MahaRERA Application

General Information

Other Than Individual

Organization

Pune Projects LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

501
Kensington Court
S G Pingale Lane
Koregaon Park
Off North Main Road
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411001

Organization Contact Details

08043439793

Past Experience Details

Member Information

Member Name Designation Photo
Ashish R Puravanakara Authorized Signatory View Photo

Project

Purva Silversand
On-Going Project
30/11/2020
28/11/2022
28/11/2023
Yes
Others
Yes
Sy No 9 to 14
Sy No 9 to 14
18 mts Road
Sy No 9 to 14
Mula-Mutha River
MAHARASHTRA
Pune
Pune
Haveli
Mundhawa
Keshav Nagar Road
Keshavnagar
411036
3146.84
6
6
0
0

FSI Details

67963.77
0
67963.77

Bank Details

IndusInd Bank
INDB0000008

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Purva Silversand Oxford Shelters Private Limited Company Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Purva Silversand Hritik Technologies & Realty Private Limited Company Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 546 78
Covered Parking ( In Numbers) 665 546 78

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 N.A
Water Conservation, Rain water Harvesting : YES 100 N.A
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 N.A
Electrical Meter Room, Sub-Station, Receiving Station : YES 90 N.A
Access to commercial shopping areas proposed in subsequent phases of entire Silversands project : NO 0 NA
Designated space for beach volleyball court and half basketball post and cricket practice pitch : YES 0 Per sanction norms
Designated space for jogging and walking track : YES 0 Per sanction norms
Designated space for outdoor yoga and meditation deck and multi play courts : YES 0 Per sanction norms
Designated space for senior citizens and hopskotch : YES 0 Per sanction norms
Parking Level Podiums : YES 0 Podiums are built as a whole across the project.
Single hole putting golf green with astro turf : NO 0 NA
Swimming pool with demarcated kids pool and provision for snorkelling : YES 0 Per sanction norms
Wave pool and designated space for koi fish pond and wet pool bar : YES 0 Per sanction norms
Aggregate area of recreational Open Space : YES 0 N.A
Open Parking : YES 0 N.A
Water Supply : YES 95 N.A
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 95 N.A
Storm Water Drains : YES 100 N.A
Landscaping & Tree Planting : YES 90 N.A
Street Lighting : YES 80 N.A
Community Buildings : YES 100 Clubhouse with indoor amenities
Treatment And Disposal Of Sewage And Sullage Water : YES 0 N.A
Solid Waste Management And Disposal : YES 0 N.A

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Purva Silversand Phase 1 Building 4 30/11/2021 0 1 3 21 0 0 484
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK Type B1D 59.5 1 1
2 2BHK Type B1T1 59.58 1 1
3 2BHK Type B1T2 59.28 1 1
4 3BHKTypeA3 76.34 1 1
5 3BHKTypeAT1 77.50 2 2
6 3BHKTypeAT2 75.87 1 1
7 2BHKTypeB2T2 57.16 1 1
8 2BHK AR1 66.44 2 2
9 2BHK AR2 65.3 1 1
10 2BHK Type B2C 56.22 2 2
11 3BHKTypeA2 77.56 14 13
12 2BHK Type B2B 56.88 7 6
13 2BHK A Refuge T1 65.3 1 0
14 2BHK Type B2D 56.8 1 1
15 2BHK Type B2T1 56.88 1 1
16 2BHK Type B1B 59.43 7 6
17 2BHK Type B1B2A 57.75 9 7
18 3BHK Type A1 76.6 18 16
19 3BHKTypeA4 77.55 2 0
20 2BHK Type B1A 60.3 9 9
21 2BHK Type B1C 58.77 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 89
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

99
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 99
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Purva Silversand Phase 1 Building 5 30/11/2021 0 1 3 21 0 0 477
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK Type B1B 59.43 7 6
2 2BHK Type B2A 57.75 9 4
3 2BHK Type B2C 56.22 2 1
4 3BHK Type A1 76.6 18 16
5 3BHK Type A2 77.56 14 14
6 3BHK Type AT1 77.5 2 2
7 2BHK AR1 66.44 2 2
8 2BHK AR2 65.3 1 1
9 2BHK AR T1 65.3 1 1
10 2BHK Type B1A 60.3 9 9
11 2BHK Type B1C 58.77 2 2
12 2BHK Type B1D 59.5 1 1
13 2BHK Type B1T1 59.58 1 1
14 2BHK Type B1T2 59.28 1 1
15 2BHK Type B2B 56.88 7 3
16 2BHK Type B2D 56.8 1 1
17 2BHK Type B2T1 56.88 1 0
18 3BHK Type A3 76.34 1 1
19 3BHK Type A4 77.55 2 2
20 3BHK Type AT2 75.87 1 1
21 2BHK Type B2T2 57.16 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 79
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 97
11 Overall Percentage of Completion of the work done For the entire Building /Wing 97.1
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Purva Silversand Phase 1 Building 6 30/11/2021 0 1 3 21 0 0 278
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK Type A3 76.34 1 0
2 3BHK Type A3 Top 77.38 2 1
3 3BHK Type AT4 76.70 1 0
4 2BHK AR Top 65.29 1 0
5 2BHK Type B3D 57.75 4 2
6 2BHK Type B3E 58.02 2 0
7 2BHK AR3 66.35 2 2
8 2BHK Type B3A 58.59 18 10
9 2BHK Type B3B 58.02 14 12
10 2BHK Type B3C 56.82 4 3
11 3BHK Type A5 76.57 18 9
12 3BHK Type A6 77.26 14 6
13 3BHK Type A7 77.59 2 1
14 2BHK AR2 65.3 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 94
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

98
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
11 Overall Percentage of Completion of the work done For the entire Building /Wing 85.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Purva Silversand Phase 1 Building 7 30/11/2021 0 1 3 21 0 0 209
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK Type AT4 76.7 1 0
2 2BHK Type B3E 58.02 2 0
3 3BHK Type A3 76.34 1 0
4 2BHK AR2 65.3 1 0
5 2BHK AR Top 65.29 1 0
6 3BHK Type A6 77.26 14 2
7 3BHK Type A7 77.59 2 2
8 3BHK Type AT3 77.38 2 1
9 2BHk Type B3C 56.82 4 2
10 2BHK Type B3D 57.75 4 2
11 3BHK Type A5 76.57 18 7
12 2BHK AR3 66.35 2 1
13 2BHK Type B3A 58.59 18 13
14 2BHK Type B3B 58.02 14 12
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 93
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

97
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
11 Overall Percentage of Completion of the work done For the entire Building /Wing 85
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 Purva Silversand Phase 1 Building 8 30/11/2021 0 1 2 20 0 0 213
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK B41A 58.16 18 12
2 2BHK B41TA 58.16 2 0
3 2BHK B41TB 59.28 2 0
4 2BHK B4C 56.35 9 8
5 2BHK B4TA 57.78 1 0
6 2BHK B4TB 56.2 2 0
7 2BHK B4TC 56.35 1 0
8 1BHK TB 33.31 1 1
9 1BHK TC 33.34 1 1
10 1BHK A 33.31 14 14
11 1BHK B 33.31 8 8
12 1BHK C 33.34 8 8
13 1.5BHK RB 46.21 1 1
14 2BHK A3B 49.11 18 18
15 2BHK A3TB 49.11 2 2
16 2BHK B41B 59.14 18 13
17 2BHK B4A 57.78 9 2
18 2BHK B4B 56.2 18 12
19 2BHK A3TA 49.27 2 2
20 1BHK TA 33.31 2 2
21 1.5BHK RA 46.18 2 2
22 2BHK A3A 49.27 18 18
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 23
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 94
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

99
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 91
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90.7
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 Purva Silversand Phase 1 Building 9 30/11/2021 0 1 2 22 0 0 358
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHKB4C 56.35 10 7
2 1BHK B 33.31 9 9
3 2BHK A3C 49.14 10 10
4 2BHK A3TA 49.27 2 2
5 2BHK A3TB 49.11 1 1
6 2BHK A3TC 49.14 1 1
7 2BHK B41A 58.16 20 13
8 1BHK C 33.34 9 9
9 1.5BHK RA 46.18 2 2
10 1.5BHK RB 46.21 1 1
11 1.5BHK Refuge T 49.41 1 1
12 2BHK A3A 49.27 20 20
13 2BHK A3B 49.11 10 10
14 2BHKB4TB 56.2 2 1
15 2BHKB4TC 56.35 1 0
16 2BHKB41TA 58.16 2 0
17 2BHKB41TB 59.29 2 0
18 2BHKB4A 57.78 10 8
19 2BHKB4B 56.2 20 16
20 2BHK B41C 59.29 18 14
21 2BHK B41D 58.92 2 2
22 2BHKB4TA 57.78 1 0
23 1BHK A Top 33.31 2 2
24 1BHK A 33.31 16 16
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 22
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 94
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

99
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 92
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90.7

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Capacit'e NA Contractor
Rana Ram NA Architect
Abhijit Konde NA Architect
Master Plan Landscape Architects NA Architect
JW Consultants LLp NA Engineer
SN Joshi Consultants Private Limited NA Contractor
Ultra Tech Environmental NA Other Professional
RSP Design Consultants NA Other Professional
Rajyog Earth Movers NA Contractor
Urban Link Consulting Private Limited A52100001054 Real Estate Agent
RENU SINGH A52100000118 Real Estate Agent
Mukesh Vinayak Charbhe A52100002920 Real Estate Agent
A K Properties A52100000622 Real Estate Agent
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
Addressofchoice Realty Pvt Ltd A52100000116 Real Estate Agent
BRE HOME A51700000656 Real Estate Agent
SAURAJ TIWARI A52100001440 Real Estate Agent
COLLAN JOSEPH MENDONSA A52100001238 Real Estate Agent
ROCKHOLDINGS REALTY LLP A52100001126 Real Estate Agent
Pankaj Kumar Chaurasia A52100000283 Real Estate Agent
Santosh Kothari A52100002328 Real Estate Agent
VIJAY LACHHMANDAS JUMANI A52100004203 Real Estate Agent
GAURAV SURESH NAHTA A52100003487 Real Estate Agent
OPTIMUS REALTORS A52100000310 Real Estate Agent
ELARA MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
Anuj kumar Mathur A52100001379 Real Estate Agent
SPACEINDIA NEST LLP A52100002248 Real Estate Agent
Nitesh Roop Narayan Khare A52100000106 Real Estate Agent
Ashwin Bhishma Vohra A52100002999 Real Estate Agent
GLADWIN BAPTIST A52100002660 Real Estate Agent
ABHIJIT SAHEBRAO SABBARWAR A52100000382 Real Estate Agent
KULWANT PRATAP NATH A52100001286 Real Estate Agent
MEHER ARUN JADWANI A52100004149 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
ASHISH MODI A52100003744 Real Estate Agent
Big Deal Properties (India) Pvt. Ltd A52100000579 Real Estate Agent
JONES LANG LASALLE RESIDENTIAL PRIVATE LIMITED A51900000108 Real Estate Agent
PROPFINDER INDIA PRIVATE LIMITED A52100004005 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Purva Silversand High Court Civil SP C S 2033 Civil No Suit NA 2011 Civil revision application is pending as on date
NA
Purva Silversand Civil Court 1670 Civil No Suit NA 2013 Hearing on application for temporary injunction is pending and further proceedings accordingly
NA
Purva Silversand Civil Court 1268 Civil No Suit NA 2016 Matter is kept for argument on exhibit five of the suit petition
NA
Purva Silversand Civil Court 216 Civil No Suit NA 2009 Matter is now pending for filing of additional written statements by the defendants and for further
NA
Purva Silversand High Court 332,380,679 Civil No Appeal NA 2016 The matter is now pending for arguments after cancellation of order passed by previous court
NA
Purva Silversand Civil Court 1263 Civil No Suit NA 2006 Application for filing written statement has been allowed and necessary directions have been issued
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000000183 Mariam Broachwala View Orders
2 CC005000000010546 Amit Agrawal View Orders
3 CC005000000022724 Pradeep Kumar Singh View Orders
4 CC005000000022515 Harsha Vikas Joshi View Orders
5 CC005000000085476 Pune Projects LLP View Orders
6 CC005000000095771 RANA ANAND RANJAN View Orders
7 CC005000000106555 Pune Project LLP View Orders
8 CC005000000106562 Pune Project LLP View Orders
9 CC005000000106565 Pune Project LLP View Orders
10 CC005000000106570 Pune Project LLP View Orders
11 CC005000000116879 Kunal Jayantilal Patadiya View Orders
12 CC005000000116932 MS JYOTI SHYAM MANSUKHANI View Orders
13 CC005000000116932 NARESH SHYAM MANSUKHANI View Orders
14 CC005000000157266 Banibandana Nayak View Orders
15 CC005000000157266 MR DIPAK KUMAR BALABANTARAY View Orders
16 CC005000000116879 Kunal Patadiya View Orders
17 CC005000000177807 DAMODARAN SASIDHARAN View Orders
18 CC005000000177807 MS. BINDU SASI View Orders
19 CC005000000177816 NAGICHETTY PRASAD View Orders
20 CC005000000177816 SANCHITA HARNE View Orders
21 CC005000000177844 AMIT LINGARCHANI View Orders
22 CC005000000177844 MRS PURTI AMIT LINGARCHANI View Orders
23 CC005000000177846 RAVI AGRAWAL View Orders
24 CC005000000177846 LAVINA AGRAWAL View Orders
25 CC005000000177866 D VARADHARAJAN View Orders
26 CC005000000177866 SOUMYA VARADHARAJAN View Orders
27 CC005000000177875 RAHUL SHARMA View Orders
28 CC005000000177875 HARSHITA SHARMA View Orders
29 CC005000000177876 NISHA TALREJA View Orders
30 CC005000000177876 NEELESH BADKUR View Orders
31 CC005000000177883 Prerna Sirohi View Orders
32 CC005000000177913 Rakhi Sarvahi View Orders
33 CC005000000177956 Trupti Vimlakar Deshpande View Orders
34 CC005000000177957 Shrihari Anil Anikhindi View Orders
35 CC005000000177966 Prakash Murarilal Sharma View Orders
36 CC005000000177966 Paras Murarilal Sharma View Orders
37 CC005000000177956 Shrihari Anil Anikhindi View Orders
38 CC005000000177957 Trupti Vimlakar Deshpande View Orders
39 CC005000000198043 Swarup Chakraborty View Orders
40 CC005000000198065 Pradip Haribhau Dhanawade View Orders
41 CC005000000198134 Anita Suresh Sarda View Orders
42 CC005000000198134 Anshul Suresh Sarda View Orders
43 CC005000000198139 Ritu Vishwakarma View Orders
44 CC005000000198139 Shreyas Shankar Rao View Orders
45 CC005000000228332 Vinayak Mishra View Orders
46 CC005000000228332 Sushila Mishra View Orders
47 CC005000000238502 DEEPAK SOFAT View Orders
48 CC005000000238502 NEETU SOFAT View Orders
49 CC005000000238541 PRASHANT MISAL View Orders
50 CC005000000238541 MRS CHETANA PRASHANT MISAL View Orders
51 CC005000000238657 ASIF SHAIKH View Orders
52 CC005000000238657 SOFIA ASIF SHAIKH View Orders
53 CC005000000238770 Vivek Kumar Srivastava View Orders
54 CC005000000238770 MRS. NEHA SRIVASTAVA View Orders
55 CC005000000238771 VINEET KUMAR View Orders
56 CC005000000238779 RAJESH KUMAR PANDEY View Orders
57 CC005000000238779 DEEPTI NAIR View Orders
58 CC005000000248790 RENU DHAMI View Orders
59 CC005000000248790 PANKAJ SINGH KATHAYAT View Orders
60 CC005000000248793 RAVINDRA BHASKAR SHELAR View Orders
61 CC005000000248793 MADURA SHELAR View Orders
62 CC005000000259006 PRAJWAL MUKKAWAR View Orders
63 CC005000000259006 PRADEEP MUKKAWAR View Orders
64 CC005000000259007 Rakesh Kawale View Orders
65 CC005000000259022 AKHIL MURLIDHAR PANPALIYA View Orders
66 CC005000000259022 Nehal Akhil Panpaliya View Orders
67 CC005000000259039 PRIYANKA AMOL GAIKWAD View Orders
68 CC005000000259039 AMOL NILKANTH GAIKWAD View Orders
69 CC005000000259053 Shirish Manshani View Orders
70 CC005000000259053 HARESH MANSHANI View Orders
71 CC005000000259072 ROHIT GUPTA View Orders
72 CC005000000259072 SANJANA MEKAN View Orders
73 CC005000000259080 Ankur Chimanlal Kothari View Orders
74 CC005000000259080 DHARA KOTHARI View Orders
75 CC005000000259085 ANKIT CHAUDHARY View Orders
76 CC005000000259088 SHOBHIT CHAUDHARY View Orders
77 CC005000000259088 SMRITI SHUKLA View Orders
78 CC005000000259206 Pradeepkumar Chanveerappa Motgi View Orders
79 CC005000000259207 Yogiraj Rudrappa Birajdar View Orders
80 CC005000000259209 Amol Sidramappa Malage View Orders
81 CC005000000259210 Rajeevayya Guralingayya Math View Orders
82 CC005000000259211 Dhanappa Ambanna Goranale View Orders
83 CC005000000259263 Saket Subhash Nandurkar View Orders
84 CC005000000259274 Arup Bhattacharya View Orders
85 CC005000000259275 Rakesh kumar View Orders
86 CC005000000259291 ASHISH MAKDE View Orders
87 CC005000000259291 NEHA MISHRA View Orders
88 CC005000000259300 ABHIRAJ ARELE View Orders
89 CC005000000269309 SHIJU CHERIAN View Orders
90 CC005000000269309 LINSA ABRAHAM View Orders
91 CC005000000269403 Amit Singh Pawar View Orders
92 CC005000000279733 ABHIJIT VYAWAHARE View Orders
93 CC005000000279733 Sonam Sapkale View Orders