MahaRERA Application

General Information

Other Than Individual

Organization

Kalpataru Homes Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

101
Kalpataru Synergy
Vakola
Santacruz East
Opp. Grand Hyatt
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400055

Organization Contact Details

02230645000
www.kalpataru.com

Past Experience Details

Member Information

Member Name Designation Photo
Amit Shah Authorized Signatory View Photo

Project

Paramount E
New Project
30/06/2025
Yes
Residential
No
S.No. 115/10/2-Part and 115/8/2-Part of Village Majiwada
SNo 115-10-2 and Pt 115-8-2 Pt Village Majiwada
Sno 115-10-2 Pt of village Majiwada
Sno 115-10-2 and115-8-2 Pt of village Majiwada
Sno 115-10-2 Pt of Village Majiwada
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
Majiwada
Thane
400608
699.55
1
1
0
0

FSI Details

11637.16
350
11987.16

Bank Details

HDFC Bank Ltd
HDFC0000060

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 453 173 93

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 57 To be done before completion of Whole Project
Internal Roads & Footpaths : YES 0 To be done before completion of Whole Project
Internal Roads & Footpaths : YES 0 To be done before completion of Whole Project
Water Conservation, Rain water Harvesting : YES 67 To be done before completion of Whole Project
Energy management : YES 0 To be done before completion of Whole Project
Energy management : YES 40 To be done before completion of Whole Project
Fire Protection And Fire Safety Requirements : YES 90 To be done before completion of Whole Project
Electrical Meter Room, Sub-Station, Receiving Station : YES 38 Electric Meter Room and Sub-station only
Electrical Meter Room, Sub-Station, Receiving Station : YES 56 Electric Meter Room and Sub-station only
Electrical Meter Room, Sub-Station, Receiving Station : YES 96 Electric Meter Room and Sub-station only
2 Nos of Common Basement : YES 0 Common Develpoment as per AFS
2 Nos of Common Basement : YES 66 Common Develpoment as per AFS
3 Nos of Common Podiums : YES 0 Common Develpoment as per AFS
3 Nos of Common Podiums : YES 63 Common Develpoment as per AFS
Club House, Fitness Centre, Swimming Pool and other Recreational Areas : YES 0 Common Develpoment as per AFS
Club House, Fitness Centre, Swimming Pool and other Recreational Areas : YES 54 Common Develpoment as per AFS
Aggregate area of recreational Open Space : YES 0 5460 Sq.Mtr common RG as per AFS
Aggregate area of recreational Open Space : YES 40 5460 Sq.Mtr common RG as per AFS
Open Parking : YES 0 To be done before completion of Whole Project
Water Supply : YES 0 Supply from local authority
Water Supply : YES 79 Supply from local authority
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 81 STP only
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 89 STP only
Storm Water Drains : YES 31 To be done before completion of Whole Project
Storm Water Drains : YES 68 To be done before completion of Whole Project
Landscaping & Tree Planting : YES 12 To be done before completion of Whole Project
Landscaping & Tree Planting : YES 4 To be done before completion of Whole Project
Landscaping & Tree Planting : YES 49 To be done before completion of Whole Project
Street Lighting : YES 0 To be done before completion of Whole Project
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 To be done before completion of Whole Project
Treatment And Disposal Of Sewage And Sullage Water : YES 90 To be done before completion of Whole Project
Solid Waste Management And Disposal : YES 100 To be done before completion of Whole Project
Solid Waste Management And Disposal : YES 90 To be done before completion of Whole Project

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Paramount E Tower 5 - Alder 31/05/2024 1 1 3 35 1 0 453
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 10347.64 192 175
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 64
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 1
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 13
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

42
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 14
11 Overall Percentage of Completion of the work done For the entire Building /Wing 63.4

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Shapoorji Pallonji & Co. Ltd NA Contractor
M/S Entech Consultant (Form 1 & Form 4) NA Architect
Amjad Tughlaq (Project Engineer) NA Engineer
C R Mohnot & Co (Form 3) NA Chartered Accountant
Khimji Kunverji & Co (Form 5) NA Chartered Accountant
S. N. Joshi Consultants Pvt. Ltd- (MEP Consultant) NA Other Professional
Pravin Gala Consultants Pvt. Ltd- (Structural Consultant) NA Other Professional
Kapadia Associates Design – (Design Consultant) NA Other Professional
Shashi Deshmukh and Associates (Project Architect) NA Other Professional
M/s. Dnyanesh G. Bhave- (Plumbing Consultant) NA Other Professional
Horizon Financial &Properties Advisers Private Limited A51800001892 Real Estate Agent
BULLMEN REALTY INDIA PRIVATE LIMITED A51900009197 Real Estate Agent
Rudram Realty A51900003315 Real Estate Agent
ZENITH SPACE REALTY A51700004091 Real Estate Agent
Victor DSouza A51700006040 Real Estate Agent
Pyramid Homes A51700004003 Real Estate Agent
PROPTIGER MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
HANUMANDIN RAMPRASAD GUPTA A51800009828 Real Estate Agent
Home Bazaar Services Pvt Ltd A52000000045 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Paramount E Bombay High Court 971 Civil Yes Writ Petition NA 2005 Pending
Paramount E Additional Collector Appeal Thane 10 Civil No Appeal NA 2012 Pending
NA
Paramount E Bombay High Court 4977 Civil No Writ Petition NA 2018 Pending
NA
Paramount E Bombay High Court 13451 Civil Yes Writ Petition NA 2018 Pending

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement