANGHVI Partner View Photo
HANIF GULAMALI SOMJI Authorized Signatory View Photo
RAJEV JAGWANEE Authorized Signatory View Photo

Project

GAGAN NULIFE PHASE 2
On-Going Project
31/12/2018
31/12/2019
30/09/2022
No
Residential
No
SR NO 106/1 106/2 161/1/3
OPENSPACE
BUILDING
SR NO 105
KUSGAON VILLAGE BOUNDARY
MAHARASHTRA
Pune
Pune
Mawal
Kusgaon Kh.
Pune Mumbai old highway
Kamshet
410405
2998.99
1
1
0
299.89

FSI Details

6696.91
0
6696.91

Bank Details

KOTAK MAHINDRA BANK
KKBK0000721

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 56 40 25

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 25 TREMIX ROADS
Water Conservation, Rain water Harvesting : YES 20 OPEN WELL AND RECHARGE PITS
Energy management : YES 0 SOLAR WATER HEATING AND LED FIXTURES
Fire Protection And Fire Safety Requirements : YES 0 PROPOSED
Electrical Meter Room, Sub-Station, Receiving Station : YES 20 TRANSFORMER YARD
Aggregate area of recreational Open Space : YES 0 -
Open Parking : NO 0 NA
Water Supply : YES 28 GROUND WATER AND GRAM PANCHAYAT
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 STP PROPOSED
Storm Water Drains : YES 70 RCC PIPES WEEP HOLE CHAMBERS
Landscaping & Tree Planting : YES 15 NATIVE SPECIES
Street Lighting : YES 0 STREET LIGHTS WITH LED
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 75 REUSE FOR FLUSHING AND GARDENING
Solid Waste Management And Disposal : YES 10 ORGANIC WASTE CONVERTOR

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 GAGAN NULIFE PHASE 2 C BUILDING 31/12/2019 1 1 0 12 1 0 56
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 35.49 9 6
2 1BHK 35.51 10 9
3 1 BHK 36.14 10 9
4 1BHK 36.56 5 5
5 1 BHK 35.36 10 8
6 1 BHK 35.28 5 4
7 1 BHK 36.63 5 1
8 1 BHK 36.60 5 3
9 1 BHK 36.79 5 4
10 1BHK 36.82 10 6
11 1 BHK 36.64 4 0
12 1 BHK 36.76 5 4
13 1 BHK 35.76 5 5
14 1BHK 35.24 5 4
15 1BHK 35.29 10 8
16 1BHK 35.32 10 8
17 1 BHK 35.41 5 5
18 1 BHK 35.72 5 4
19 1 BHK 35.45 5 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 51

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
VILAS TARWADI NA Architect
G A BHILARE CONSULTANTS PVT LTD NA Engineer
Pankaj Kumar Chaurasia A52100000283 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Form 2A
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000258907 GAGAN NULIFE 'C' BUILDING RESIDENTS ASSOCIATION View Orders