MahaRERA Application

General Information

Other Than Individual

Organization

LANDSCAPE REALITY
Company
NA
Do you have any Past Experience ?
No

Address Details

101
EXPRESS TOWER
LAXMI ROAD
SADASHIV PETH
PNG JEWLLERS
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411030

Organization Contact Details

02024435020

Past Experience Details

Member Information

Member Name Designation Photo
PALLAVI AMIT VAIDYA Director View Photo
BHUSHAN RAVINDRA DANDAVATE Authorized Signatory View Photo

Project

ANANTSRISHTI PHASE I
On-Going Project
31/05/2017
31/03/2019
30/09/2020
Yes
Mixed (Plots & Buildings)
No
GUT NO 387 AND 404
GUT NO 400 AND 403
36 M WIDE RP ROAD
GUT NO 405
GUT NO 386 AND 380
MAHARASHTRA
Pune
Pune
Mawal
Jambhul
TAKVE ROAD
JAMBHUL
412106
60588.36
8
8
0
3998.37

FSI Details

45859
0
45859

Bank Details

JANATA SAHAKARI BANK LTD
JSBP0000098

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 172 172 85

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 TAR AND PAVED ROADS
Water Conservation, Rain water Harvesting : YES 100 AS PER CONSULTANT DETAILS
Energy management : YES 100 AS PER NORMS
Fire Protection And Fire Safety Requirements : YES 100 AS PER CONSULTANT DETAILS
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 AS PER CONSULTANT DETAILS
Aggregate area of recreational Open Space : YES 80 AS PER CONSULTANT DETAILS
Open Parking : NO 0 NA
Water Supply : YES 88 AS PER CONSULTANT DETAILS
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 88 AS PER CONSULTANT DETAILS
Storm Water Drains : YES 88 AS PER CONSULTANT DETAILS
Landscaping & Tree Planting : YES 100 AS PER CONSULTANT DETAILS
Street Lighting : YES 0 AS PER CONSULTANT DETAILS
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 75 AS PER CONSULTANT DETAILS
Solid Waste Management And Disposal : YES 75 AS PER CONSULTANT DETAILS

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 ANANTSRISHTI PHASE I H WING 30/09/2020 0 1 0 7 0 25 22
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 59.48 14 14
2 2 BHK 58.51 14 14
3 2.5 BHK 66.55 14 14
4 1 BHK 39.42 14 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 ANANTSRISHTI PHASE I I WING 30/09/2020 0 1 0 7 0 39 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 59.48 14 14
2 2 BHK 58.51 14 14
3 2.5 BHK 66.55 14 14
4 1 BHK 39.42 14 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 ANANTSRISHTI PHASE I J WING 0 1 0 7 0 5 23
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 59.25 14 14
2 2.5 BHK 70.11 14 14
3 1 BHK 41.02 28 28
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 ANANTSRISHTI PHASE I Q WING 30/09/2020 0 1 0 7 0 4 23
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 59.25 14 14
2 2.5 BHK 70.11 14 14
3 1 BHK 41.02 28 27
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 ANANTSRISHTI PHASE I K WING 31/03/2019 0 1 0 9 0 7 23
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5 BHK 70.11 18 16
2 2 BHK 59.25 18 14
3 1 BHK 41.02 36 22
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 ANANTSRISHTI PHASE I P WING 31/03/2019 0 1 0 9 0 6 23
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5 BHK 70.11 18 15
2 1 BHK 41.02 36 30
3 2 BHK 59.25 18 17
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 ANANTSRISHTI PHASE I C TYPE ROW HOUSE 31/03/2019 0 1 0 1 0 0 8
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK 94.12 8 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
8 ANANTSRISHTI PHASE I D TYPE ROW HOUSE 31/03/2019 0 1 0 1 0 0 8
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK 94.12 8 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Plot Details

Number of Plots Area of Plot(In sqmts) Number of Plots Booked / Alloted / Sold
7 102.76 7
95 82.35 95
18 66.15 17
3 171.34 3

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Asha Agarwal A52100000164 Real Estate Agent
SPACEINDIA NEST LLP A52100002248 Real Estate Agent
HDFC Realty Limited A51900000107 Real Estate Agent
Prasad Hanmant Kulkarni A52100000272 Real Estate Agent
KAUSTUBH JOSHI A52100000592 Real Estate Agent
Asha Agarwal A52100000164 Real Estate Agent
Ashish Shrikrishna Khamkar A52100000048 Real Estate Agent
GLOBAL REALTORS A52100000018 Real Estate Agent
PROPERTY CHEF CONSULTING SERVICES A52100000044 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
Vanashri Pradip Walkey A52100001172 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
Nitesh Roop Narayan Khare A52100000106 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
NITESH KUMAR SINGH A52100002854 Real Estate Agent
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
SUNIL MUTALIK NA Engineer
Om Sai Land Developers & Transport NA Contractor
Active Construction NA Contractor
B.A.Sai Construction NA Contractor
Sanat Associate NA Contractor
Shree Ram Construction NA Contractor
Sagar Enterprises (A.R. Enterprises) NA Contractor
Simran Enterprises NA Contractor
Swastik Engineering NA Contractor
Samarth Industries NA Contractor
M. K. Fabrication NA Contractor
Namrata Enterprises NA Contractor
Shivam Electromech Engicon Pvt. Ltd. NA Contractor
Rajesh Electricals NA Contractor
Sameer Electro Systems Pvt. Ltd. NA Contractor
D. B. Jena NA Contractor
S.S. Construction NA Contractor
Milind Pokharkar & Associates NA Architect
AMBITUS REALTORS AND ADVISORS PRIVATE LIMITED A52100009541 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
ANANTSRISHTI PHASE I Honarable civil judge senior division wadgaon maval 515 Civil No Suit NA 2017 Injuction application rejected
NA
ANANTSRISHTI PHASE I The Maharashtra Real Estate Regulatory Authority Office at Bandra East CC005000000022472 Others No Other RERA complaint 2019 Posted for reply of Respondent
NA
ANANTSRISHTI PHASE I The Maharashtra Real Estate Regulatory Authority Office at Bandra East CC005000000022150 Others No Other RERA complaint 2019 Posted for reply of Respondent
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
4 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
3 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000022150 RAMESHWAR RADHESHYAM MANIYAR View Orders
2 CC005000000022150 ASHA RAMESHWAR MANIYAR View Orders
3 CC005000000022472 Ramchandra Dhondiba Gawade View Orders
4 CC005000000022472 Ramchandra Dhondiba Gawade View Orders
5 CC005000000022472 Mrs. Vasudha Ramchandra Gawade View Orders
6 CC005000000022472 Mrs. Vasudha Ramchandra Gawade View Orders
7 CC005000000023124 Shashikant Shridhar Gawade View Orders
8 CC005000000033475 DWARKADHISH DESHPANDE AND APARNA DESHPANDE View Orders
9 CC005000000043797 MAYURESH SHASHIKANT BHAVE View Orders
10 CC005000000043797 SHASHIKANT VASANT BHAVE View Orders
11 CC005000000064835 Vidyadhar Jayant Joshi View Orders
12 CC005000000064836 RAHUL KAMALAKANT VAIDYA View Orders
13 CC005000000064836 PRIYA RAHUL VAIDYA View Orders
14 CC005000000064837 RAHUL KAMALAKANT VAIDYA View Orders
15 CC005000000064837 PRIYA RAHUL VAIDYA View Orders
16 CC005000000064839 ANAND V CHANDEKAR View Orders
17 CC005000000064839 Audrey Mithula Chandekar View Orders
18 CC005000000095785 Mr. Shantaram Sudhakar Arvindekar View Orders
19 CC005000000095785 Mrs. Archana Shantaram Arvindekar View Orders