MahaRERA Application

General Information

Individual

Individual

ASHOK
SURYANARAYAN
SINGH
SURYANARAYAN SINGH
No

Address For Official Communication

SHOP NO 1/2
SWASTIK HEIGHTS
RETIBUNDER ROAD
DOMBIVALI WEST
KALYAN/DOMBIVALI
MAHARASHTRA
Konkan
Thane
Kalyan
421202

Contact Details

02251462222

Past Experience Details

Project

SWASTIK HEIGHTS
New Project
31/03/2022
No
Residential
No
SURVEY NO 364 AND 365
BANGLOW
SWAMINARAYAN CITY
SWAMINARAYAN CITY
ROAD
MAHARASHTRA
Konkan
Thane
Kalyan
THAKURLI
DOMBIVALI WEST
421201
899.0
2
2
0
0.0

FSI Details

0
3297
3297.00

Bank Details

NKGSB CO OP BANK LTD
NKGS0000033

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 BEFORE OC
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : YES 0 BEFORE OC
Fire Protection And Fire Safety Requirements : YES 0 BEFORE OC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 BEFORE OC
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 NA
Water Supply : YES 0 BEFORE OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 BEFORE OC
Storm Water Drains : YES 0 BEFOE OC
Landscaping & Tree Planting : NO 0 NA
Street Lighting : YES 0 BEFORE OC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 0 BEFORE OC

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SWASTIK HEIGHTS D WING 31/03/2022 0 1 0 8 1 10 22
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 854 28 0
2 1RK 160.44 7 0
3 1BHK 233.38 7 0
4 1BHK 224.7 7 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 SWASTIK HEIGHTS E WING 31/03/2022 0 1 0 8 1 8 15
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 378.7 14 0
2 1BHK 37.19 1 0
3 1BHK 241.98 6 0
4 1BHK 240.52 7 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
CA SANA SHAKIR SAYED NA Chartered Accountant
DESIGN MARK & ASSOCIATES NA Architect
DESIGN MARK & ASSOCIATES NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval / NA Order for plotted development
Building Plan Approval / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other