MahaRERA Application

General Information

Other Than Individual

Organization

Mahindra Lifespace Developers limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

5th Floor
Mahindra Towers
Dr. G.M Bhosale
Worli
Near Doordarshan
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400018
400018

Organization Contact Details

09535688855

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Boisar Phase IIResidentialNA10282.7Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District PalgharGut No 50 Plot No 162382017-12-312017-06-20
2AspenResidentialNA23376.4Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road MumbaiCTS No 899/A TO E1682012-12-172012-12-17
3AngelicaResidentialNA23376.4Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road MumbaiCTS No 899/A TO E1672013-03-252013-03-25
4Splendour Phase 1ResidentialNA34279CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078CTS NO 617 part 617 30 617 3932652011-08-152011-08-15
5Splendour Phase 2ResidentialNA34279CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078reCTS NO 617 part and 617 30 and 617 3922332013-11-142013-06-28
6LartistaResidentialNA3963Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018Survey No 67B/4A plus 5A Plot No 1 ie CTS No 801 to 8061212016-09-162016-09-16
7BloomdaleResidentialNA102191MBDL mihan sez de Notified Area Beside DYPatil International School Khapri NagpurSurvey Nos 17 Part 18 Part 19 Part 26 Part 27 Part 28 29 Part 30 Part 31 Part 35 part 36 Part 39 Pa83422016-03-302017-01-23
8AshvitaResidentialNA36856Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072Sy No 78 PART 2 AND 78 PART356642016-06-302016-05-31
9WindchimesResidentialNA23674Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075Sy no 37PART3PART40PART 1 41PART 3 37PART 2A137PART2A224542018-12-312018-12-31
10Aura PH1ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200832312013-05-312013-05-31
11Aura PH2ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821662013-11-302014-10-31
12Aura PH3ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821102014-10-312015-08-31
13Aura PH4ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821422015-01-312015-12-31
14Aura PH5ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821502015-01-312016-09-30
15Luminare PH1ResidentialNA27519Sector 59 Gurgaon Manesar Urban ComplexLiscence Number 16 of 2008 dated 3101200811202020-03-312020-03-31
16Luminare PH2ResidentialNA27519Sector 59 Gurgaon Manesar Urban ComplexLiscence Number 16 of 2008 dated 3101200811202021-02-282021-02-28
17Aqualily Phase 1AResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3541412012-10-312012-10-31
18Aqualily Phase 1BResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3533332013-10-312013-10-31
19Aqualil Phase 1C AND 1DResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3577772014-10-312014-10-31
20Aqualily Phase 2AResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 355802013-11-302014-03-31
21Aqualily Phase 2BResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3581782014-11-302014-11-30
22Aqualily Phase 2C1Block C1AND C2ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 352562015-09-302016-03-31
23Aqualily phase 2C1-Block C3 AND C4ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 352562015-09-302016-03-31
24Aqualily Phase 2C1-Block C6ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 351282015-12-312016-03-31
25Aqualily Phase 2C1 Block C5ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 351242017-03-312016-03-31
26Aqualily Phase 2EResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3531962019-03-312019-03-31
27Iris Court Phase IResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1822442013-06-302013-12-31
28IRIS Court Phase 2 Block C AND DResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 182962015-09-302015-03-31
29IRIS Court Phase 2 Block EResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1811332015-03-312015-03-31
30IRIS Court Phase 3AResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1811332015-03-312015-03-31
31IRIS Court Phase 3BResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 182962016-03-312016-03-31
32Nova Phase 1ResidentialNA29542MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 2123572016-05-312016-03-31
33Nova- Phase 2ResidentialNA29542MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 2123692017-08-312017-03-31
34ChlorisResidentialNA18085Milestone 16 PART 3 Sector 19 Faridabad License no is 217 of 2007 Dated 07092007 81602011-07-312011-07-31
35Avadi Phase IResidentialNA20305Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka PoonamalleeS No 72/2 77/2 87/3 88/3 89/5 90/1 2 3 91 92/1 93/7 98 99 100 101/766042016-06-302016-04-20
36BOISAR Phase IResidentialNA14770Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District PalgharGut No 50 Plot No 193592017-06-302017-01-23

Member Information

Member Name Designation Photo
Arun Kumar Tilak Raj Nanda Chairperson View Photo
Arvind Subramanian Managing Director View Photo
K R Sudarshan Authorized Signatory View Photo

Project

Happinest Tathawade Phase-1
New Project
31/01/2027
No
Residential
No
Survey No 157/1
Happinest Tathawade EWS Building
Happinest Tathawade Phase-2
18m wide DP road
Survey No 157-2
MAHARASHTRA
Pune
Pune
Mulshi
Tathwade
Tathawade Katraj Dehuroad Bypass Road
Tathawade
411033
9286.50
6
6
0
2162.69

FSI Details

48109.95
0
48109.95

Bank Details

Axis Bank
UTIB0000653

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 1200 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Will be provided
Water Conservation, Rain water Harvesting : YES 0 Will be provided
Energy management : YES 0 Will be provided
Fire Protection And Fire Safety Requirements : YES 0 Will be provided
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Will be provided
Aggregate area of recreational Open Space : YES 0 Will be provided
Open Parking : YES 0 Will be provided
Water Supply : YES 0 Will be provided
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Will be provided
Storm Water Drains : YES 0 Will be provided
Landscaping & Tree Planting : YES 0 Will be provided
Street Lighting : YES 0 Will be provided
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Will be provided
Solid Waste Management And Disposal : YES 0 Will be provided

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Happinest Tathawade Phase-1 MLCP 31/01/2027 1 0 0 5 1 0 880
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Multilevel car park 0 0 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Happinest Tathawade Phase-1 Club House 31/01/2027 0 1 0 2 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Club House 0 0 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Happinest Tathawade Phase-1 Building D 31/01/2027 1 0 0 23 1 17 62
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Happinest Tathawade Phase-1 Building E 31/01/2027 1 0 0 23 1 17 61
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 38.62 85 85
2 2BHK 53.15 88 87
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 Happinest Tathawade Phase-1 Building F 31/01/2027 1 0 0 23 1 17 64
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 38.62 85 84
2 2BHK 53.15 88 87
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 Happinest Tathawade Phase-1 Building G 31/01/2027 1 0 0 23 1 17 65
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 53.15 88 87
2 1BHK 38.62 85 84
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Sankalp Designers NA Architect
Optimal Consultancy Service Pvt Ltd NA Other Professional
A B D AND CO LLP NA Chartered Accountant
DIGA CONSULTANTS AND VALUERS LLP NA Engineer
7TH HEAVEN HOMES LLP A52100022540 Real Estate Agent
Abhijeet Bhagwan Sabale A52100014389 Real Estate Agent
Abhijeet Laxman Pardeshi A52100005879 Real Estate Agent
ABHIJIT JAGDISH MUPPID A52100015844 Real Estate Agent
ABHIJIT SAHEBRAO SABBARWAR A52100000382 Real Estate Agent
ABHIJIT VISHNU JADHAV A52100018543 Real Estate Agent
ABHISHEK ARUN BHUKAN A52100018332 Real Estate Agent
ABHISHEK ARVIND PATIL A52100005989 Real Estate Agent
Abhishek Indrapal Singh Parmar A52100011870 Real Estate Agent
Aditya G Mishra A52100004225 Real Estate Agent
CHANDAR JETHANAND NATHPOTANI A52100018703 Real Estate Agent
AJEET KUMAR PANDEY A52100013889 Real Estate Agent
AJINKYA VIJAYKUMAR BENDRE A51800011458 Real Estate Agent
AKASH ANAND PADILE A52100021294 Real Estate Agent
AKSHAY ARUN MORE A52100022008 Real Estate Agent
ALKA TIWARI A52100005513 Real Estate Agent
AMARDEEP UTTRESHWAR DHAS A52100005740 Real Estate Agent
amar laxman bhalke A52200016342 Real Estate Agent
AMARSINGH DALPATSINGH BHATI A52100014302 Real Estate Agent
Amazon Realty A52100018866 Real Estate Agent
Ameeth Kothari A52100000092 Real Estate Agent
AMIN ABDUL ALACHIYA A52100010879 Real Estate Agent
AMIT ANIL KULKARNI A52100009654 Real Estate Agent
AMIT KUMAR A52100021509 Real Estate Agent
AMIT KUMAR MANGALAM A52100005479 Real Estate Agent
Amit Pandurang Jagtap A52100021355 Real Estate Agent
Amit Ramesh Hanche A52100001017 Real Estate Agent
AMIT VINODKUMAR GUPTA A52100000529 Real Estate Agent
AMMOL WALKE A50500017858 Real Estate Agent
AMOL ASHOK KALAMKAR A52600011178 Real Estate Agent
Amol Hanmantrao Kadam A52100022513 Real Estate Agent
AMOL MARUTI PHIRANGE A52100004147 Real Estate Agent
AMOL PRABHAKAR MUSALE A52100002165 Real Estate Agent
amoya consulting LLP A52100017509 Real Estate Agent
ANAND PRATAP SINGH A52100022689 Real Estate Agent
ANANTA UTTAM NAGARE A52100012547 Real Estate Agent
ANIKET DHARMASHIL AHER A52100020592 Real Estate Agent
ANIKET GATE A52100006164 Real Estate Agent
ANIL DILIP FAKATAKAR A52100008987 Real Estate Agent
Anil Nanasaheb Kharde A52100022517 Real Estate Agent
Anil Phulwani A52100015250 Real Estate Agent
Aniruddha Avinash Dukane A52100019655 Real Estate Agent
Anita Abhay Dhoka A52100016086 Real Estate Agent
ANIT KUMAR A52100014335 Real Estate Agent
Ankit Sachdeva A52100000478 Real Estate Agent
Ankit Tibrewal A52100015928 Real Estate Agent
Ankur Gupta A52100009189 Real Estate Agent
ANKUSH JAYPRAKASH AGARWAL A52100018868 Real Estate Agent
ANOOP KUMAR SAXENA A52100001864 Real Estate Agent
Anup Sunil Chordiya A52100006709 Real Estate Agent
Anuradha Darshan Chawla A52100001562 Real Estate Agent
Archana Amitabh Bagde A52100005308 Real Estate Agent
Archana Ranjan Kulkarni A52100017783 Real Estate Agent
Arthur Morris A52100003774 Real Estate Agent
Arthur Morris A52100003774 Real Estate Agent
Arunavo Banerjee A51900014274 Real Estate Agent
ARUN SINGH SOLANKI A52100016112 Real Estate Agent
ARUN SUTIKSHAN BALLARKHEDE A52100015194 Real Estate Agent
Arvind Kumar Vaishya A52100015112 Real Estate Agent
Asha Agarwal A52100000164 Real Estate Agent
Asheesh Mishra A52100004326 Real Estate Agent
ASHISH MODI A52100003744 Real Estate Agent
ASHISH PAREEK A52100006841 Real Estate Agent
Ashish Rajendra Khinvasara A52100000068 Real Estate Agent
Ashish Singh A52100016169 Real Estate Agent
Ashok Gangaram Mane A52100009892 Real Estate Agent
ASHOK KUMAR RAMA SHNAKAR KUSHWAHA A52100000962 Real Estate Agent
ASHOK PATIDAR A52100019233 Real Estate Agent
Ashok Shivalingappa Kalshetti A52100017845 Real Estate Agent
ASHUTOSH P JOSHI A52100017517 Real Estate Agent
ASHWANI FOTEDAR A52100020002 Real Estate Agent
Ashwini Vishwanath Kulkarni A52100014134 Real Estate Agent
Ashok Dilip Patil proprietor of Ask Realty A52100019814 Real Estate Agent
Aslam Allauddin Sayed A52100021452 Real Estate Agent
ASSET PLUS PROPERTIES A52100011760 Real Estate Agent
ATMARAM SUBHASH KORKALLE A52100002810 Real Estate Agent
ATUL SANTU MANDE A52100001458 Real Estate Agent
Avanesh Singh A08600022725 Real Estate Agent
AVINASH PANDA A52100014316 Real Estate Agent
BAJIRAO PUNJA NAVALE A52200016124 Real Estate Agent
BALU UTTAM BHAGWAT A52100017031 Real Estate Agent
BAPURAO MARUTI MOHITE A52100012600 Real Estate Agent
Bhatu Dhanraj Patil A52100010039 Real Estate Agent
BIJAY SINGH A57200022172 Real Estate Agent
Bipin Singh A52100002386 Real Estate Agent
Ceyone Teachnologies LLP A52100012743 Real Estate Agent
CHAHAT DHEERAJ PARWANI A52100019093 Real Estate Agent
CHANDAN Kumar A52100001791 Real Estate Agent
CHANDRAPRAKASH RAY A52100015643 Real Estate Agent
Charushila Vishal Bhalerao A52100017073 Real Estate Agent
CHETAN LILACHAND PATIL A52100016538 Real Estate Agent
CHRISTOPHER SIMON LOBO A52100018568 Real Estate Agent
Jitendra Rawat A52100020162 Real Estate Agent
CLEAR SPACE REALTY A52100020029 Real Estate Agent
Cosmotown Shelters LLP A52100005482 Real Estate Agent
Darshan Chawla A52100000086 Real Estate Agent
DATTATRAYA HANUMANT KHARPUDE A52100000501 Real Estate Agent
DATTATRI VENKATRAO MANE A52100009878 Real Estate Agent
Deepak Virendrakumar Sharma A52100012362 Real Estate Agent
Deepa onkar Bhujbal A52100021644 Real Estate Agent
Loyalie IT-Solutions Pvt. Ltd A51900010267 Real Estate Agent
Sarika Sunil Bhovad A51800015712 Real Estate Agent
ANIL KUMAR SINGH A99000031328 Real Estate Agent
SAYYED HAMID ALI A51800014679 Real Estate Agent
Akshay Rajesh Badale A51800032281 Real Estate Agent
P G BHAGWAT LLP NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
12 Engineer’s Certificate on Cost Incurred on Project (Form 2)
13 Engineer’s Certificate on Cost Incurred on Project (Form 2)
14 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
7 Other
8 Other
9 Other
10 Other
11 Other
12 Other
13 Other
14 Other
15 Other
16 Other
17 Other
18 Other
19 Other
20 Other
21 Other
22 Other
23 Other
24 Other
25 Other
26 Other
27 Other
28 Other
29 Other
30 Other
31 Other
32 Other
33 Other
34 Other
35 Other
36 Other
37 Other
38 Other
39 Other
40 Other
41 Other
42 Other
43 Other
44 Other
45 Other
46 Other
47 Other
48 Other
49 Other
50 Other
51 Other
52 Other
53 Other
54 Other
55 Other
56 Other
57 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement