Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
1 |
Godrej Infinity
|
TOWER T1
|
31/03/2020
|
0
|
0
|
2
|
28
|
0 |
14 |
103 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
3BHK |
82.38 |
3 |
3 |
2 |
3BHK |
77.82 |
14 |
14 |
3 |
3BHK |
82.11 |
14 |
14 |
4 |
3BHK |
78.84 |
1 |
1 |
5 |
3BHK |
79.39 |
1 |
1 |
6 |
3BHK |
80.21 |
1 |
1 |
7 |
3BHK |
81.38 |
2 |
2 |
8 |
3BHK |
82.37 |
2 |
2 |
9 |
3BHK |
80.65 |
1 |
1 |
10 |
3BHK |
77.81 |
2 |
2 |
11 |
3BHK |
78.62 |
10 |
10 |
12 |
3BHK |
77.57 |
11 |
11 |
13 |
3BHK |
82.12 |
10 |
10 |
14 |
3BHK |
81.32 |
11 |
11 |
15 |
3BHK |
81.5 |
10 |
10 |
16 |
3BHK |
78.38 |
3 |
3 |
17 |
3BHK |
78.45 |
2 |
2 |
18 |
3BHK |
79.55 |
1 |
1 |
19 |
3BHK |
81.37 |
1 |
1 |
20 |
3BHK |
78.37 |
11 |
11 |
21 |
3BHK |
78.61 |
1 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
2 |
Godrej Infinity
|
TOWER T2
|
31/03/2020
|
0
|
0
|
2
|
24
|
0 |
19 |
173 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2BHK |
50.49 |
2 |
2 |
2 |
2BHK |
50.74 |
2 |
2 |
3 |
2BHK |
50.76 |
2 |
2 |
4 |
2BHK |
52.28 |
1 |
1 |
5 |
2BHK |
52.29 |
1 |
1 |
6 |
2BHK |
53.04 |
2 |
2 |
7 |
2BHK |
53.06 |
2 |
2 |
8 |
2BHK |
53.39 |
1 |
1 |
9 |
2BHK |
53.4 |
1 |
1 |
10 |
2BHK |
53.68 |
4 |
4 |
11 |
2BHK |
55.17 |
22 |
22 |
12 |
2BHK |
53.35 |
8 |
8 |
13 |
2BHK |
53.37 |
8 |
8 |
14 |
2BHK |
54.2 |
16 |
16 |
15 |
2BHK |
50.43 |
16 |
16 |
16 |
2BHK |
51.28 |
8 |
8 |
17 |
2BHK |
51.3 |
8 |
8 |
18 |
2BHK |
52.22 |
44 |
44 |
19 |
2BHK |
55.14 |
22 |
22 |
20 |
2BHK |
49.37 |
1 |
1 |
21 |
2BHK |
49.45 |
1 |
1 |
22 |
2BHK |
50.12 |
4 |
4 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
3 |
Godrej Infinity
|
TOWER T3
|
31/03/2020
|
0
|
0
|
2
|
24
|
0 |
45 |
175 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2BHK |
60.22 |
1 |
1 |
2 |
2BHK |
63.21 |
2 |
2 |
3 |
2BHK |
63.93 |
10 |
10 |
4 |
1BHK |
37.21 |
2 |
2 |
5 |
2BHK |
61.44 |
3 |
3 |
6 |
2BHK |
63.69 |
2 |
2 |
7 |
2BHK |
67.72 |
11 |
11 |
8 |
2BHK |
61.62 |
19 |
19 |
9 |
1BHK |
37.24 |
18 |
18 |
10 |
2BHK |
67.7 |
11 |
11 |
11 |
1BHK |
37.69 |
22 |
22 |
12 |
2BHK |
65.61 |
18 |
18 |
13 |
2BHK |
64.71 |
11 |
11 |
14 |
2BHK |
63.59 |
22 |
22 |
15 |
1BHK |
36.91 |
4 |
4 |
16 |
2BHK |
60.21 |
1 |
1 |
17 |
2BHK |
64.89 |
2 |
2 |
18 |
1BHK |
39.29 |
20 |
20 |
19 |
2BHK |
64.11 |
8 |
8 |
20 |
2BHK |
64.7 |
11 |
11 |
21 |
2BHK |
64.75 |
20 |
20 |
22 |
2BHK |
65.37 |
2 |
2 |
23 |
2BHK |
62.24 |
22 |
22 |
24 |
1BHK |
37.5 |
18 |
18 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
4 |
Godrej Infinity
|
TOWER T4
|
31/03/2020
|
0
|
0
|
3
|
24
|
0 |
148 |
140 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2BHK |
65.56 |
10 |
10 |
2 |
2BHK |
65.57 |
12 |
12 |
3 |
2BHK |
67.02 |
11 |
11 |
4 |
2BHK |
67.21 |
11 |
11 |
5 |
1BHK |
37.37 |
20 |
20 |
6 |
2BHK |
62.7 |
10 |
10 |
7 |
2BHK |
64.61 |
1 |
1 |
8 |
1BHK |
37.68 |
20 |
20 |
9 |
1BHK |
36.99 |
22 |
22 |
10 |
2BHK |
64.18 |
10 |
10 |
11 |
2BHK |
61.87 |
11 |
11 |
12 |
2BHK |
60.23 |
1 |
1 |
13 |
2BHK |
61.86 |
11 |
11 |
14 |
2BHK |
63.09 |
22 |
22 |
15 |
2BHK |
61.45 |
12 |
12 |
16 |
2BHK |
64.36 |
22 |
22 |
17 |
2BHK |
62.72 |
10 |
10 |
18 |
2BHK |
65.4 |
10 |
10 |
19 |
1BHK |
37.29 |
20 |
20 |
20 |
2BHK |
60.22 |
10 |
10 |
21 |
2BHK |
62.71 |
2 |
2 |
22 |
1BHK |
37.52 |
2 |
2 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
5 |
Godrej Infinity
|
TOWER T5
|
31/03/2020
|
0
|
0
|
3
|
24
|
0 |
19 |
211 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2BHK |
61.44 |
4 |
4 |
2 |
2BHK |
62.25 |
2 |
2 |
3 |
2BHK |
63.21 |
1 |
1 |
4 |
2BHK |
67.71 |
2 |
2 |
5 |
2BHK |
67.8 |
18 |
18 |
6 |
1BHK |
37.69 |
20 |
20 |
7 |
2BHK |
62.24 |
2 |
2 |
8 |
2BHK |
63.47 |
4 |
4 |
9 |
2BHK |
64.11 |
16 |
16 |
10 |
2BHK |
67.57 |
2 |
2 |
11 |
1BHK |
37.34 |
18 |
18 |
12 |
2BHK |
61.54 |
1 |
1 |
13 |
2BHK |
61.62 |
17 |
17 |
14 |
2BHK |
62.34 |
18 |
18 |
15 |
2BHK |
63.68 |
18 |
18 |
16 |
2BHK |
63.69 |
4 |
4 |
17 |
2BHK |
65.61 |
16 |
16 |
18 |
2BHK |
60.22 |
1 |
1 |
19 |
2BHK |
64.73 |
4 |
4 |
20 |
1BHK |
37.08 |
18 |
18 |
21 |
2BHK |
65.37 |
4 |
4 |
22 |
1BHK |
37.21 |
2 |
2 |
23 |
2BHK |
63.32 |
1 |
1 |
24 |
2BHK |
64.8 |
18 |
18 |
25 |
2BHK |
64.89 |
2 |
2 |
26 |
1BHK |
39.29 |
20 |
20 |
27 |
2BHK |
64.75 |
20 |
20 |
28 |
1BHK |
36.91 |
4 |
4 |
29 |
1BHK |
38.99 |
2 |
2 |
30 |
2BHK |
60.21 |
1 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
6 |
Godrej Infinity
|
TOWER T6
|
31/03/2020
|
0
|
0
|
2
|
17
|
0 |
4 |
131 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
3BHK |
92.29 |
1 |
1 |
2 |
3BHK |
99.77 |
8 |
8 |
3 |
3BHK |
100.2 |
9 |
9 |
4 |
3BHK |
85.73 |
8 |
8 |
5 |
3BHK |
89.87 |
8 |
8 |
6 |
3BHK |
90.6 |
8 |
8 |
7 |
3BHK |
91.99 |
8 |
8 |
8 |
3BHK |
95.26 |
9 |
9 |
9 |
3BHK |
92.68 |
1 |
1 |
10 |
3BHK |
91.04 |
1 |
1 |
11 |
3BHK |
91.2 |
1 |
1 |
12 |
3BHK |
87.62 |
8 |
8 |
13 |
3BHK |
90.18 |
8 |
8 |
14 |
3BHK |
95.14 |
8 |
8 |
15 |
3BHK |
85.96 |
1 |
1 |
16 |
3BHK |
85.08 |
8 |
8 |
17 |
3BHK |
87.6 |
1 |
1 |
18 |
3BHK |
86.89 |
8 |
8 |
19 |
3BHK |
94.45 |
16 |
16 |
20 |
3BHK |
90.76 |
8 |
8 |
21 |
3BHK |
95.55 |
8 |
8 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
100
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
7 |
Godrej Infinity
|
Town Square Retail
|
31/03/2020
|
0
|
1
|
0
|
1
|
0 |
0 |
0 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
Shop |
36.04 |
1 |
1 |
2 |
Shop |
36.04 |
1 |
1 |
3 |
Shop |
36.04 |
1 |
1 |
4 |
Shop |
36.04 |
1 |
1 |
5 |
Shop |
36.04 |
1 |
1 |
|
|
|
|
|
|